Parameter Viewer

Document ID ca-on-toronto-mtdsf-null-3 Title Manufactured Treatment Device Summary Form URL https://www.toronto.ca/wp-content/uploads/2021/10/97db-Foundation-Drainage-Policy-AODA-1Nov21.pdf Jurisdiction /ca/on/toronto Subdomain(s) none Language Status completed Analyzed at 2026-05-12 03:29:33.085043+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (65)

Req ID Category Intent Legal Status Name Subdomain(s) Context Conditions Confidence
#Q001administrativeoperationalmandatoryPolicy Applicabilitywastewater, otherThis policy applies to all development applications under the Planning Act, except for Committee of Adjustment applications, effective January 1, 2022.Applies to development applications under the Planning Act, excluding Committee of Adjustment applications.high
#Q002administrativeoperationalmandatoryTemporary Connection Works and CostswastewaterAll associated works and costs to be undertaken by the development applicant/owner.Applicable when a Temporary Connection from Foundation Drainage infrastructure placed on private property line to City's sewers is required to facilitate the Short-term Discharge of Foundation Drainage.high
#Q003operationaloperationalmandatoryTemporary Connection DisconnectionwastewaterFoundation Drainage infrastructure on private property is to be disconnected from City sewers before and after Short-term Discharge has taken place.Applies to Foundation Drainage infrastructure involved in Short-term Discharge.high
#Q004prohibitionoperationalmandatoryProhibition of Long-term Discharge to Sanitary SewerswastewaterLong-term Discharge of Foundation Drainage to the City's sanitary sewer system will not be permitted.high
#Q005prohibitionoperationalmandatoryProhibition of Confined Aquifer Dischargewastewater, otherFoundation Drainage from the interception and/or extraction of Groundwater from confined aquifers will not be permitted to any of the City's sewer systems.high
#Q006prohibitionoperationalmandatoryProhibition of Groundwater Long-term Discharge to Storm or Combined SewerswastewaterLong-term Discharge of Foundation Drainage that contains any Groundwater will not be permitted to the City's storm or combined sewer system, unless the Foundation Drainage is deemed to contain only Infiltrated Stormwater, and if all the following conditions have been met to the satisfaction of the General Manager of Toronto Water:Applicable where no servicing options exist to the City's storm sewers from the development site.high
#Q007reportingoperationalmandatoryCondition for Acceptable Surface Water DischargewastewaterA Qualified Professional deems Foundation Drainage to be acceptable for surface water discharge, by confirming that: i. The development site is not considered a Brownfield Property for which no Record of Site Condition has been filed, or ii. The development site is a Brownfield property where the filing of a Record of Site Condition confirms appropriate risk management measures have been implemented;One of the conditions to permit Long-term Discharge of Foundation Drainage containing only Infiltrated Stormwater to storm or combined sewers.high
#Q008designoperationalmandatoryStructure Elevation Conditionwastewater, otherA Qualified Professional with a P.Eng. or P.Geo. has deemed that the lowest elevation of any proposed structure will be higher than the Maximum Anticipated Groundwater Level, in accordance with Groundwater monitoring requirements in the City's Foundation Drainage Guidelines.One of the conditions to permit Long-term Discharge of Foundation Drainage containing only Infiltrated Stormwater to storm or combined sewers.high
#Q009administrativeoperationalmandatoryStorm Connection Exemption Application ConditionswastewaterAll requirements for a Storm Connection Exemption Application have been satisfied, including: i. Confirmation from a Qualified Professional with a P.Eng. or P.Geo. licence that On-site Management of Foundation Drainage is not technologically feasible. ii. A Stormwater Management Report, prepared by a Qualified Professional with a P.Eng. license, demonstrates that water management targets of the City's Wet Weather Flow Management Guidelines will be met. iii. A Servicing Report, prepared by a Qualified Professional with a P.Eng. license, confirms that applicable sewer capacity criteria will be met in accordance with the City's Design Criteria for Sewer and Watermains, where discharges are proposed to the combined sewers.One of the conditions to permit Long-term Discharge of Foundation Drainage containing only Infiltrated Stormwater to storm or combined sewers.high
#Q010administrativeoperationalmandatoryShort-term Discharge Conditional PermissionwastewaterAt the time of emergency repair, Short-term Discharge of Foundation Drainage via a Temporary Connection may be permitted to the City's sewer system, under the following conditions: a) All requirements for obtaining a Private Water Discharge Permit will be satisfied for Short-term Discharge. b) Short-term Discharge meets the applicable quality limits of the Toronto Municipal Code - Chapter 681, Sewers. c) Short-term Discharge to the City's sewer system will occur only under Dry Weather Flow conditions and a Servicing Report, prepared by a Qualified Professional with a P.Eng. license, confirms adequate sewer capacity will be available in the receiving sewer system.Applicable during future emergency repairs to On-site Management measures. No sewer surcharge under Dry Weather Flow for capacity confirmation.high
#Q011administrativeoperationalguidanceExemption Authority Application ProcesswastewaterAt the written request of the development applicant/owner, where a Qualified Professional has demonstrated, to the satisfaction of the General Manager of Toronto Water, that On-site Management of Foundation Drainage is not technologically feasible and Long-term Discharge of Foundation Drainage is required to avoid hazardous impacts, the General Manager of Toronto Water, in their sole discretion, may exempt provisions of this policy to allow the development site owner to apply for Long-Term Discharge of Foundation Drainage.Upon written request when On-site Management is not technologically feasible and Long-term Discharge is required to avoid hazardous impacts.high
#Q012administrativeoperationalmandatoryExemption Conditions for Storm or Combined SewerwastewaterUpon the receipt of an exemption: a) Long-Term Discharge of Foundation Drainage to the City's storm or combined sewer system may be permitted, under the following conditions: i. All requirements for obtaining a Private Water Discharge Agreement will be satisfied for Long-term Discharge. ii. A Hydrological Report, prepared by a Qualified Professional in accordance with the Hydrological Review Terms of Reference, deems that the Foundation Drainage will meet applicable quality limits of Toronto Municipal Code - Chapter 681, Sewers, via reasonable and practical measures that are operationally and financially sustainable. iii. A Stormwater Management Report, prepared by a Qualified Professional with a P.Eng. license, demonstrates that water management targets of the City's Wet Weather Flow Management Guidelines will be met. iv. A Servicing Report, prepared by a Qualified Professional with a P.Eng. license, confirms that all applicable sewer capacity criteria will be met in accordance with the City's Design Criteria for Sewer and Watermains, where discharges are proposed to the combined sewers.Applicable upon receipt of an exemption where discharges are proposed to storm or combined sewers. Where storm sewers do not exist to service the development site for combined sewers.high
#Q013administrativeoperationalmandatoryExemption Conditions for Sanitary SystemwastewaterUpon the receipt of an exemption: b) Long-term Discharge of Foundation Drainage to the City's sanitary system may be permitted, under the following conditions: i. All requirements for obtaining a Private Water Discharge Agreement will be satisfied for Long-term Discharge. ii. A Hydrological Report, prepared by a Qualified Professional in accordance with the Hydrological Review Terms of Reference, deems that the Foundation Drainage will meet applicable quality limits of Toronto Municipal Code - Chapter 681, Sewers, via reasonable and practical measures that are operationally and financially sustainable. iii. A Servicing Report, prepared by a Qualified Professional with a P.Eng. license, confirms that all applicable sewer capacity criteria will be met in accordance with the City's Design Criteria for Sewer and Watermains, for all proposed discharges to the sanitary sewers.Applicable upon receipt of an exemption where discharges are proposed to the sanitary sewers.high
#Q014reportingreportingmandatoryMTD Summary Form SubmissionotherMTD Summary Form to completed in accordance with Design Criteria for MTDs and appended as part of Stormwater Management ReportApplicable to all SWM reports involving Manufactured Treatment Deviceshigh
#Q015designtreatmentmandatoryOGS Verification Protocolother[For OGS] Canada ETV OGS Lab Protocol + ISO 14034: ETV VerificationRequired when proposing an Oil-Grit Separator devicehigh
#Q016designtreatmentmandatoryFilter Device Verification Standardother[For Filter Device] TAPE Field Test Protocol 1 + TAPE CertificationRequired when proposing a Filter Devicehigh
#Q017designoperationalmandatoryMTD Scaling ProvisionsotherScaling Provisions MetApplicable where proposed model is not the same as tested modelhigh
#Q018designtreatmentmandatoryInline OGS Scour LimitotherMaximum Scour Concentration at Maximum Tested Scour Flow Rate <= 25mg/LApplicable for Option A: Inline OGS installationhigh
#Q019operationaloperationalmandatoryOGS Storage Capacity Requirementother[For OGS] Provided MTD Storage Capacity > Annual Sediment Loading Volumehigh
#Q020reportingreportingmandatoryStormwater Management Report Mandatory AttachmentsotherAttachments with SWM Report [select all applicable]: MTD Engineering Drawings, Verification Statements/Certification Report, MTD Sizing and Performance Calculation Sheet, Hydraulic Calculations for Inline/Offline Installation, Operations & Maintenance Manualhigh
#Q021designoperationalmandatoryInline OGS Bypass Capacity - RainfallotherInternal By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow RateApplicable for Option A. Inline OGShigh
#Q022designoperationalmandatoryInline OGS Bypass Capacity - ScourotherInternal By-pass Capacity > Inlet Pipe Capacity minus Maximum Scour Flow RateApplicable for Option A. Inline OGShigh
#Q023designoperationalmandatoryInline Filter Bypass CapacityotherInternal By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow RateApplicable for Option B. Inline Filterhigh
#Q024designoperationalmandatoryOff-line MTD Diversion CapacityotherDiversion By-pass Capacity > Inlet Pipe Capacity minus 90% Annual Rainfall Flow RateApplicable for Option C. Off-line OGS or Filterhigh
#Q025operationaloperationalmandatoryFilter Device Maintenance IntervalotherManufacturer Designed and Recommended Maintenance Interval: _________________ yearApplicable for Filter Devicehigh
#Q026operationaloperationalmandatoryWatermain Service Valve Functionalitydrinking waterVerify curb stops and service line valves are functional and set to gradePart of Watermain Service Connections (1.A) for Acceptance and Assumptionhigh
#Q027reportingreportingmandatoryWater Service Card Submissiondrinking waterComplete and submit Water Service Cards (new and replaced connections)Required for post-construction Acceptancehigh
#Q028operationaloperationalmandatoryWater Isolation Valve Operation Standardsdrinking waterVerify the correct opening and closing direction of water isolation valves and that TW can operate the valve in accordance with the specified district standard (Etobicoke/York, North York, Toronto/East York, Scarborough).Required for post-construction Acceptancehigh
#Q029monitoringhealthmandatoryWatermain Disinfection and Quality Resultsdrinking waterSubmit approved Disinfection Proposal Plan, Disinfection Record and passing Watermain Water Quality Test Results in accordance with TS 7.30.Required for post-construction Acceptancehigh
#Q030monitoringoperationalmandatoryWatermain Hydrostatic Leak Testdrinking waterPerform passing Hydrostatic Leak Test in accordance with TS 7.30 in presence of the City InspectorRequired for post-construction Acceptancehigh
#Q031designoperationalmandatoryNon-Metallic Watermain Tracer Wire Installationdrinking waterVerify all tracer wires have been installed on all non-metallic watermains along the full length of the pipe and have been connected appropriately to the existing watermain system to provide a means of locating the main in accordance with TS 7.40Applicable to all non-metallic watermainshigh
#Q032designoperationalmandatoryMetallic Watermain Cathodic Protectiondrinking waterVerify cathodic protection has been installed on all metallic watermains and metallic fittings that are installed on non-metallic watermains in accordance with TS 7.22.Applicable to metallic watermains and fittingshigh
#Q033designoperationalmandatoryFire Hydrant Colour Coding and Capacity Discsdrinking waterVerify all hydrants are colour coded in accordance with National Fire Protection Association (NFPA) 291. Barrels must be chrome yellow; identification discs must use capacity indicating colour scheme (Light blue: AA, Green: A, Orange: B, Red: C).Required for post-construction Acceptancehigh
#Q034monitoringoperationalmandatoryHydrant Flow Test Submissiondrinking waterComplete hydrant flow test in accordance with NFPA 291 and submit accepted Flow Testing Report by the City ECS Inspector / Case ManagerRequired for post-construction Acceptancehigh
#Q035designoperationalmandatorySewer Service Connection Clean-outswastewaterVerify that clean-outs, including sampling ports and control maintenance holes, have been installed at street line and set to grade for all sewer service connections for residential lots and/or development blocksRequired for Acceptance and Assumptionhigh
#Q036monitoringoperationalmandatorySewer Crossed Connection Dye TestwastewaterVerify that there are no crossed sewer service connections by dye testRequired for post-construction Acceptancehigh
#Q037monitoringoperationalmandatorySewer Cleaning and CCTV InspectionwastewaterClean new sewers in accordance with TS 411 and complete and submit CCTV inspection with a consultant report, certification letter and appropriate NASSCO PACP coding... in accordance with TS 409 without any deficienciesRequired for post-construction Acceptancehigh
#Q038monitoringoperationalmandatorySanitary Sewer Leakage TestingwastewaterComplete leakage testing such as low pressure air testing, water (hydrostatic) test or vacuum testing and submit report for all new sanitary sewers and maintenance holes in accordance with TS 407 and TS 410 or TS 415 or TS 416, as applicableRequired for post-construction Acceptancehigh
#Q039monitoringoperationalmandatoryFlexible Sewer Deflection TestingwastewaterComplete deflection testing and submit report for all new flexible sanitary and storm sewers at least 30 calendar days after backfilling but prior to paving in accordance with TS 410 or TS 415 or TS 416, as applicableRequired for post-construction Acceptancehigh
#Q040operationaloperationalmandatoryInfrastructure Abandonment Evidencewastewater, drinking waterVerify and submit evidence (photos and inspector notes) that infrastructure has been abandoned (e.g. seal, plug or cap mainline pipes and disconnect all existing service connections) per City Standards and in accordance with TS 510Required for post-construction Acceptancehigh
#Q041monitoringoperationalmandatoryStormwater Management Inspection and Monitoring ReportotherComplete and submit Inspection and Monitoring Report, including an estimate of the quantity of any sediment removed for stormwater management facilities.Required for underground storage, MTDs, and ponds for post-construction Acceptancehigh
#Q042operationaloperationalmandatoryStormwater Infrastructure CleaningotherVerify infrastructure is cleaned as documented in Operation & Maintenance manual and within 12 months prior to assumption by CityRequired for City assumption at the end of warranty periodhigh
#Q043administrativereportingmandatoryWellness Report Digital PDF SubmissionotherThe external consultant is responsible for completing and submitting one digital PDF of the completed Wellness Report including attachments (Submission Documents), to the City case manager including assuring appropriate City inspector sign offs.Standard submission process for all projectshigh
#Q044designhealthmandatoryBackflow Prevention Device Requirementdrinking waterThe Water Supply By-law protects the integrity of Toronto's drinking water distribution system by requiring the installation and maintenance of backflow prevention devices at ICI and multi-residential properties.Applicable to industrial, commercial, institutional (ICI) and multi-residential properties.high
#Q045treatmentoperationalmandatoryAmalgam Separator Installation RequirementwastewaterFor example, dental offices must install amalgam separators to prevent mercury and other metal particles from entering the sewer system.Applicable to dental offices.high
#Q046reportingreportingmandatoryPollution Prevention (P2) Plan SubmissionwastewaterThis program requires industries discharging any amount of the 33 subject pollutants identified in the Sewers By-law to submit and maintain a P2 Plan until that business continually meets the requirements of and is participating in a Best Management Practices plan (BMP).Applicable to industries discharging any amount of the 33 subject pollutants identified in the Sewers By-law.high
#Q047corrective_actionoperationalguidanceCompliance Plan Application for Non-Compliancewastewaterthe Sewers By-law permits businesses whose discharge are non-compliant with the by-law parameter limits to submit a compliance plan application to the General Manager.Applicable when business discharge exceeds by-law parameter limits.high
#Q048administrativeoperationalmandatoryPrivate Water Discharge Agreement RequirementwastewaterThe City enters into agreements and permits with applicants and property owners who draw from private water sources (e.g. groundwater) and discharge into the City sanitary, combined, or storm sewers.Applicable to entities drawing from private water sources and discharging to City sewers.high
#Q049reportingreportingmandatoryAnnual Report Submissionaquatic life, otherThese regulations require aquaculture owners and operators to submit annual reports on their activities to the appropriate Regional Aquaculture Management Office no later than April 1 of the year following the year being reported on.Annual requirement; report covers activities from the previous calendar year.high
#Q050reportingreportingmandatoryPest Control Deposit Notificationaquatic lifethese regulations also require aquaculture owners and operators to notify DFO of: their intent to deposit pest control productsPrior to deposit of pest control products.high
#Q051reportingreportingmandatoryMorbidity Event Notificationaquatic lifethese regulations also require aquaculture owners and operators to notify DFO of: any morbidity events they observeUpon observation of a morbidity event.high
#Q052reportingreportingmandatoryBOD Threshold Exceedance Notificationaquatic life, otherthese regulations also require aquaculture owners and operators to notify DFO of: any exceedances of biological oxygen demanding thresholdsUpon detection of BOD threshold exceedance.high
#Q053reportingreportingmandatorySite Expansion Application Notificationotherthese regulations also require aquaculture owners and operators to notify DFO of: when they submit an application to a provincial or territorial authority for a new or expanded siteConcurrent with provincial or territorial application submission.high
#Q054monitoringoperationalmandatoryEnvironmental Monitoring and Samplingaquatic life, otherThe regulations also impose specific environmental monitoring and sampling requirements on the industry.Applicable to aquaculture industry operators.high
#Q055operationaloperationalmandatoryHabitat Impact Mitigationaquatic lifeThe AAR allow aquaculture operators to [install, operate, maintain or remove a facility] within specific restrictions to avoid, minimize and mitigate any potential detriments to fish and fish habitat.Applies to facility installation, operation, maintenance, and removal.high
#Q056reportingreportingmandatoryMandatory BWRF Submissionotherthe Canadian Ballast Water Reporting Form (BWRF) ... must be submitted by the master of a vessel that is bound for a port, offshore terminal, or anchorage area in Canada to Transport Canada Marine Safety and Security (TCMSS) in accordance with the Ballast Water Regulations (The Regulations).Applicable to masters of vessels bound for Canadian ports, offshore terminals, or anchorage areas.high
#Q057reportingreportingmandatoryUse of Current BWRF VersionotherTCMSS does not accept expired/outdated BWRF versions. To fully comply with all reporting requirements, vessel’s master must use the current version of the Canadian BWRF available at the time of the submission.high
#Q058administrativereportingmandatoryActive PDF Submission FormatotherThe BWRF shall be sent as an “Active” PDF using “save” or “ save as” file options to enable data entry software.Forms which have been “scanned” or “Printed to PDF” will NOT be accepted.high
#Q059reportingreportingmandatoryMandatory Completion of All FieldsotherAll fields shall be filled in, even if the values are zero or NA.high
#Q060reportingreportingmandatoryElectronic Forwarding to TCMSSotherOnce the BWRF is completed by the Master, an electronic copy is to be forwarded to TCMSS in the manner described in the Ship Safety Bulletin #07/2022 - Instructions for submitting Canadian Ballast Water Reporting Formhigh
#Q061reportingreportingmandatorySubmission of Amended BWRFotherAmended forms are to be submitted if there are any changes to the original ballast water reporting form. This could include changes in the “Arrival Date,” “Arrival Port” or planned ballast discharges. An amended form is to be submitted if the actual ballast discharged is different from the originally reported discharge.Required when data differs from original submission.high
#Q062administrativereportingmandatoryVessel Name Entry RestrictionsotherEnter the name of the vessel... Do not add additional extension such as “M/V” (Motor Vessel), “M/S” (Motor Ship) or “T/S” (Tanker Ship / Tall Ship).high
#Q063reportingreportingmandatoryPort and Location FormattingotherAll “port” fields should contain only the name of the port and not the country. No abbreviations shall be used.high
#Q064reportingreportingmandatoryBallast Tank History RecordingotherRecord information for all ballast tanks/holds regardless of ballast water management intentions in the section 5 tablesApplies to all tanks even if empty or having residuals.high
#Q065reportingreportingmandatoryCoordinate Entry FormatotherAll position (latitude and longitude) shall be entered in the format: 00 00 N or 00 00 S; and 000 00 W or 000 00 E).high

P Quantitative Requirements (6)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#R001physicaltreatmentmandatoryMaximum Scour Concentrationwastewaterrequirement<= 25 mg/LMaximum Scour Concentration at Maximum Tested Scour Flow Rate for Option A Inline OGSApplicable to Inline OGS installation configurationhigh
#R002designtreatmentmandatoryAnnual Rainfall Volume Capturewastewatertreatment_goal90 %Annual Rainfall Volume Capture used for Design Treatment FlowUsed for sizing and performance evaluation of filters and bypass calculationshigh
#R003designoperationalmandatoryMaximum Sediment Storage Depth Multiplierwastewaterrequirement50 %Used to calculate Maximum Treatment DepthMaximum Treatment Depth = Chamber Depth minus 50% of Maximum Sediment Storage Depthhigh
#R004designtreatmentmandatoryDesign Intensity Lower Boundwastewaterrequirement10 %Lower limit of design intensities for performance evaluationCalculated range for design intensities corresponding to Annual Rainfall Volume Capturedhigh
#R005designtreatmentmandatoryDesign Intensity Upper Boundwastewaterrequirement100 %Upper limit of design intensities for performance evaluationCalculated range for design intensities corresponding to Annual Rainfall Volume Capturedhigh
#R006operationaltreatmentmandatoryMinimum Captured Events for Protocol Verificationwastewaterrequirement>= 3 eventsRequirement for protocol verification involving rainfall intensity and depth corresponding to 90% average annual rainfall volume.Applicable to TAPE Field Test Protocol verification for filter deviceshigh

D Definitions (74)

Req ID Category Name Context Confidence
#D001Ballast waterBallast water as defined in the definition section of the Ballast Water Regulations means water with its suspended matter taken on board a ship to control trim, list, draught, stability, or stresses of the vesselhigh
#D002CompanyCompany means the owner of the ship or any other organization or person such as the manager, or the bareboat charterer, who has assumed the responsibility for operation of the ship from the owner of the ship and who on assuming such responsibility has agreed to take over all the duties and responsibilities imposed by the international Safety Management Codehigh
#D003Residual amountsResidual amounts as defined in the Ballast Water Regulations means the quantity of ballast water that cannot be removed from a ballast tank using the equipment installed on the vessel for that purposehigh
#D004SedimentsSediments means matter settled out of ballast water within a vesselhigh
#D005BWRFCanadian Ballast Water Reporting Formhigh
#D006TCMSSTransport Canada Marine Safety and Securityhigh
#D007The RegulationsBallast Water Regulationshigh
#D008BWMPballast water management planhigh
#D009MMSI NumberMaritime Mobile Service Identity numberhigh
#D010The ConventionInternational Convention for the Control and Management of Ships ‘Ballast Water and Sediments, 2004high
#D011Bulk carrieras defined in SOLAS regulation IX/1, but excludes combination carrierhigh
#D012MODU & FPSOmobile offshore drilling unit and floating production, storage, offloading unithigh
#D013BWRBBallast Water Record Bookhigh
#D014IBWMCInternational Ballast Water Management Certificatehigh
#D015AMSEExecutive Director, Navigation Safety and Environmental Programshigh
#D016BWMSBallast Water Management Systemhigh
#D017D-1ballast water exchange standardhigh
#D018D-2ballast water performance standardhigh
#D019NLSNoxious Liquid Substanceshigh
#D020RORecognized Organisationhigh
#D021BWRBallast Water Regulationshigh
#D022Date of constructionthe date of construction as defined in the International Convention for the Control and Management of Ships ‘Ballast Water and Sediments, 2004 hereafter (The Convention), Regulation A-1high
#D023Container vesselto be applied only to vessel specifically constructed or adapted to carry containershigh
#D024Oil tankerto be applied to vessels only certified to carry mineral oilhigh
#D025IBC CodeInternational Bulk Chemical Codehigh
#D026SPS CodeSpecial Purpose Ships Codehigh
#D027M/VMotor Vesselhigh
#D028M/SMotor Shiphigh
#D029T/STanker Ship / Tall Shiphigh
#D030IMO Numberthe vessel’s IMO number as established under the IMO Ship Identification Number Schemehigh
#D031Gross tonnagethe gross tonnage of the vessel as established under the International Convention on Tonnage Measurement of Ships, 1969 or any successor Conventionhigh
#D032Chemical tankerincludes all typeshigh
#D033Combination carrierincludes ore / oil and ore / bulk / oil carrierhigh
#D034Gas carrierincludes all typeshigh
#D035FPForepeakhigh
#D036DBDouble bottomhigh
#D037WTWing tankhigh
#D038TSTopsidehigh
#D039APAftpeakhigh
#D040CHCargo holdhigh
#D041SMsequential methodhigh
#D042FTMflow through methodhigh
#D043SWFsaltwater flushinghigh
#D044Rretention methodhigh
#D045NMno managementhigh
#D046DMdilution methodhigh
#D047PWpotable waterhigh
#D048PRFport reception facilityhigh
#D049OBOOre-bulk-oil carrierhigh
#D050ISMInternational Safety Managementhigh
#D051pptparts per thousandhigh
#D052DSCSupported Craft Codehigh
#D053HSCHigh speed crafthigh
#D054General cargo / multipurpose shipto be used for other cargo vessels when no other ship type code is applicablehigh
#D055High speed cargo craftincludes all vessels constructed under the DSC or HSC codehigh
#D056High speed passenger craftincludes all vessels constructed under the DSC or HSC codehigh
#D057NLS tankerOnly for Noxious Liquid Substances (NLS) to which the International Bulk Chemical Code (IBC Code) does not applyhigh
#D058Offshore service vesselincludes such types as offshore supply vessel, anchor handling vessels, rescue / standby vesselshigh
#D059Passenger vesselnot to be used for vessels constructed under the DSC or HSC codehigh
#D060Ro-Ro passenger vesselnot be used for vessels constructed under the DSC or HSC code,high
#D061ISCHigh-Speed Craft Codehigh
#D062SSBShip Safety Bulletinhigh
#D063Brownfield PropertyVacant or underutilized places where past industrial or commercial activities may have left contamination behind.high
#D064Dry Weather FlowFlow in sewers representing typical day conditions with no rainfall or precipitation events.high
#D065Foundation DrainageInfiltrated stormwater, or groundwater, or both, that may be collected in a drain installed at the foundation of a structure.high
#D066GroundwaterWater that exists in the saturated zone in sub-surface soil.high
#D067Infiltrated StormwaterStormwater that enters the unsaturated zone in sub-surface soil, located above the Maximum Anticipated Groundwater Level, during storm or rainfall events or snow melt.high
#D068Long-term DischargeDischarge of Foundation Drainage for a period of more than 12 months, per application.high
#D069Maximum Anticipated Groundwater LevelEstimated upper level of the saturated zone in the sub-surface soil, based on site-specific monitoring and an allowance for seasonal and multi-year fluctuations in groundwater. This estimated value is not intended for use in structural engineering design.high
#D070On-site ManagementManagement of Foundation Drainage on private property, within the boundaries of the development site, without discharging to the City's sewer system. Measures may include watertight construction and/or at-grade discharge for Groundwater recharge.high
#D071Qualified ProfessionalA person with knowledge, training and experience in the pertinent discipline, and who is a qualified expert with expertise appropriate for the relevant critical area or subject matter.high
#D072StormwaterWater from rainfall, other natural precipitation or the melting of snow or ice.high
#D073Short-term DischargeDischarge of Foundation Drainage to the City's sewer system for a period of no longer than 12 months per application, required for future emergency repair of On-site Management measures.high
#D074Temporary ConnectionFuture connection from Foundation Drainage infrastructure placed on private property line to City's sewers that may be required to facilitate the Short-term Discharge of Foundation Drainage. Foundation Drainage infrastructure on private property is to be disconnected from City sewers before and after Short-term Discharge has taken place. All associated works and costs to be undertaken by the development applicant/owner.high