Document ID ca-on-or2ls-2011-10-31 Title O. Reg. 232/98: LANDFILLING SITES URL https://www.ontario.ca/laws/regulation/980232 Jurisdiction /ca/on Subdomain(s) none Language Status completed Analyzed at 2026-05-12 04:05:54.572851+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (50)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeoperationalmandatoryLandfilling Site OwnershipotherThe holder of an environmental compliance approval to which a landfilling site is subject must own the entire site in fee simple, unless the site is on Crown land.Unless the site is on Crown land.high
#Q002administrativeoperationalmandatoryContaminant Attenuation Zone Property RightsotherIf a contaminant attenuation zone is necessary for proper operation of a landfilling site, the holder of an environmental compliance approval to which the landfilling site is subject must own property rights respecting the contaminant attenuation zoneIf a contaminant attenuation zone is necessary for proper operation, unless on Crown land with written agreement or on a public road with written agreement from road authority.high
#Q003administrativeoperationalmandatoryDuration of Property Rights OwnershipotherThe holder of the environmental compliance approval must continue to own the property rights for all of the contaminating life span of the site.high
#Q004reportingreportingmandatoryChange of Identity or Ownership NotificationotherThe holder of an environmental compliance approval or the applicant for an environmental compliance approval to which a landfilling site is or will be subject shall notify the Director in writing within 30 days after any change in his, her or its identity or status or any change in ownership of the site or ownership of property rights in the contaminant attenuation zone.Within 30 days after any change in identity, status, or ownership.high
#Q005reportingreportingmandatoryDesign Specifications Report RequirementotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q006designoperationalmandatoryBuffer Area RequirementotherThe owner and the operator of a landfilling site shall ensure that the waste fill area is completely surrounded by buffer area in accordance with this section.high
#Q007reportingreportingmandatoryHydrogeological Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the geologic and hydrogeologic conditions of the site and ground water protection for the site has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q008reportingreportingmandatorySurface Water Assessment ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report on the surface water conditions of the site and surface water protection for the site has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q009reportingreportingmandatoryGround Water Protection Design Reportdrinking water, otherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report describing the design for the ground water protection features of the site has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q010reportingreportingmandatoryLeachate Disposal ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the management and disposal of any leachate collected at the site has been prepared.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q011reportingreportingmandatoryLeachate Contingency Plans ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for a leachate contingency plan for the site has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q012reportingreportingmandatorySurface Water Control ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report containing plans, specifications and descriptions for the control, treatment and discharge of surface water at the site during construction, site operation and following closure has been prepared in accordance with this section.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q013reportingreportingmandatorySubsurface Migration of Landfill Gas AssessmentotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared in accordance with this section that contains the following: 1. An assessment of the potential for the migration of landfill gas in the subsurface. 2. Plans, specifications and descriptions for the monitoring, control, collection, use or discharge of landfill gas at the site if, on the basis of the assessment, any of these actions are necessary.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q014reportingreportingmandatoryAtmospheric Emissions of Landfill Gas ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a written report has been prepared respecting the design, operation, maintenance and monitoring of facilities for the collection, and for the burning or use, of landfill gas generated by the site during site operation and following site closure.Applies only if establishing a new site > 1.5 million cubic metres or increasing an existing site to > 1.5 million cubic metres, unless exemptions under 15(3), 15(3.1), or 15(4) apply.high
#Q015reportingreportingmandatoryOperation and Maintenance Procedures ReportotherA person shall not establish a new landfilling site or increase the total waste disposal volume of an existing landfilling site unless a writ ten report has been prepared containing plans, specifications and descriptions of the operation, maintenance, monitoring, closure and post-closure care of the site, including matters related to record keeping, reporting and financial assurance.Applies when establishing a new landfilling site or increasing the total waste disposal volume of an existing landfilling site.high
#Q016administrativeoperationalmandatoryFinancial Assurance for Contingency PlansotherThe owner and the operator of a landfilling site shall ensure that financial assurance is provided for the contingency plans for the site, including the construction, operation, maintenance and replacement of works required by the contingency plans.Does not apply to a landfilling site owned by a municipality or the Crown, or specific forest products company sites.high
#Q017administrativeoperationalmandatoryForm of Financial AssuranceotherThe financial assurance shall be provided in the form of a cash deposit paid to the Director or in such other form, such as a bond, a letter of credit or negotiable securities, as is acceptable to the Director.high
#Q018administrativeoperationalmandatoryFinancial Assurance ReplacementotherThe owner and the operator of a landfilling site shall ensure that any amount of financial assurance used by the Director under subsection (6) is replaced within six months after it is used unless the Director directs otherwise.high
#Q019administrativeoperationalmandatoryFinancial Assurance for Closure and Post-Closure CareotherThe owner and the operator of a landfilling site shall ensure that financial assurance for the closure of the site and the post-closure care of the site is provided in accordance with this section.Does not apply in respect of a landfilling site owned by a municipality or the Crown.high
#Q020reportingreportingmandatorySite Preparation Report DocumentationotherA person shall not place any waste in a newly constructed base or base side slope area of a landfilling site until a written report has been prepared documenting all construction, quality assurance and quality control activities and confirming that the site conditions and details of the construction of the new area are in accordance with the design plans and specifications of the landfilling site.Prior to placing any waste in a newly constructed base or base side slope area.high
#Q021reportingreportingmandatoryRecord Keeping RequirementotherThe owner and the operator of a landfilling site shall ensure that daily records of site operations are made during the operation of the site and that the records are retained for at least two years after they are made.high
#Q022reportingreportingmandatoryAnnual Operations Report RequirementotherThe owner and the operator of a landfilling site shall ensure that, (a) within three months after each anniversary of the date on which waste was first accepted at the site, an annual report is prepared respecting the operation of the landfilling site, including a summary of results from monitoring programs; and (b) all of the reports are retained until at least two years after the site is closed.high
#Q023prohibitionoperationalmandatoryProhibition of Burning Municipal WasteotherThe owner and the operator of a landfilling site shall ensure that no municipal waste is burned at the site as part of the landfilling operation.Does not apply to clean wood and brush that is burned during daylight hours under controlled and supervised conditions in a segregated portion of the site.high
#Q024prohibitionoperationalmandatoryProhibition of ScavengingotherThe owner and the operator of a landfilling site shall ensure that there is no scavenging at the site.high
#Q025monitoringoperationalmandatorySurface Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring the quality and quantity of the surface water features on the site and of the surface water features that receive a direct discharge from the site.high
#Q026monitoringoperationalmandatoryGround Water Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring ground water quality and quantity.high
#Q027monitoringoperationalmandatoryLeachate Monitoring ProgramotherThe owner and the operator of a landfilling site shall ensure that a program is carried out for monitoring leachate quality and quantity.high
#Q028corrective_actionoperationalmandatoryLeachate Contingency InvestigationotherThe owner and the operator of the landfilling site shall ensure that investigative activities are carried out with respect to the cause of an increase in contaminant concentrations if any of the trigger criteria described under paragraph 5 of subsection 12 (2), as they may have been modified under paragraph 2 of subsection (3) of this section, is exceeded for any single monitoring event.If trigger criteria are exceeded for any single monitoring event.high
#Q029corrective_actionoperationalmandatoryImplementation of Contingency MeasuresotherIf the monitoring results, investigative activities and implementation criteria indicate the need to implement contingency measures, the owner and the operator of a landfilling site shall ensure that the following steps are taken: 1. The Director must be notified of the need to implement contingency measures. 2. Detailed plans, specifications and descriptions for the design, operation and maintenance of the contingency measures must be prepared. 3. The contingency measures must be implemented.If monitoring results, investigative activities and implementation criteria indicate the need.high
#Q030operationaloperationalmandatoryDaily Cover ApplicationotherThe owner and the operator of a landfilling site shall ensure that all waste accepted for disposal at the site is disposed of in the waste fill zone and is covered at the end of each working day by daily cover in accordance with this section.Does not apply to certain landfilling sites associated with forest products operations.high
#Q031operationaloperationalmandatoryFinal Cover Materials and ApplicationotherThe owner and the operator of a landfilling site shall ensure that the following materials are applied to the waste fill zone as final cover, from bottom to top: 1. A minimum of 0.6 metres of cover material. 2. A minimum of 0.15 metres of topsoil or other material approved by the Director as able to sustain plant growth. 3. A vegetative cover consisting of vegetation that is suited to local conditions and that is capable with minimal care of providing vigorous, plentiful cover not later than its third growing season.high
#Q032designoperationalmandatoryFinal Cover Design CapabilitiesotherThe owner and the operator of a landfilling site shall ensure that the final cover is designed so that, (a) the infiltration rate through the final cover is in accordance with the design for the site respecting ground water protection prepared under section 10; (b) any existing or anticipated facilities for the control, collection, use or discharge of landfill gas are accommodated; and (c) the requirements for the end use of the site, as described in the site design report prepared under section 6 and the closure report prepared under section 31, are met.high
#Q033reportingreportingmandatorySite Closure Report RequirementsotherThe owner and the operator of a landfilling site shall ensure that a written report on activities for the closure of the site, activities for the post-closure care of the site and the proposed end use of the site is prepared not later than the date 90 per cent of the total waste disposal volume is reached or two years before the anticipated date of closure, whichever comes first.Not later than the date 90 per cent of the total waste disposal volume is reached or two years before the anticipated date of closure, whichever comes first.high
#Q034reportingreportingmandatoryAnnual Post-Closure Care ReportotherThe owner and the operator of a landfilling site shall ensure that, within three months after each anniversary of the date on which waste was last placed on the site, an annual report is prepared respecting the post-closure care of the landfilling site, including a summary of results from monitoring programs.high
#Q035monitoringoperationalmandatoryPrimary Leachate Collection Pipes InspectionotherLeachate collection pipes must be inspected at least annually for the first five years after placement of waste overtop of each pipe and then as often as future inspections indicate to be necessary.For primary leachate collection systems assuming specified service lives.high
#Q036operationaloperationalmandatoryPrimary Leachate Collection Pipes CleaningotherLeachate collection pipes must be cleaned whenever an inspection indicates that cleaning is necessary.high
#Q037operationaloperationalmandatoryPrimary Leachate Removal from SystemotherLeachate must be removed from the collection system in order to avoid obstructions to leachate flows within the system.high
#Q038prohibitionoperationalmandatoryProhibition of Sludge Deposit Promoting Biological CloggingotherSludge must not be deposited in the waste fill zone in a manner that would allow sludge to move into the leachate collection system and promote biological clogging.high
#Q039monitoringoperationalmandatorySecondary Leachate Collection Pipes InspectionotherLeachate collection pipes must be inspected at least annually for the first five years after the initial production of leachate from the secondary leachate collection system and then as often as future inspections indicate to be necessary.For secondary leachate collection systems assuming specified service lives.high
#Q040designoperationalmandatoryGeomembrane Liners Installation ContactotherThe geomembrane must be installed in direct and uniform contact with a suitable foundation or clayey liner.To assume specified service life.high
#Q041designoperationalmandatoryGeomembrane Liners Protection from PuncturingotherThe geomembrane must be protected against puncturing and load-induced damage at all times, including during installation.To assume specified service life.high
#Q042operationaloperationalmandatoryGeomembrane Liners Installation CareotherDuring installation, care must be taken to, i. remove wrinkles in the geomembrane, ii. minimize stress concentration, iii. ensure high quality seams, iv. minimize differential settlement, v. minimize exposure to ultraviolet light, vi. prevent damage due to sliding, vii. prevent damage due to installation in cold conditions, and viii. prevent damage due to rodents.To assume specified service life.high
#Q043operationaloperationalmandatoryCompacted Clayey Liners Installation CareotherDuring installation, care must be taken to, i. control soil properties and water content, ii. ensure the breakup of clods, iii. control lift thickness and compaction, iv. remove stones larger than 100 millimetres, v. prevent desiccation of the compacted clayey liner, vi. prevent damage to the compacted clayey liner due to freezing, vii. prevent damage to the compacted clayey liner from vehicular traffic, viii. prevent damage to the compacted clayey liner due to rodents, and ix. prevent damage to the compacted clayey liner due to differential settlement.To assume unlimited service life.high
#Q044reportingreportingmandatoryCompacted Clayey Liners Geotechnical ReportotherThe report of a suitably qualified geotechnical engineer must confirm that there is no evident cracking in the constructed liner or significant occurrence of clods, stones, branches or other material that could shorten the service life of the constructed liner or significantly increase the hydraulic conductivity.To assume unlimited service life.high
#Q045administrativetreatmentmandatoryPhosphorus Load Reduction Targetdrinking water, aquatic life, recreational water, otherA phosphorus load reduction target of 40% reduction from 2008 levels in phosphorus loadings to the western and central basins for Lake Erie was established and adopted under: the Canada-United States Great Lakes Water Quality Agreement (GLWQA); the Canada-Ontario Lake Erie action plan; Ontario’s Great Lakes Protection Act, 2015; and the Ohio, Michigan and Ontario Western Basin of Lake Erie Collaborative Agreement.Target applies to the western and central basins relative to 2008 levels.high
#Q046reportingreportingmandatoryImplementation Team Progress TrackingotherThe implementation team is responsible for tracking, assessing and evaluating progress and providing broader engagement opportunities.high
#Q047corrective_actionhealthmandatoryBlue-Green Algal Bloom Response Protocoldrinking water, recreational waterThe LEAP builds on our leadership and efforts to improve water quality and public health, including a response protocol if a suspected blue-green algal bloom (also known as harmful algal bloom) is reported.Applies if a suspected blue-green algal bloom is reported.high
#Q048treatmenttreatmentmandatoryMunicipal Sewage and Stormwater Loading Reductionswastewater, otherThe specific actions the plan commits to include: limiting loadings from municipal sewage treatment plant discharges and better managing stormwater.Identified as a specific commitment within the Lake Erie Action Plan.high
#Q049operationaltreatmentmandatoryAgricultural Phosphorus Techniquesagricultural waterThe specific actions the plan commits to include: encouraging effective techniques to keep phosphorus on farmlandAs specified in the Canada-Ontario Lake Erie Action Plan commitments.high
#Q050operationaltreatmentmandatoryWetland RestorationotherThe specific actions the plan commits to include: restoring natural wetlandsAs specified in the Canada-Ontario Lake Erie Action Plan commitments.high

P Quantitative Requirements (54)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001designoperationalmandatoryInfiltration rateotherrequirement>= 0.15 metres per yearThe infiltration rate through the final cover of the landfilling site must be greater than or equal to 0.15 metres per year.Single liner design option for a new landfilling sitehigh
#P002designoperationalmandatoryHydraulic conductivityotherrequirement<= 1x10-7 metres per secondThe layer must have a hydraulic conductivity less than or equal to 1 x 10-7 metres per second.Natural or engineered layer of soil at the base of the waste fill zonehigh
#P003designoperationalmandatoryHydraulic conductivityotherrequirement<= 1x10-9 metres per seconda clayey liner at least 0.75 metres thick... has a hydraulic conductivity of not more than 1 x 10-9 metres per secondPrimary linerhigh
#P004designoperationalmandatoryOrganic carbon contentotherrequirement>= 0.1 per centhas an organic carbon content of at least 0.1 per centPrimary clayey linerhigh
#P005chemicalhealthmandatoryMethane gasotherrequirement< 2.5 per cent by volumeThe concentration of methane gas below the surface of the land at the boundary of the site must be less than 2.5 per cent by volume.Below the surface of the land at the boundary of the sitehigh
#P006chemicalhealthmandatoryMethane gasotherrequirement< 1.0 per cent by volumeThe concentration of methane gas must be less than 1.0 per cent by volume in any on-site building or enclosed structureOn-site building or enclosed structure accessible to any person or contains electrical equipment or a potential source of ignitionhigh
#P007chemicalhealthmandatoryMethane gasotherrequirement< 0.05 per cent by volumeThe concentration of methane gas from the site must be less than 0.05 per cent by volume in any off-site building or enclosed structureOff-site building or enclosed structure accessible to any person or contains electrical equipment or a potential source of ignitionhigh
#P008chemicalhealthmandatoryBenzenedrinking watertreatment_goal0.005 mg/LHealth Related Drinking Water Objective for BenzeneEvaluated as part of the ground water protection design criteriahigh
#P009chemicalhealthmandatoryCadmiumdrinking watertreatment_goal0.005 mg/LHealth Related Drinking Water Objective for CadmiumEvaluated as part of the ground water protection design criteriahigh
#P010chemicalaestheticmandatoryChloridedrinking waterAO250 mg/LAesthetic Drinking Water Objective for ChlorideEvaluated as part of the ground water protection design criteriahigh
#P011chemicalhealthmandatoryLeaddrinking watertreatment_goal0.01 mg/LHealth Related Drinking Water Objective for LeadEvaluated as part of the ground water protection design criteriahigh
#P012chemicalaestheticmandatory1,4 Di-chlorobenzenedrinking waterAO0.001 mg/LAesthetic Drinking Water Objective for 1,4 Di-chlorobenzeneEvaluated as part of the ground water protection design criteriahigh
#P013chemicalhealthmandatoryDichloro-methanedrinking watertreatment_goal0.05 mg/LHealth Related Drinking Water Objective for Dichloro-methaneEvaluated as part of the ground water protection design criteriahigh
#P014chemicalaestheticmandatoryToluenedrinking waterAO0.024 mg/LAesthetic Drinking Water Objective for TolueneEvaluated as part of the ground water protection design criteriahigh
#P015chemicalhealthmandatoryVinyl Chloridedrinking watertreatment_goal0.002 mg/LHealth Related Drinking Water Objective for Vinyl ChlorideEvaluated as part of the ground water protection design criteriahigh
#P016designoperationalmandatoryBuffer area widthotherrequirement>= 100 metresThe buffer area shall be at least 100 metres wide at every point.Standard width requirement for all landfilling sites.high
#P017designoperationalmandatoryMinimum buffer area widthotherrequirement>= 30 metresThe buffer area is at least 30 metres wide at every point and a written report confirms suitability.Exception to the 100m rule when specific performance criteria are met.high
#P018designoperationalmandatoryFinal cover thicknessotherrequirement>= 0.6 metresA minimum of 0.6 metres of cover material applied to the waste fill zone as final cover.Applicable at time of site closure.high
#P019designoperationalmandatoryTopsoil thicknessotherrequirement>= 0.15 metresA minimum of 0.15 metres of topsoil or other material approved by the Director.Applied over the 0.6m cover material.high
#P020designoperationalmandatoryMaximum final slopeotherrequirement<= 1:4 ratioFinal slopes above grade within the waste fill zone at the time of site closure do not exceed one unit vertical to four units horizontal.Unless alternative design report is prepared.high
#P021designoperationalmandatoryMinimum final slopeotherrequirement>= 1:20 ratioFinal slopes above grade within the waste fill zone at the time of site closure are not less than one unit vertical to 20 units horizontal.Unless alternative design report is prepared.high
#P022designoperationalmandatorySecondary geomembrane thicknessotherrequirement>= 2.0 millimetresRequirement that the geomembrane have a thickness of at least 2.0 millimetres for a secondary liner.350-year service life assumption.high
#P023operationaloperationalmandatoryMinimum number of municipal board membersotherrequirement3 membersComposition of each board of healthExcept for specific regional or single-tier municipalities listed in section 49(9)high
#P024operationaloperationalmandatoryMaximum number of municipal board membersotherrequirement13 membersComposition of each board of healthExcept for specific regional or single-tier municipalities listed in section 49(9)high
#P025operationalreportingmandatoryNotice period for requiring a hearingotherrequirement15 daysPeriod within which a person may require a hearing by the Board after being served an orderApplies after copy of the order is servedhigh
#P026operationalhealthmandatoryMaximum duration of detention for virulent diseaseotherrequirement<= 6 monthsAuthority to detain a person in a hospital or facility for treatment of a virulent diseaseDetention under a court orderhigh
#P027operationaloperationalmandatoryWarrant expiry periodotherrequirement<= 15 daysExpiration date for a warrant issued by a justice of the peace for entry and inspectionApplies to warrants issued under section 43high
#P028operationaloperationalmandatoryPayment of expenses deadline for municipalitiesdrinking waterrequirement60 daysPeriod after which unpaid health board costs are transmitted to the municipal clerk for collection via tax rollApplies if costs are not paid within sixty days after a demandhigh
#P029operationaloperationalmandatoryCMOH Term of Officeotherrequirement5 yearsThe Chief Medical Officer of Health holds office for a specific term.Initial and reappointment termshigh
#P030operationalreportingmandatoryImmunization Reporting Lead Time (CMOH)otherrequirement30 daysThe Chief Medical Officer of Health shall deliver a copy of the annual report to the Minister before the Speaker.Prior to delivering to the Speaker of the Legislative Assemblyhigh
#P031microbiologicalhealthguidelineVaccine Reaction Reporting Window (Anaphylaxis)otherrequirement48 hoursTimeframe for persistent crying, screaming, anaphylaxis, or shock to be considered a reportable event.After the administration of an immunizing agenthigh
#P032microbiologicalhealthguidelineVaccine Reaction Reporting Window (Convulsions)otherrequirement3 daysTimeframe for shock-like collapse, high fever, or convulsions to be considered a reportable event.After the administration of an immunizing agenthigh
#P033microbiologicalhealthguidelineVaccine Reaction Reporting Window (Encephalitis)otherrequirement15 daysTimeframe for generalized urticaria, seizure disorder, or encephalitis to be considered a reportable event.After the administration of an immunizing agenthigh
#P034microbiologicalhealthguidelineVaccine Reaction Reporting Window (Arthritis)otherrequirement42 daysTimeframe for arthritis to be considered a reportable event.After the administration of an immunizing agenthigh
#P035operationaloperationalmandatoryStatutory Hearing Scheduling Deadlineotherrequirement15 daysThe Board shall hold a hearing within this timeframe after receiving a notice requiring the hearing.Upon receipt of written noticehigh
#P036operationaloperationalmandatoryDefault Compliance Period for Directionsotherrequirement30 daysA board of health must comply with a direction within this timeframe if no period is specified in the direction.When no specific timeframe is provided in the Minister's directionhigh
#P037operationaloperationalmandatoryExpense Payment Window (Municipal)otherrequirement7 daysThe treasurer shall pay the amount set out in the certificate to the Minister of Finance within this timeframe.After being given the certificate of due expenseshigh
#P038operationalreportingmandatoryDeemed Service Period (Mailing)otherrequirement7 daysA notice or order sent by ordinary mail is deemed to be served after this timeframe.Service by ordinary mailhigh
#P039operationalreportingmandatoryMaximum Fine (Individual)otherrequirement5000 CAD per dayLiability for persons guilty of an offence under the Act.Per day or part of a day the offence continueshigh
#P040operationalreportingmandatoryMaximum Fine (Corporation)otherrequirement25000 CAD per dayLiability for a board of health, municipality, or other corporation convicted of an offence.Per day or part of a day the offence continueshigh
#P041operationalreportingmandatoryAdverse Event Practitioner Reporting Deadlineotherrequirement<= 7 dayswithin seven days after recognizing the reportable event, report thereon to the medical officer of healthPhysician or practitioner recognizing a reportable event related to immunizationhigh
#P042operationalreportingmandatoryAdverse Event MOH Reporting Deadlineotherrequirement<= 7 daysreport to the Ministry and the Ontario Agency for Health Protection and Promotion within seven days after receiving a reportMedical officer of health receiving a report concerning a reportable eventhigh
#P043operationaloperationalmandatoryMOH Dismissal Vote Requirementotherrequirement>= 2/3 ratiothe decision is carried by the vote of two-thirds of the members of the boardBoard of health decision to dismiss a medical officer of healthhigh
#P044operationaloperationalmandatoryChief Medical Officer of Health Standingotherrequirement>= 5 yearsunless he or she is a physician of at least five years standingEligibility for appointment as Chief Medical Officer of Healthhigh
#P045operationaloperationalmandatoryBoard Appointment Term Lengthotherrequirement1 to 3 yearsappointed by the Lieutenant Governor in Council may be appointed for a term of one, two or three yearsTerm of office for members appointed by the Lieutenant Governor in Councilhigh
#P046operationaloperationalmandatoryPremises Possession Order Maximum Durationotherrequirement<= 12 monthsexpiry date for the order that is not more than 12 months after the day of its makingOrder for possession of premises for public health purposeshigh
#P047operationaloperationalmandatoryPublic Health Directive Maximum Durationotherrequirement<= 6 monthsin force for the period set out in the directive, which shall not exceed six monthsDirectives issued by the Chief Medical Officer of Health to boards and medical officershigh
#P048operationalreportingmandatoryBoard Assessment Hearing Request Deadlineotherrequirement15 dayswithin 15 days after the day the notice of failure to comply is given to the board of healthBoard of health requiring a hearing after receiving a notice of failure to comply with a directionhigh
#P049operationalhealthmandatoryVirulent Disease Detention Extension Maximum Durationotherrequirement<= 6 monthsthe judge by order may extend the period of detention and treatment for not more than six monthsExtension of detention order by the court for a person infected with a virulent diseasehigh
#P050operationalhealthmandatoryAge threshold for parental complianceotherrequirement< 16 yearsAn order by a medical officer of health in respect of a communicable disease directed to a person under sixteen years of age.Parent or person with parental responsibilities must ensure compliance.high
#P051operationaloperationalmandatoryBand member appointment term lengthotherrequirement1 to 3 yearsThe council of the band that has entered into the agreement has the right to appoint a member of the band to the board of health.Term length for board members appointed by a band council.high
#P052operationalreportingmandatoryDeemed service period (Class orders)otherrequirement7 daysService is deemed made on the earlier of seven days after the day the order was given and the day it should reasonably have come to the attention of the members.Applies to notice requirements for class orders under subsections 22 (5.0.2) or (5.0.3).high
#P053operationaloperationalmandatoryBoard Quorum Requirementotherrequirement> 50 per centA majority of the members of a board of health constitutes a quorum of the board.Applicable to all board of health meetings.high
#P054operationaloperationalmandatoryProvincial Board Appointment Limitotherrequirement< total count of municipal members membersThe Lieutenant Governor in Council may appoint one or more persons as members of a board of health, but the number of members so appointed shall be less than the number of municipal members of the board of health.Applies to appointments made by the Lieutenant Governor in Council.high

D Definitions (37)

Req ID Category Name Context Confidence
#D001EASREnvironmental Activity and Sector Registryhigh
#D002EPAEnvironmental Protection Acthigh
#D003ECAEnvironmental Compliance Approvalhigh
#D004PTTWPermit to Take Waterhigh
#D005IItwohigh
#D006ECAsEnvironmental Compliance Approvalhigh
#D007Teltelephonehigh
#D008Environmental Activity and Sector Registry (EASR)an online registry that allows businesses to register certain activities that are well managed by meeting a standard set of requirements or established outcomeshigh
#D009EASR registrationa type of environmental permission that gives businesses permission to operate if they follow standard activity requirementshigh
#D010electronic confirmation of registrationyour proof of registration and is required before starting or continuing your activityhigh
#D011chain of custody formused by clients of the laboratory to request sample analysishigh
#D012sample drop-off depotany location under the direct care and control of the laboratory that is offsite from the laboratory where drinking water samples are deposited, collected, and stored for shipping to the laboratoryhigh
#D013immediatewithout delay from any other action and in accordance with an approved procedurehigh
#D014no data overgrown (NDOG)observation of “over-crowding/confluent/non-identifiable microbial growth” is detected on a plate relating to analyses under the SDWAhigh
#D015SDWASafe Drinking Water Act, 2002high
#D016HPPAHealth Protection and Promotion Acthigh
#D017DWSDrinking Water Systemhigh
#D018SACSpills Action Centrehigh
#D019PHUpublic health unithigh
#D020DWISDrinking Water Information Systemhigh
#D021LRMALaboratory Results Management Applicationhigh
#D022AWQIadverse water quality incidentshigh
#D023RDLreporting detection limithigh
#D024MDLmethod detection limithigh
#D025MACMaximum Allowable Concentrationhigh
#D026LSNLaboratory Services Notificationhigh
#D027O. Reg.Ontario Regulationhigh
#D028Ionehigh
#D029IVfourhigh
#D030OITOperator-in-Traininghigh
#D031IIIthreehigh
#D032WQAswater quality analystshigh
#D033USUnited Stateshigh
#D034OWWCOOntario Water Wastewater Certification Officehigh
#D035IDIdentificationhigh
#D036trained personperson who can operate drinking water systems serving designated facilities (for example, schools or daycares) within small, non-municipal, non-residential; small, municipal, non-residential; or non-municipal seasonal residential systemshigh
#D037supervised personperson who can test chlorine residual and turbidity in certain drinking water systems under the supervision of a certified drinking water operatorhigh