Document ID ca-mb-wnnlpdbitp-2019-12-14 Title WETLAND NO NET LOSS PLAN DEVELOPED FOR THE BIPOLE III TRANSMISSION PROJECT URL https://www.gov.mb.ca/sd/eal/registries/5433bipole/wetland_offset_plan.pdf Jurisdiction /ca/mb Subdomain(s) Permitting, zoning & urban planning Language en Status completed Analyzed at 2026-03-25 22:20:40.265864+00:00 Relevance Defines mitigation and compensation requirements for wetland impacts per license.

Q Qualitative Requirements (18)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001operationaloperationalmandatoryRiparian Buffer Zone MaintenanceotherTo ensure no net loss of wetlands, the Licencee shall, during construction and maintenance of the Development, maintain a minimum 30 meter riparian buffer zone immediately adjacent to wetlands and the shoreline of lakes, rivers, creeks, and streams.During construction and maintenance of the Developmenthigh
#Q002operationaloperationalmandatoryLow Impact Tree Clearing Methodsothertrees that must be removed shall be cleared using only low impact methods including hand clearing;Within the minimum 30 meter riparian buffer zonehigh
#Q003operationaloperationalmandatoryLow Growth Vegetation Maintenanceotherall existing low growth vegetation such as grasses, shrubs, and willows shall be maintained;Within the minimum 30 meter riparian buffer zonehigh
#Q004prohibitionoperationalmandatoryHerbicide Application Prohibitionotherthe application of herbicides shall be prohibited;Within the minimum 30 meter riparian buffer zonehigh
#Q005corrective_actionoperationalmandatoryWetland Area Restoration and Offsetotherany affected wetland area will be restored, replaced or offset as approved by the Director to ensure no net loss of wetlands.high
#Q006operationaloperationalmandatoryShrub and Herbaceous Vegetation RetentionotherShrub and herbaceous vegetation will be retained where possible;Where possible, when a component of the Bipole III Transmission project intersects wetlandshigh
#Q007operationaloperationalmandatoryTree RetentionotherTrees that do not violate MH vegetation clearance requirement will be retained, where possible;Where possible, if they do not violate MH vegetation clearance requirementhigh
#Q008prohibitionoperationalmandatoryMachine Free Zone Restrictionsother7 meter Machine Free Zone (MFZ) - no equipment within MFZ except at trail crossing. Machinery allowed to reach into zone with cutting equipment but not enter.Within the 7 meter Machine Free Zone of the riparian bufferhigh
#Q009operationaloperationalmandatoryManagement Zone Clearing RestrictionsotherManagement Zone (MZ) - only low disturbance clearing permitted.Within the Management Zone of the riparian bufferhigh
#Q010monitoringoperationalmandatoryPost-Construction Restoration AssessmentotherAn assessment would be done after construction to evaluate potential for restoration and to develop a plan for restoration.After constructionhigh
#Q011administrativereportingmandatoryInfeasible Restoration AccountingotherIf the assessment indicates restoration is not feasible, then the wetland area would be added to the overall loss of wetlands.If the post-construction assessment indicates restoration is not feasiblehigh
#Q012administrativeunknownmandatoryWetland Compensation Fund ContributionsotherAny contributions by Manitoba Hydro in fulfillment of the obligation for wetland compensation for Bipole III would be made to Manitoba Habitat Heritage Corporation to be held in trust for projects deemed appropriate by MCC.In fulfillment of the obligation for wetland compensationhigh
#Q013reportingreportingmandatoryCompensation Fund Reporting by MCCotherMCC will provide Manitoba Hydro, for information only, with a report on compensation projects funded through money provided by Manitoba Hydro.high
#Q014administrativeoperationalmandatoryCompensation Fund OversightotherMCC will be responsible for developing and ensuring that the Manitoba Habitat Heritage Corporation meets the requirements associated with this condition.high
#Q015operationaloperationalmandatoryFrozen Ground Clearing ProtocolotherOne of the most effective measures to minimize disturbance to wetlands areas is limiting clearing activity to frozen ground conditions.During clearing activities to minimize disturbancehigh
#Q016monitoringreportingmandatoryPost-Construction Loss SurveyotherOnce the project is fully constructed the line will be surveyed an exact area of wetland loss can be calculated.Once the project is fully constructedhigh
#Q017administrativeunknownmandatoryNorthern Mitigation Fund AllocationotherThe Northern portion of the lines (N1, N2, N3 and N4) will be directed toward projects outside of the southern agricultural landscape.For compensation projects associated with project sections N1 to N4high
#Q018corrective_actionoperationalrecommendedEcological Restoration PrescriptionotherRestoration would primarily include rut damage repair and stream bank stabilization/revegetation along with other restoration techniques as prescribed by a vegetation ecologist.When restoration is performedhigh

P Quantitative Requirements (36)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001operationaloperationalmandatoryRiparian buffer zoneotherrequirement>= 30 meterMaintain a minimum 30 meter riparian buffer zone immediately adjacent to wetlands and the shoreline of lakes, rivers, creeks, and streams.During construction and maintenance of the Developmenthigh
#P002operationaloperationalmandatoryMachine Free Zone (MFZ)otherrequirement7 meterRiparian buffers are divided into 2 zones. No equipment within MFZ except at trail crossing.Machinery allowed to reach into zone with cutting equipment but not enter.high
#P003operationaloperationalmandatoryWetland compensation ratiootherrequirement3 :1For the loss of wetlands in southern Manitoba, a compensation ratio of 3:1 will be used. This aligns with the current regulations under The Water Rights Act.Applied to permanent wetland losshigh
#P004operationaloperationalmandatoryWetland compensation valuation (N1 to N4)otherrequirement500.00 $/hectareUsed to calculate compensation in sections N1 to N4, the northernmost range of the Bipole III Transmission project.Calculated at a 3:1 ratiohigh
#P005operationaloperationalmandatoryWetland compensation valuation (C1 and C2)otherrequirement14820 $/hectareUsed to calculate compensation, in the C1 and C2 sections of the project.Calculated at a 3:1 ratiohigh
#P006designoperationalmandatory500 kV Construction Trail Widthotherrequirement7 meterWidth used for calculating wetland area affected by construction trails.During construction of 500 kV linehigh
#P007designoperationalmandatoryAccess Route Widthotherrequirement15 meterWidth used for calculating wetland area affected by access routes.For Project access routeshigh
#P008operationalreportingmandatoryTotal Estimated Permanent Wetland Lossotherrequirement118 hectareIn total, an estimated 118 hectares (ha) of wetland in all categories are considered as potential wetland loss for the Bipole III Project.Total calculated area across all project componentshigh
#P009operationalreportingmandatoryTotal Wetland Compensation Financial Obligationotherrequirement886699.20 $Total cost calculated based on wetland loss in northern and southern sections.Based on 3:1 compensation ratiohigh
#P010operationalreportingguidanceEstimated Permanent Area Affected Percentage for Trailsotherrequirement10 %Percentage used to estimate the permanent area of wetland loss for 500 kV Construction Trails and Access Routes.Applied to total wetland area intersected by trails/access routeshigh
#P011designoperationalmandatoryTower Foundation Area (Earth Substrate - Type A-530)otherrequirement244 m^2Approximate dimension used for calculating wetland loss for tower foundations in earth substrate.Applies to Tower Type A-530 in Earth Substratehigh
#P012designoperationalmandatoryTower Foundation Area (Rock Substrate - All P/A/B Types)otherrequirement9 m^2Approximate dimension used for calculating wetland loss for tower foundations in rock substrate.Applies to Tower Types A-530, A-531, A-532, A-540, B-530, and P-530 in Rock Substratehigh
#P013designoperationalmandatoryTower Foundation Area (Type C-530 - Earth Substrate)otherrequirement733 m^2Dimension used for calculating wetland loss for large-scale tower foundations in earth substrate.Applies to Tower Type C-530 in Earth Substratehigh
#P014designoperationalmandatoryTower Foundation Area (Type C-530 - Standard Substrate)otherrequirement198 m^2Dimension used for calculating wetland loss for large-scale tower foundations in standard substrate.Applies to Tower Type C-530 in Standard Substratehigh
#P015designoperationalmandatoryTower Foundation Area (Type C-530 - Rock Substrate)otherrequirement28 m^2Dimension used for calculating wetland loss for large-scale tower foundations in rock substrate.Applies to Tower Type C-530 in Rock Substratehigh
#P016designoperationalmandatoryTower Foundation Area (Type P-530 - Earth Substrate)otherrequirement263 m^2Dimension used for calculating wetland loss for specific tower foundations in earth substrate.Applies to Tower Type P-530 in Earth Substratehigh
#P017designoperationalmandatoryTower Foundation Area (Type B-540 - Rock Substrate)otherrequirement22 m^2Dimension used for calculating wetland loss for specific tower foundations in rock substrate.Applies to Tower Type B-540 in Rock Substratehigh
#P018designoperationalmandatoryTransmission Line Right-of-Way (ROW) Widthotherrequirement66 meterThe standard width of the transmission line right-of-way used for footprint calculations.Applicable to Bipole III transmission line footprinthigh
#P019designoperationalmandatoryTower Foundation Area (Specialty Substrate - A and P Types)otherrequirement9 m^2Approximate dimension used for calculating wetland loss for tower foundations in specialty substrate.Applies to Tower Types A-530, A-531, A-532, A-540, B-530, and P-530 in Specialty Substratehigh
#P020physicalreportingmandatoryKeewatinohk Lagoon Wetland Area Affectedotherrequirement12 hectareEstimated area of wetlands affected associated with the Keewatinohk Lagoon infrastructure.Component of the Bipole III Projecthigh
#P021physicalreportingmandatoryExcavated Material Placement Areas Wetland Area Affectedotherrequirement29 hectareEstimated area of wetlands affected associated with excavated material placement areas.Component of the Bipole III Projecthigh
#P022physicalreportingmandatory500 kV Line tower foundations wetland lossotherrequirement21 hectareEstimated permanent area of wetlands affected by 500 kV line tower footings.Calculated at 100% of footprinthigh
#P023physicalreportingmandatory500 kV Construction Trails permanent wetland lossotherrequirement22 hectareEstimated permanent area of wetlands affected by 500 kV construction trails.Calculated as 10% of total 219 ha affected areahigh
#P024physicalreportingmandatory230 kV Collector Lines foundations wetland lossotherrequirement3 hectareEstimated permanent area of wetlands affected by 230 kV collector lines tower footings.Calculated at 100% of footprinthigh
#P025physicalreportingmandatory230 kV Construction Trails permanent wetland lossotherrequirement2 hectareEstimated permanent area of wetlands affected by 230 kV construction trails.Calculated at 100% of footprinthigh
#P026physicalreportingmandatoryKeewatinohk Converter Station Site wetland lossotherrequirement2 hectareEstimated permanent area of wetlands affected by Keewatinohk Converter Station infrastructure.Calculated at 100% of footprinthigh
#P027physicalreportingmandatoryKeewatinohk Ground Electrode wetland lossotherrequirement6 hectareEstimated permanent area of wetlands affected by Keewatinohk Ground Electrode infrastructure.Calculated at 100% of footprinthigh
#P028physicalreportingmandatoryConstruction Work Areas wetland lossotherrequirement8 hectareEstimated permanent area of wetlands affected by planned construction work area infrastructure.Calculated at 100% of footprinthigh
#P029designoperationalmandatoryTower Foundation Area (Earth Substrate - Type A-540 and B-540)otherrequirement47 m^2Approximate dimension used for calculating wetland loss for tower foundations in earth substrate.Applies to Tower Types A-540 and B-540high
#P030designoperationalmandatoryTower Foundation Area (Earth Substrate - Type C-540)otherrequirement63 m^2Approximate dimension used for calculating wetland loss for tower foundations in earth substrate.Applies to Tower Type C-540high
#P031designoperationalmandatoryTower Foundation Area (Earth Substrate - Type D-540)otherrequirement76 m^2Approximate dimension used for calculating wetland loss for tower foundations in earth substrate.Applies to Tower Type D-540high
#P032designoperationalmandatoryTower Foundation Area (Standard Substrate - Types A-530, A-531, A-532, B-530, P-530)otherrequirement66 m^2Dimension used for calculating wetland loss for multiple tower foundations in standard substrate.Applies to Tower Types A-530, A-531, A-532, B-530, and P-530high
#P033physicalreportingmandatoryWetland area affected - 500 kV Construction Trailsotherrequirement219 hectareGross area of wetlands affected by 500 kV construction trails before applying permanent loss percentage.Component of Bipole III Projecthigh
#P034physicalreportingmandatoryWetland area affected - Access Routesotherrequirement139 hectareGross area of wetlands affected by access routes before applying permanent loss percentage.Component of Bipole III Projecthigh
#P035physicalreportingmandatoryPermanent wetland loss - Section N4otherrequirement42.48 hectareEstimated wetland area lost in Section N4, comprising 36% of the total project wetland loss.Used for compensation valuationhigh
#P036physicalreportingmandatoryPermanent wetland loss - Section C1otherrequirement8.26 hectareEstimated wetland area lost in Section C1, comprising 7% of total loss.Used for compensation valuation at southern landscape rateshigh

D Definitions (28)

Req ID Category Name Context Confidence
#D001Wetlandsland that is saturated with water long enough to promote wetland or aquatic processes as indicated by poorly drained soils, hydrophytic vegetation and various kinds of biological activity which are adapted to a wet environment (National Wetlands Working Group 1988)high
#D002Machine Free Zone (MFZ)no equipment within MFZ except at trail crossing. Machinery allowed to reach into zone with cutting equipment but not enter.medium
#D003Management Zone (MZ)only low disturbance clearing permitted.medium
#D004Wetland lossaltering, infilling or physically draining the wetland, any impact to the riparian area and buffers strips, and any type of interference with the hydrology to and from the wetland (Alberta Environment 1997)high
#D005Wetland TreedLand with a water table near/at/above soil surface for enough time to promote wetland or aquatic processes; the majority of vegetation is coniferous, broadleaf, or mixed wood.high
#D006Wetland ShrubLand with a water table near/at/above soil surface for enough time to promote wetland or aquatic processes; the majority of vegetation is tall, low, or a mixture of tall and low shrub.high
#D007Wetland HerbLand with a water table near/at/above soil surface for enough time to promote wetland or aquatic processes; the majority of vegetation is herb.high
#D008compensatory mitigationThe restoration (re-establishment or rehabilitation), establishment (creation), and/or in certain circumstances preservation of aquatic resources for the purposes of offsetting unavoidable adverse impacts which remain after all appropriate and practicable avoidance and minimization has been achieved.high
#D009Restorationinvolves the re-establishment of the hydrologic regime, biological communities and other natural wetland functions in its original location (Alberta Environment 1997).medium
#D010Replacementinvolves wetland construction and creation in locations where none existed previously.medium
#D011Financial compensation or mitigation bankingthe setting aside of funds and/or creation of wetlands to be used in exchange for wetlands lost through development (Environment Canada 1998).medium
#D012Manitoba Hydro (MH)Manitoba Hydrohigh
#D013Manitoba Conservation and Climate (MCC)Manitoba Conservation and Climatehigh
#D014Bipole III Transmission Project (Project)Bipole III Transmission Projecthigh
#D015high voltage direct current (HVDC)high voltage direct currenthigh
#D016kilovolt (kV)kilovolthigh
#D017alternating current (AC)alternating currenthigh
#D018No Net Loss (NNL)No Net Losshigh
#D019Canadian Wetland Classification System (CWCS)Canadian Wetland Classification Systemhigh
#D020Land Cover Classification Enhanced Bipole (LCCEB)Land Cover Classification Enhanced Bipolehigh
#D021Wetland formssubdivisions of classes and are defined according to surface morphology and pattern, water type and underlying mineral soilhigh
#D022Wetland typesdescribed according to physiognomic characteristics of vegetationhigh
#D023Geographic Information System (GIS)Geographic Information Systemhigh
#D024rights-of-way (ROWs)rights-of-wayhigh
#D025Wetland functionsthe processes carried out by wetlands include filtration and improving water quality, regulation of water levels, and providing habitat for aquatic and semi-aquatic specieshigh
#D026Wetland classesinclude bog, fen, swamp, marsh and shallow waterhigh
#D027peatlandsorganic wetlandshigh
#D028hectares (ha)hectareshigh