| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | design | operational | guidance | Plumbing Standards Guidance | wastewater, other | Plumbing requirements for non-potable water systems are addressed by CSA Standard B128.1-06/B128.2-06, Design and installation of non-potable water systems/Maintenance and field testing of non-potable water systems (CSA, 2006). | Applies to design, installation, maintenance, and field testing of non-potable water systems. | high |
| #Q002 | administrative | health | recommended | Management Program Development | wastewater, other | It is recommended that authorities develop and implement a management program for domestic reclaimed water systems, giving due consideration to the protection of public health, local administrative and operational capacity, and economic considerations. | high | |
| #Q003 | operational | treatment | recommended | Site-Specific Risk Assessment | wastewater, other | A site-specific risk assessment should be conducted initially to determine the appropriate levels of microbiological reduction or inactivation needed for the specific system. | To be conducted initially for the specific system. | high |
| #Q004 | treatment | treatment | recommended | Treatment Technology Performance | wastewater, other | Treatment technologies used should consistently achieve the guideline levels established in this document. | high | |
| #Q005 | monitoring | operational | recommended | Operational Oversight and Monitoring | wastewater, other | Operational oversight, inspections and ongoing monitoring should form key components of a management program to ensure that treatment of reclaimed water is effective on a long-term basis. | As part of the management program. | high |
No quantitative requirements.
No definitions.