Parameter Viewer

Document ID ca-on-toronto-inwaco-2022 Title Industrial Waste Control URL https://www.toronto.ca/services-payments/water-environment/water-sewer-related-permits-and-bylaws/sewers-by-law/washing-cars-outdoors-surfaces/ Jurisdiction /ca/on/toronto Subdomain(s) none Language Status completed Analyzed at 2026-05-12 01:27:15.422582+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (16)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001prohibitionoperationalmandatoryProhibition of Discharge into Catch BasinswastewaterNo substances other than rain and melted snow can be poured or allowed to flow into an outdoor catch basin (square grates on the street).This includes: oils, grease, antifreeze and other automotive fluids; soaps and other cleaning products; water leaking from a waste/oil bin; any water used for cleaning; solid materials.high
#Q002treatmenttreatmentmandatoryCommercial Car Wash Facility PracticeswastewaterThese facilities are required to follow a set of practices determined by the City, including treating wastewater and discharging it into the sanitary sewer system where it will receive further treatment.Applies to commercial car wash facilities (automatic or coin).high
#Q003prohibitionoperationalrecommendedProhibition of Discharges to Sewerswastewaternever pour anything down manholes or catch basinshigh
#Q004corrective_actionoperationalrecommendedVehicle Spill Cleanupwastewaterclean up vehicle spills or leaks to prevent toxins from entering the sewerhigh
#Q005prohibitionoperationalmandatoryOutdoor Washing Wastewater ProhibitionwastewaterWastewater from outdoor washing must not reach any catch basins as soaps, cleaning products and contaminants dislodged or dissolved from the surface being washed will violate storm sewer By-law limits.This includes water used for graffiti removal, building restoration, as well as vehicle, sidewalk, alley or other outdoor washing.high
#Q006administrativeoperationalmandatoryOff-site Wastewater Hauling RequirementwastewaterHauling off-site must be performed by a Ministry of the Environment, Conservation and Parks approved hauler.Applies when disposing of wastewater by hauling it off-site instead of letting it evaporate, re-routing it away from a catch basin, or disposing of it in an indoor drain.high
#Q007prohibitionoperationalrecommendedOutdoor Garbage Area Cleaning ProhibitionwastewaterOutside garbage areas should not be cleaned using running water.high
#Q008administrativeoperationalmandatoryMobile Wash Business Operations ResponsibilitywastewaterMake sure to hire a company that follows the Sewers By-law as both the person hiring and the mobile wash business operation/company are responsible for wastewater discharging from the property.Applies when hiring mobile wash businesses including companies that wash cars and buildings, landscapers washing windows, duct cleaning companies washing roof exhausts.high
#Q009reportingreportingmandatoryBypass Initiation NotificationwastewaterThe City notifies the MECP’s Spills Action Centre when a bypass starts and ends using the MECP’s Bypass & Overflow Reporting portal or by telephone.Applies upon the start and end of a wastewater treatment plant bypass event.high
#Q010reportingreportingmandatoryDetailed Bypass Data EntrywastewaterWithin 10 business days, the City adds more detailed information to the portal such as duration and volume.Following a bypass event reported to the MECP portal.high
#Q011reportingreportingmandatoryPeriodic Bypass Summary ReportswastewaterThe City also submits a monthly (Humber) or quarterly (Ashbridges Bay) summary of bypass events to the MECP, and posts these bypass events monthly on the City’s website.Frequency varies by plant (monthly for Humber, quarterly for Ashbridges Bay).high
#Q012reportingreportingmandatoryAnnual Bypass Reporting SubmissionwastewaterBypass information is included in the plant’s annual report, submitted to the MECP and posted online by March 31 of the following year.high
#Q013treatmenttreatmentmandatoryBypass Wastewater Disinfectionwastewaterall wastewater is disinfected even during a bypass.Applies during bypass events to ensure treated water meets federal and provincial regulations.high
#Q014administrativehealthguidancePost-Rainfall Water Contact Advisoryrecreational waterThe City of Toronto advises people to stay out of the water during and for 48 hours after rainfall.Triggered by rainfall events due to potential high levels of pollutants.high
#Q015treatmenttreatmentmandatoryComprehensive Bypass Treatment RequirementswastewaterThe bypassed wastewater still goes through screening, grit removal, primary treatment, phosphorous removal and full disinfection to ensure the treated water always meets strict federal and provincial regulations.Applies during bypass events where wastewater is diverted around the secondary treatment process.high
#Q016reportingreportingmandatoryFederal Testing and Reporting CompliancewastewaterThe federal government also has testing and reporting requirements.high

P Quantitative Requirements (10)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001operationaloperationalmandatoryNon-compliance Finewastewaterrequirement<= 100,000 $/dayFailure to comply with the By-lawPer day of non-compliancehigh
#R002chemicaltreatmentmandatorySurcharge Rate: Biochemical Oxygen Demand (BOD)wastewaterrequirement0.64 $/kgTreatable parameters unit cost for Industrial Waste Surcharge AgreementPer kilogram of parameter being treatedhigh
#R003chemicaltreatmentmandatorySurcharge Rate: Phenolics (4AAP)wastewaterrequirement0.64 $/kgTreatable parameters unit cost for Industrial Waste Surcharge AgreementPer kilogram of parameter being treatedhigh
#R004physicaltreatmentmandatorySurcharge Rate: Total Suspended Solids (TSS)wastewaterrequirement0.70 $/kgTreatable parameters unit cost for Industrial Waste Surcharge AgreementPer kilogram of parameter being treatedhigh
#R005chemicaltreatmentmandatorySurcharge Rate: Total Kjeldahl Nitrogen (TKN)wastewaterrequirement1.43 $/kgTreatable parameters unit cost for Industrial Waste Surcharge AgreementPer kilogram of parameter being treatedhigh
#R006chemicaltreatmentmandatorySurcharge Rate: Total Phosphorus (TP)wastewaterrequirement2.24 $/kgTreatable parameters unit cost for Industrial Waste Surcharge AgreementPer kilogram of parameter being treatedhigh
#R007operationaloperationalmandatorySurcharge Fee Annual Adjustment Factorwastewaterrequirement14 %Annual adjustment for surcharge fee calculation formula phased in over a six-year periodhigh
#R008operationaloperationalmandatoryCommercial General Liability Insurance Limitwastewaterrequirement>= 5,000,000 $Application requirement for Hauled Sewage Discharge AgreementPer occurrencehigh
#R009operationaloperationalmandatoryAutomobile Policy Third Party Liability Limitwastewaterrequirement>= 5,000,000 $Application requirement for Hauled Sewage Discharge Agreement for licensed vehiclesInclusive of limits, per occurrencehigh
#R010operationaltreatmentmandatorySeptic Waste Disposal Feewastewaterrequirement27.86 $/m³Fee for disposal of septic waste at Highland Creek Wastewater Treatment Planthigh

D Definitions (8)

Req ID Category Name Context Confidence
#D001ICIindustrial, commercial, and institutionalhigh
#D002sewer surchargeportion of water rate charged for sewer use dischargemedium
#D003bypassdiversion around the biological process (secondary treatment process) to protect the planthigh
#D004combined sewersone pipe that carries both sewage and rain to a wastewater treatment planthigh
#D005MECPMinistry of the Environment, Conservation and Parkshigh
#D006TSSATechnical Standards and Safety Authorityhigh
#D007ESAElectrical Safety Authorityhigh
#D008secondary treatmentbiological processhigh