| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|
| #Q001 | administrative | unknown | mandatory | NPDES General Permit Coverage Requirement | other | Dischargers whose projects disturb one (1) or more acres of soil or whose projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit for Stormwater Discharges Associated with Construction and Land Disturbance Activities. | Projects disturb one (1) or more acres of soil or disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres | high |
| #Q002 | administrative | unknown | mandatory | Lake Tahoe Basin Regional Permit Application | other | Owners of construction projects in this watershed must apply for the Regional Water Board permit rather than the statewide permit. | Construction projects located in the Lake Tahoe Hydrologic Unit watershed | high |
| Req ID | Category | Intent | Legal Status | Name | Subdomain(s) | Limit Type | Limit Value | Context | Conditions | Confidence |
|---|---|---|---|---|---|---|---|---|---|---|
| #P001 | operational | operational | mandatory | Soil disturbance area requiring NPDES General Permit coverage | other | requirement | >= 1 acres | Dischargers whose projects disturb one (1) or more acres of soil or whose projects disturb less than one acre but are part of a larger common plan of development that in total disturbs one or more acres, are required to obtain coverage under the National Pollutant Discharge Elimination System (NPDES) General Permit. | Applicable to clearing, grading and disturbances to the ground such as stockpiling, or excavation; does not include regular maintenance activities performed to restore the original line, grade, or capacity of the facility. | high |
No definitions.