Document ID ca-mb-scrmt-2008-02-22 Title SUMMARY OF COMMENTS/RECOMMENDATIONS Rural Municipality of Taché - L.U.D. of Landmark Wastewater Stabilization Pond Expansion URL https://www.gov.mb.ca/sd/eal/archive/1995/summaries/2709-2.pdf Jurisdiction /ca/mb Subdomain(s) Wastewater Treatment, Permitting & Zoning Language en Status completed Analyzed at 2026-03-25 22:19:17.000705+00:00 Relevance Document details permitting and design requirements for a wastewater facility.

Q Qualitative Requirements (8)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatorySediment and Erosion Controlwastewatersediment and erosion control measures to prevent sedimentation of the Seine River Diversion will be implemented and maintained until adequate vegetation is re-established at the site.During construction and until adequate vegetation is re-establishedhigh
#Q002monitoringreportingmandatoryGeneral Effluent MonitoringwastewaterThe draft Environment Act Licence includes a clause that requires that the Licencee, during each effluent discharge campaign from the wastewater treatment lagoon, obtain samples of effluent to be collected during the beginning, middle and end of each discharge event. The samples shall be preserved, analyzed and reported in accordance with the requirements of Clause 3 of this Licence, and shall be analyzed for: ammonia; pH; and temperature.During each effluent discharge campaignhigh
#Q003monitoringreportingmandatoryNutrient Effluent MonitoringwastewaterThe draft Environment Act includes a clause that requires the Licencee, for a period of at least three years following the commencement of operation of the wastewater treatment lagoon under this Licence and during each effluent discharge campaign from the wastewater treatment lagoon, obtain samples of effluent to be collected during the beginning, middle and end of each discharge event. The samples shall be preserved, analyzed and reported in accordance with the requirements of Clause 3 of the Licence, and shall be analyzed for: total Kjeldahl nitrogen; nitrate-nitrite nitrogen; total dissolved phosphorus; total particulate phosphorus; and total inorganic phosphorus;For a period of at least three years following the commencement of operation, during each effluent discharge campaignhigh
#Q004administrativeoperationalmandatoryWatershed Management ParticipationwastewaterThe draft Environment Act Licence requires that the Licencee actively participate in any future watershed based management study, plan or nutrient reduction program, approved by the Director, for the Red River and Lake Winnipeg and associated waterways and watershedsUpon approval of future watershed based management study, plan or nutrient reduction program by the Directorhigh
#Q005designoperationalmandatoryFuture Standards PositioningwastewaterThe Licencee has agreed to make efforts to position themselves to achieve future standards regarding municipal effluent discharge limits, such as nutrients, and is confirming the availability of adjacent lands for purchase in the event that a decision is made to modify the treatment process and/or to expand the storage capacity of the wastewater treatment lagoon.medium
#Q006monitoringoperationalmandatorySoil Sampling and Liner TestingwastewaterThe draft Environment Act Licence contains clauses that require soil sampling and testing of, and specific characteristics for, the liner of the new cell of the wastewater treatment lagoon.During and after construction of the new cell linerhigh
#Q007operationaloperationalmandatoryEffluent Discharge WindowwastewaterTreated wastewater from the wastewater treatment lagoon will be discharged between June 15th and November 1st of any year to an existing municipal drain that discharges into the Seine River Diversion that discharges into the Red River.During any year of operationhigh
#Q008designoperationalmandatoryWaterbody Setback Distancewastewaterthis facility will be built 15 metres from the top of banks of the Seine River Diversion.Facility expansion constructionhigh

P Quantitative Requirements (6)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001chemicaltreatmentrecommendedphosphoruswastewaterrequirement1.0 mg/LThe Lake Winnipeg Stewardship Board has recommended that all small wastewater treatment facilities, including municipal lagoons, should meet a phosphorus limit of 1.0 mg/L.small wastewater treatment facilities, including municipal lagoonshigh
#P002designoperationalmandatoryset-back distancewastewaterrequirement>= 3 metresAs per the proposed Nutrient Management Regulation under The Water Protection Act, a minimum set-back distance of 3 metres is required between the facility and the Seine River Diversion.Between the facility and the Seine River Diversionhigh
#P003operationaloperationalmandatoryDischarge WindowwastewaterrequirementJune 15 to November 1 date rangeTreated wastewater from the wastewater treatment lagoon will be discharged between June 15th and November 1st of any year.During any year of operationhigh
#P004operationalreportingmandatoryPost-Commissioning Monitoring Periodwastewaterrequirement>= 3 yearsThe draft Environment Act includes a clause that requires the Licencee, for a period of at least three years following the commencement of operation...Following the commencement of operation of the wastewater treatment lagoonhigh
#P005designoperationalmandatorySite-Specific Setback Distancewastewaterrequirement15 metresThe Department is agreeable with the proponent's response regarding water quality management zone setback distances, this facility will be built 15 metres from the top of banks of the Seine River Diversion.From the top of banks of the Seine River Diversionhigh
#P006operationalreportingmandatoryEffluent Sampling Frequencywastewaterrequirement3 samples per discharge eventobtain samples of effluent to be collected during the beginning, middle and end of each discharge event.During each effluent discharge campaignhigh

D Definitions (0)

No definitions.