Parameter Viewer

Document ID ca-on-toronto-ppp-2023-07-2 Title Pollution Prevention (P2) Program URL https://www.toronto.ca/services-payments/property-taxes-utilities/utility-bill/water-rates-fees/ Jurisdiction /ca/on/toronto Subdomain(s) none Language Status completed Analyzed at 2026-05-12 01:50:33.425265+00:00 Relevance inventory_targeted_fetch

Q Qualitative Requirements (0)

No qualitative requirements.

P Quantitative Requirements (23)

Req ID Category Intent Legal Status Name Subdomain(s) Limit Type Limit Value Context Conditions Confidence
#P001operationaloperationalmandatoryBlock 1 Metric Water Consumption Limitdrinking waterrequirement<= 5000 m3For all water consumption up to 5,000 m3Metric Rateshigh
#P002operationaloperationalmandatoryBlock 2 Metric Water Consumption Thresholddrinking waterrequirement> 5000 m3For consumption over 5,000 m3Metric Rateshigh
#P003operationaloperationalmandatoryBlock 1 Gallon Water Consumption Limitdrinking waterrequirement<= 1099850 gallonsFor all water consumption up to 1,099,850 gallonsGallon Rateshigh
#P004operationaloperationalmandatoryBlock 2 Gallon Water Consumption Thresholddrinking waterrequirement> 1099850 gallonsFor consumption over 1,099,850 gallonsGallon Rateshigh
#P005operationaloperationalmandatoryResidential water service disconnection maximum sizedrinking waterrequirement<= 25 mmDisconnection Fee for any residential water service less than or equal to 25 mmWater Feeshigh
#P006operationaloperationalmandatoryReuse of residential water service sizedrinking waterrequirement19-25 mmReuse of residential water service 19 mm to 25 mmWater Feeshigh
#P007operationaloperationalmandatorySingle Service call Turn-off/Turn-on time limitdrinking waterrequirement<= 30 minutesSingle Service call Turn-off/Turn-on within 30 minutesWater Feeshigh
#P008operationaloperationalmandatoryWater meter accuracy test maximum meter sizedrinking waterrequirement<= 50 mmWater meter accuracy test; meter less than or equal to 50 mmApplied if the meter does not over-registerhigh
#P009operationaloperationalmandatoryInspection fee for the reuse of residential City sewer connection maximum sizewastewaterrequirement<= 150 mmInspection fee for the reuse of residential City sewer connection up to 150 mm in diameterWastewater Feeshigh
#P010operationaloperationalmandatoryTechnical Review additional hourly fee start thresholdwastewater, drinking waterrequirement> 4 hrsadditional $108.73/hr for each hour after 4 hrsTechnical Review by Toronto Water staffhigh
#P011operationalreportingmandatoryDry Cleaners P2 Plan submission frequencywastewaterrequirement6 yearsSubmit a P2 Plan every six yearsDry cleaners and commercial laundrieshigh
#P012operationalreportingmandatoryDry Cleaners P2 Plan update frequencywastewaterrequirement3 yearsupdate on the third year of the six-year cycleDry cleaners and commercial laundrieshigh
#P013operationalreportingmandatoryHealth Care P2 Plan submission frequencywastewaterrequirement6 yearsSubmit a P2 Plan every six yearsHealth care institutionshigh
#P014operationalreportingmandatoryHealth Care P2 Plan update frequencywastewaterrequirement3 yearsupdate on the third year of the six-year cycleHealth care institutionshigh
#P015operationalreportingmandatoryCommercial Printers P2 Plan submission frequencywastewaterrequirement6 yearsSubmit a P2 Plan every six yearsCommercial printershigh
#P016operationalreportingmandatoryCommercial Printers P2 Plan update frequencywastewaterrequirement3 yearsupdate on the third year of the six-year cycleCommercial printershigh
#P017operationalreportingmandatoryIndustrial Facilities P2 Plan submission frequencywastewaterrequirement6 yearsSubmit a P2 Plan every six yearsIndustrial facilities (Manufacturers, metal finishers, industrial laundry)high
#P018operationalreportingmandatoryIndustrial Facilities P2 Plan update frequencywastewaterrequirement3 yearsupdate on the third year of the six-year cycleIndustrial facilitieshigh
#P019operationalreportingmandatoryNon-Sector Facilities P2 Plan submission frequencywastewaterrequirement6 yearsAs a result of regular inspection or sampling... P2 Plan every six yearsUpon request from Toronto Waterhigh
#P020operationalreportingmandatoryNon-Sector Facilities P2 Plan update frequencywastewaterrequirement3 yearsupdate on the third year of the six-year cycleUpon request from Toronto Waterhigh
#P021operationalreportingmandatoryAutomotive Service BMP Declaration frequencywastewaterrequirement1 timeSubmit a one-time Declaration Form confirming compliance with the BMPAutomotive service facilitieshigh
#P022operationalreportingmandatoryDental Facilities P2 Plan frequencywastewaterrequirement1 timeSubmit a one-time P2 Plan using the Dental Facilities P2 FormDental officeshigh
#P023operationalreportingmandatoryPhotofinishing Operations Declaration frequencywastewaterrequirement1 timeSubmit a one-time Declaration Form confirming compliance with the BMPPhotofinishing facilitieshigh

D Definitions (0)

No definitions.