| #Q001 | administrative | reporting | mandatory | Future Studies and Monitoring | wastewater | Additional research, studies, monitoring, dialogue with the Regulator, and public consultation to be conducted in next 10 years to better assess needs, timing, and costs of future actions. | To be conducted in the next 10 years | high |
| #Q002 | treatment | treatment | mandatory | NEWPCC Centrate Treatment | wastewater | Implement Centrate Treatment (2005) | At NEWPCC | high |
| #Q003 | treatment | treatment | mandatory | WEWPCC Ammonia Removal | wastewater | Continue use of polishing ponds for ammonia removal | At WEWPCC | high |
| #Q004 | treatment | treatment | mandatory | SEWPCC Secondary Treatment | wastewater | Continue secondary treatment process | At SEWPCC | high |
| #Q005 | monitoring | operational | mandatory | SEWPCC Monitoring Requirements | wastewater | Monitor:
- Plant performance
- River Quality
- Wastewater flows | At SEWPCC | high |
| #Q006 | administrative | unknown | recommended | Nutrient Limits Establishment Prerequisites | wastewater | The City recommends that limits for N and P not be established until:
- Province completes basin-wide Nutrient Management Study, and
- Province conducts stakeholder and public consultations | | high |
| #Q007 | administrative | health | recommended | Fecal Coliform Limits Establishment | wastewater, recreational water | Limits for fecal coliform be established to protect summer recreational use of Rivers. | | high |
| #Q008 | corrective_action | operational | mandatory | NEWPCC Recommendation Response | wastewater | City will respond to recommendations for design and operational changes at the NEWPCC | At the NEWPCC | high |
| #Q009 | administrative | operational | mandatory | WPCC Risk and Criticality Assessments | wastewater | City will undertake Risk and Criticality Assessments at the three WPCCs | 12-month study, to be complete in 2004 | high |
| #Q010 | operational | operational | mandatory | Treatment Systems Reliability Assessment | wastewater | Assess reliability and backup capability of treatment systems | | high |
| #Q011 | administrative | operational | mandatory | Risk Reduction Plan Development | wastewater | Estimate mitigation costs, and develop risk reduction plan | | high |
| #Q012 | corrective_action | operational | mandatory | Untreated Sewage Discharge Mitigation | wastewater | Implement mitigation measures to prevent discharge of untreated sewage | | high |
| #Q013 | monitoring | operational | mandatory | Routine River Monitoring | other | Year-round bi-weekly sampling on the Red and Assiniboine Rivers since 1977 at 11 locations. | Routine River Monitoring done by City of Winnipeg | high |
| #Q014 | treatment | treatment | mandatory | NEWPCC Disinfection Implementation | wastewater | In place for May 1, 2005 | For NEWPCC disinfection | high |
| #Q015 | operational | operational | mandatory | CSO Control Program Adoption | wastewater | Long-term CSO control program be adopted in principle to reduce overflow events | City-wide average of 4 events per summer recreation season (reduced from 18 events) | high |