| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | administrative | operational | mandatory | Dewatering Permit Approval | wastewater, other | Before you can release waste into either a sanitary sewer or storm sewer system, you must have approval from the City of Red Deer’s Utilities department. | Applies whenever you directly or indirectly release water to the stormwater or sanitary sewer system. This does not include regular use through existing systems or using a fire hydrant/flushing water. | high |
| #Q002 | operational | operational | mandatory | Regulatory Compliance for Releases | wastewater, other | You are also required to release in compliance with local, provincial and federal regulations and in a way that does not violate water quality standards. | During release of water to the stormwater or sanitary sewer system. | high |
| #Q003 | monitoring | reporting | mandatory | Discharge Sampling and Certification | wastewater, other | We may ask you to sample and certify that the discharge complies with the limits of the receiving waterbody, but you will be informed if this is needed during the application process. | If required and informed by the utilities department during the application process. | high |
| #Q004 | administrative | operational | mandatory | Dewatering Permit Requirement (Water) | wastewater, other | Dewatering permits are required whenever you directly or indirectly release water to the stormwater or sanitary sewer system. | Does not include regular use through existing systems or hydrant/flushing water use. | high |
No quantitative requirements.
No definitions.