| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | operational | operational | mandatory | Proponent Mitigation Measures for Construction Site Dewatering | other | Under the requirements of the proposed exemption, proponents would be required to implement any necessary measures to ensure that water quantity and quality are not affected upstream | Under the requirements of the proposed Construction Site Dewatering exemption | medium |
| #Q002 | administrative | operational | mandatory | Ministry Authority for Sewage Works Inspection | wastewater | The ministry would maintain the authority to inspect the sewage works and ensure compliance with all legislative and regulatory requirements and to ensure that the works do not pose an adverse impact. | medium |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #P001 | operational | operational | unknown | Foundation drainage treatment volume | wastewater, other | requirement | < 50000 L/day | If a site is taking and treating less than 50,000 L/day of foundation drainage for discharge to a storm sewer and a PTTW is not required, will an ECA still be required? | Discharge to a storm sewer where a Permit to Take Water (PTTW) is not required. | low |
No definitions.