Ministry of the Environment Conservation and Parks
Ministry of the Environment, Conservation and Parks
Version 3.0
February 2026
A copy of this document can be obtained from:
Client Services & Permissions Branch Email: MDWLP@ontario.ca
| Introduction........................................................................................................................4 | Introduction........................................................................................................................4 |
|---|---|
| Operational Plan.................................................................................................................................................................4 | Operational Plan.................................................................................................................................................................4 |
| Roles, Responsibilities and Authorities.............................................................................................................5 | Roles, Responsibilities and Authorities.............................................................................................................5 |
| Director's Directions........................................................................................................................................................6 | Director's Directions........................................................................................................................................................6 |
| Guidance Document.......................................................................................................................................................6 | Guidance Document.......................................................................................................................................................6 |
| Drinking Water Quality Management Standard...............................................7 | Drinking Water Quality Management Standard...............................................7 |
| Scope.........................................................................................................................................................................................7 | Scope.........................................................................................................................................................................................7 |
| Terms and Definitions....................................................................................................................................................7 | Terms and Definitions....................................................................................................................................................7 |
| PLAN and DO Elements of the Quality Management Standard.................................................10 | PLAN and DO Elements of the Quality Management Standard.................................................10 |
| 1. | Quality Management System...................................................................................................................10 |
| 2. | Quality Management System Policy...................................................................................................10 |
| 3. | Commitment and Endorsement...............................................................................................................11 |
| 4. | Quality Management System Representative...............................................................................11 |
| 5. | Document and Records Control.............................................................................................................12 |
| 6. | Drinking Water System..................................................................................................................................13 |
| 7. | Risk Assessment..................................................................................................................................................14 |
| 8. | Risk Assessment Outcomes.......................................................................................................................15 |
| 9. | Organizational Structure, Roles, Responsibilities and Authorities.................................15 |
| 10. | Competencies.......................................................................................................................................................16 |
| 11. | Personnel Coverage.........................................................................................................................................16 |
| 12. | Communications.................................................................................................................................................16 |
| 13. | Essential Supplies and Services..............................................................................................................17 |
| 14. | Review and Provision of Infrastructure..............................................................................................17 |
| 15. | Infrastructure Maintenance, Rehabilitation and Renewal....................................................18 |
| 16. | Sampling, Testing and Monitoring.........................................................................................................18 |
| 17. | Measurement and Recording Equipment Calibration and Maintenance.................19 |
| 18. | Emergency Management.............................................................................................................................19 |
| CHECK Elements of the Quality Management Standard................................................................20 | CHECK Elements of the Quality Management Standard................................................................20 |
| 19. Internal Audits.....................................................................................................................................................20 | 19. Internal Audits.....................................................................................................................................................20 |
| 20. Management Review.....................................................................................................................................20 | 20. Management Review.....................................................................................................................................20 |
| IMPROVE Element of the Quality Management Standard.............................................................22 | IMPROVE Element of the Quality Management Standard.............................................................22 |
| 21. Continual Improvement................................................................................................................................22 | 21. Continual Improvement................................................................................................................................22 |
Ontario has established a strong regulatory framework for drinking water systems in the province. This framework under the Safe Drinking Water Act, 2002 (SDWA or Act) and related regulations focuses on compliance-based results which are verified through the Ministry of the Environment, Conservation and Parks' compliance and abatement programs.
The Drinking Water Quality Management Standard (DWQMS or this Standard) is the Quality Management Standard approved under s. 21 of the SDWA, and complements this legislative and regulatory framework by endorsing a proactive and preventive approach to assuring drinking water quality. This approach includes consideration of elements that are fundamental to ensuring the long-term sustainability of a Drinking Water System including: Management processes employed within the system; the maintenance of infrastructure used to supply drinking water; and, identification of potential risks and risk mitigation strategies for items such as system security, water treatment, and the impacts of climate change.
The SDWA requires Owners and Operating Authorities of Municipal Residential Drinking Water Systems to have an accredited Operating Authority. In order to become accredited, an Operating Authority must establish and maintain a Quality Management System (QMS). Minimum requirements for the QMS are specified in this Standard, the DWQMS. Operating Authorities are accredited by a third-party accreditation body against the requirements of this Standard.
The DWQMS requires an Operating Authority to document a Quality Management System for each Subject System that it operates in an Operational Plan which must be accepted by the Ministry of the Environment, Conservation and Parks. The term Subject System is used in the DWQMS to refer to either a Municipal Residential Drinking Water System or an Operational Subsystem, as applicable in the circumstances.
Where an Operating Authority is operating multiple Subject Systems for a single Owner, the Operating Authority may choose to develop QMS components that are common for all Drinking Water Systems. The Operational Plan for the Subject System would contain these common components or would reference separate documents that would be available to users of the Operational Plan. The common QMS components would need to be implemented both at the Subject System level and at the corporate level, and corporate roles, responsibilities and authorities would need to be documented for each level.
The DWQMS requires that roles, responsibilities and authorities be defined. Where the Owner and Operating Authority are the same entity, the Operational Plan should identify a specific person, persons or group of people within the entity and their respective Owner and/or Operating Authority roles, responsibilities and authorities. If the same person, persons or group of people are assigned both Owner and Operating Authority roles, responsibilities and authorities, then the requirement to communicate the QMS between Top Management and the Owner is met by the person, persons or group of people in possession of the information to be communicated.
In cases where the Owner has not assigned Operating Authority roles, responsibilities and authorities to a specific person, persons or group of people within the entity, the Owner will assume all of the roles, responsibilities and authorities of the Operating Authority. If the Owner is not the same entity as the Operating Authority, s.14 of the SDWA specifies that the Owner and the Operating Authority shall enter into an agreement that identifies, among other things, their respective responsibilities. Section 11 of the SDWA provides further information on the duties of Owners and Operating Authorities.
The Director's Directions: Minimum Requirements for Operational Plans, issued under s.15 of the SDWA (Director's Directions), provides further direction respecting the minimum content of Operational Plans as well as rules respecting document retention, public disclosure of information and other requirements that the Director considers necessary for the purposes of the Act and its regulations. The Director's Directions may be amended, revoked or replaced by the Director under s.15(3) of the Act and the amendment, revocation or replacement is effective when notice is given on the Environmental Registry of Ontario in accordance with s.15(6). The current version of the Director's Directions is available at www.ontario.ca/drinkingwater.
Additional information and guidance relating to QMS and DWQMS concepts is available in 'Ontario's' Drinking Water Quality Management Standard - Pocket Guide' and other materials available at www.ontario.ca/drinkingwater.
This Standard specifies minimum requirements for the Quality Management System of an Operating Authority for a Subject System:
In the DWQMS these terms have the following meaning:
Audit - a systematic and documented verification process that involves objectively obtaining and evaluating documents and processes to determine whether a Quality Management System conforms to the requirements of this Standard.
Calendar Year - A period of one year beginning and ending with the dates conventionally accepted as marking the beginning and end of a year (January 1st to December 31st).
Consumer - the drinking water end user.
Corrective Action - action to eliminate the cause of a detected nonconformity of the QMS with the requirements of the DWQMS or other undesirable situation.
Critical Control Limit - the point at which a Critical Control Point response procedure is initiated.
Critical Control Point - an essential step or point in the Subject System at which control can be applied by the Operating Authority to prevent or eliminate a Drinking Water Health Hazard or to reduce it to an acceptable level.
Document - has the same meaning as 'document' defined in s. 2(1) of the Act.
Director means the director appointed for the purposes of s.15 of the Act.
Distribution System - has the same meaning as 'distribution system' defined in s. 2(1) of the Act.
Drinking Water Health Hazard - has the same meaning as 'drinking water health hazard' defined in s. 2(1) of the Act.
Drinking Water Quality Management Standard (DWQMS or this Standard) - has the same meaning as Quality Management Standard for Drinking Water Systems approved under s. 21 of the Act.
Drinking Water System - has the same meaning as 'drinking water system' defined in s. 2(1) of the Act.
Environmental Registry of Ontario - has the same meaning as 'Registry' defined in s.2(1) of the Act.
Examination Summary Report - a report summarizing sampling, testing and monitoring information that is created for the purpose of demonstrating compliance with legislated requirements for a given time period.
Municipal Drinking Water System - has the same meaning as 'municipal drinking water system' defined in s. 2(1) of the Act.
Municipal Residential Drinking Water System - has the same meaning as 'large municipal residential system' or 'small municipal residential system' defined in s. 1(1) of O. Reg. 170/03.
Operating Authority - means, in respect of a Subject System, the person or entity that is given responsibility by the Owner for the operation, management, maintenance or alteration of the Subject System.
Operational Plan - means, in respect of a Subject System, the Operational Plan required by the Director's Directions.
Operational Subsystem - means a part of a Municipal Residential Drinking Water System operated by a single Operating Authority and designated by the Owner as being an Operational Subsystem.
Owner - has the same meaning as 'owner' defined in s. 2(1) of the Act.
Preventive Action - action to prevent the occurrence of nonconformity of the QMS with the requirements of the DWQMS or other undesirable situation.
Primary Disinfection - has the same meaning as 'primary disinfection' defined in s. 1(1) of O. Reg. 170/03.
Public - Subject System Consumers and stakeholders.
Quality Management System (QMS) - a system to:
Quality Management System Policy means the policy described in Element 2 developed for the Subject System or Subject Systems.
Record - a document stating results achieved or providing proof of activities performed.
Secondary Disinfection - has the same meaning as 'secondary disinfection' defined in s. 1(1) of O. Reg. 170/03.
Subject System - means:
Supplier - an organization or person that provides a product or service that affects drinking water quality.
Top Management - a person, persons or a group of people at the highest management level within an Operating Authority that makes decisions respecting
the QMS and recommendations to the Owner respecting the Subject System or Subject Systems.
Treatment System - has the same meaning as 'treatment system' defined in s. 2(1) of the Act.
PLAN - The Operational Plan shall document a Quality Management System that meets the requirements of this Standard.
DO - The Operating Authority shall establish and maintain the Quality Management System in accordance with the requirements of this Standard and the policies and procedures documented in the Operational Plan.
PLAN - The Operational Plan shall document a Quality Management System policy that provides the foundation for the Quality Management System, and:
DO - The Operating Authority shall establish and maintain a Quality Management System that is consistent with the Quality Management System Policy.
PLAN - The Operational Plan shall document a process for obtaining a written endorsement of its contents by Top Management and the Owner.
DO - The Operational Plan shall contain a written endorsement and Top Management shall provide evidence of its commitment to an effective Quality Management System by:
PLAN - The Operational Plan shall identify a Quality Management System representative.
DO - Top Management shall appoint and authorize a Quality Management System representative who, irrespective of other responsibilities, shall:
PLAN - The Operational Plan shall document a procedure for Document and Records control that describes how:
DO - The Operating Authority shall implement and conform to the procedure for Document and Records control and shall ensure that the Quality Management System documentation for the Subject System includes:
DO - The Operating Authority shall ensure that the description of the Drinking Water System is kept current.
DO - The Operating Authority shall perform a risk assessment consistent with the documented process.
PLAN - The Operational Plan shall document:
DO - The Operating Authority shall implement and conform to the procedures.
PLAN - The Operational Plan shall:
DO - The Operating Authority shall keep current the description of the organizational structure including respective roles, responsibilities and
authorities, and shall communicate this information to Operating Authority personnel and the Owner.
PLAN - The Operational Plan shall document:
DO - The Operating Authority shall undertake activities to:
PLAN - The Operational Plan shall document a procedure to ensure that sufficient personnel meeting identified competencies are available for duties that directly affect drinking water quality. The procedure shall consider:
DO - The Operating Authority shall implement and conform to the procedure.
PLAN - The Operational Plan shall document a procedure for communications that describes how the relevant aspects of the Quality Management System are communicated between:
DO - The Operating Authority shall implement and conform to the procedure.
PLAN - The Operational Plan shall:
DO - The Operating Authority shall implement and conform to the procedure.
PLAN - The Operational Plan shall document a procedure for reviewing the adequacy of the infrastructure necessary to operate and maintain the Subject System that:
DO - The Operating Authority shall implement and conform to the procedure and communicate the findings of the review to the Owner.
PLAN - The Operational Plan shall document:
PLAN - The Operational Plan shall document:
DO - The Operating Authority shall implement and conform to the procedures.
PLAN - The Operational Plan shall document a procedure for the calibration, verification and maintenance of measurement and recording equipment.
DO - The Operating Authority shall implement and conform to the procedure.
PLAN - The Operational Plan shall document a procedure to maintain a state of emergency preparedness that includes:
DO - The Operating Authority shall:
PLAN - The Operational Plan shall document a procedure for internal Audits that:
DO - The Operating Authority shall implement and conform to the procedure and shall ensure that internal Audits are conducted at least once every Calendar Year.
PLAN - The Operational Plan shall document a procedure for management review that evaluates the continuing suitability, adequacy and effectiveness of the Quality Management System and that includes consideration of:
DO - Top Management shall implement and conform to the procedure and shall:
PLAN - The Operating Authority shall develop a procedure for tracking and measuring continual improvement of its Quality Management System by:
DO The Operating Authority shall strive to continually improve the effectiveness of its Quality Management System by implementing and conforming to the procedure.