Parameter Viewer

Document ID ca-on-miacre-2022-04-01-2 Title Mining Act resources URL https://www.ontario.ca/laws/regulation/r21457 Jurisdiction /ca/on Subdomain(s) none Language Status completed Analyzed at 2026-05-12 04:15:16.314706+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (26)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#R001administrativeoperationalmandatorySewage Works Approval Requirementwastewatersection 53 of the OWRA requires approval prior to using, operating, establishing, altering, extending or replacing new or existing sewage worksBefore using, operating, establishing, altering, extending or replacing sewage workshigh
#R002administrativeoperationalmandatoryStorm Water Management Works EASR RegistrationotherYou must register your storm water management works in the EASR when they meet all the following criteria: the works are not owned by a municipality or will not be assumed by a municipality in the future; any processing, repair or maintenance of goods and materials at the property where the works are located are conducted indoors; the works or any part of the works does not and will not receive any discharge of process water, cooling water, wash water or sanitary sewageWhen criteria specified in O. Reg 137/25 are methigh
#R003operationaloperationalmandatoryCompliance with ECA ConditionswastewaterYou must comply with all the conditions listed in any ECA issued to you by the ministry.When an ECA has been issuedhigh
#R004operationaloperationalmandatorySewage Works Operator CertificationwastewaterAll applicable facilities must be classified in accordance with the regulation and comply with operator certification requirements.Facilities regulated under O. Reg 129/04high
#R005operationaltreatmentmandatoryHauled Sewage Disposal ResponsibilitywastewaterIt is your responsibility to ensure all hauled sewage removed from your sewage works is: transported by a carrier with an approved waste management system; deposited at an approved waste disposal site or dedicated septage treatment works, for example, composting, alkaline stabilization, dewatering trenchesWhen sewage works generates hauled sewage (septage)high
#R006reportingreportingmandatorySpill Reporting DutywastewaterPart X of the EPA requires spills to be reported forthwith by the person having control of the pollutant that is spilled and any person who causes or permits a spill of a pollutant.Upon occurrence of a spill as defined in Part X EPAhigh
#R007corrective_actionoperationalmandatorySpill Cleanup and RestorationwastewaterPart X also requires the owner of the pollutant spilled, and the person who had control of the pollutant spilled to promptly clean up and restore the environment if the spill causes or is likely to cause an adverse effect.When a spill causes or is likely to cause an adverse effecthigh
#R008administrativeoperationalmandatorySpill Prevention and Contingency Planningwastewaterunder section 91.1 of the EPA, a regulated person shall develop and implement plans to prevent or reduce risk of spills of pollutants, and to prevent, eliminate or ameliorate any adverse effects that result or may result from spills of pollutants.For regulated persons defined in EPAhigh
#R009administrativereportingmandatoryFinancial Assurance Estimate RequirementwastewaterWhere applicable, the ECA application must include an estimate of the required amount of financial assurance.Applicable facilities as determined by ministry discretion or poor compliance historyhigh
#R010administrativeoperationalmandatoryEASR Non-Transferability and Re-RegistrationotherIf there is a storm water management works that is registered in the EASR, that registration cannot be transferred, and you are responsible for self-registering the works under your my Ontario account.Upon acquisition of a facility with an existing EASR registrationhigh
#R011designoperationalmandatoryLEP Requirement for EASR ModificationsotherIf you have registered your storm water management works in EASR, you must retain a LEP to update your storm water management works report or prepare an addendum and upload it into the registry before you make any changes.When planning to alter, extend or replace EASR-registered storm water management workshigh
#R012operationaltreatmentmandatoryPollution Prevention and Control Plan DevelopmentwastewaterGuideline F-5-5 requires each operating authority with a combined sewer system to develop a pollution prevention and control plan to address the impact of combined sewer overflows.Operating authorities with combined sewer systemshigh
#R013reportingreportingmandatoryInspection Report Action VerificationwastewaterThese required actions normally have a completion date by which you must report and verify to the ministry that the identified required work or actions have been completed for your sewage works.When a ministry inspection report identifies required actionshigh
#R014administrativeoperationalmandatorySewage Infrastructure Ownership DeterminationwastewaterIf you do not know where your sewage goes, it is your responsibility to determine whether you are the owner of infrastructure designed to collect, transmit, store, treat or dispose of sewage and obtain any necessary environmental permissions.When the owner is uncertain of sewage discharge points or infrastructure ownershiphigh
#R015administrativeoperationalmandatoryLiability for Acquired Sewage WorkswastewaterWhen you acquire a sewage works, you become responsible for all obligations associated with the sewage works at the time of purchase.Upon acquisition of a facility with existing sewage workshigh
#R016corrective_actionoperationalmandatoryEvaluation of Unauthorized AlterationswastewaterIf the sewage works has (or you suspect it has) been extended or altered without the applicable environmental permission having been obtained, it is the owner’s responsibility to have the sewage works evaluated and to apply for any necessary ECA or self-register in the EASR including amendments.When unauthorized extensions or alterations are identified or suspectedhigh
#R017administrativeoperationalmandatorySpill Prevention Plan Content RequirementswastewaterThe plan must include: steps to notify the ministry, other public authorities and members of the public who may be affected by the spill; measures to ensure that appropriate equipment, material and personnel are available to respond to a spill.Mandatory components for plans developed under section 91.1 of the EPAhigh
#R018administrativeoperationalmandatoryBuilding Code Act Permit Requirementwastewatersewage systems or plumbing, as defined in the Ontario Regulation 332/12: Building Code under the Building Code Act, require a permit under Section 10.1 of the act instead of an ECAFor sewage systems or plumbing as defined in O. Reg 332/12 (typically < 10,000 L/d)high
#R019administrativeoperationalmandatoryApplication Fee SubmissionwastewaterApplication costs will vary considerably depending on complexity and must be provided with the application when it is submitted for review.When submitting an Environmental Compliance Approval (ECA) applicationhigh
#R020operationaloperationalmandatoryConstruction Dewatering Sewage Works OperationotherIt [O. Reg 63/16] does not require applicable sewage works be registered but does require that they be operated in accordance with prescribed requirements.For sewage works used solely for dewatering work areas within a construction sitehigh
#R021operationaloperationalrecommendedMaintenance Manual Review and DocumentationwastewaterThese manuals should be reviewed regularly and include details on when the maintenance was performed; and documentation such as a checklist, detailing who services the equipment, what services were performed and when they were performed.Best practice for sewage works maintenance programshigh
#R022operationaloperationalmandatoryEASR Regulatory CompliancewastewaterYou must comply with the relevant regulation for the EASR activity that you are self-registering.For persons engaging in activities registered on the EASRhigh
#R023administrativeoperationalrecommendedPre-submission ConsultationwastewaterIt is strongly recommended that you consult the ministry before submitting your approval application to confirm supporting information requirements and site-specific considerations.Prior to submitting an ECA applicationhigh
#R024administrativeoperationalrecommendedEarly Engagement of Consulting ServiceswastewaterObtain these services early in the design and decision-making process so you and your consultant can discuss technical details such as the proposed scope and extent of the supporting information requirements with the ministry during pre-submission consultation, if required.During the design phase of sewage works projectshigh
#R025monitoringoperationalrecommendedHauled Sewage Documentation (Best Practice)wastewaterThe ECA number for all carriers and receiving sites should be recorded in your operation and maintenance logs as a best management practice.For facilities generating hauled sewage (septage)high
#R026designoperationalrecommendedLEP Retention for Sewage Quality/Quantity ChangeswastewaterIf there has been a change in the quality or quantity of sewage since the ECA or EASR registration was granted, the ministry recommends you retain the services of a LEP with relevant experience to discuss the nature of the changes and ensure you are compliant with the appropriate ECA or EASR registration.When changes in raw or treated sewage characteristics occur post-approvalhigh

P Quantitative Requirements (0)

No quantitative requirements.

D Definitions (0)

No definitions.