| I | II | III | IV | V | ||
|---|---|---|---|---|---|---|
| Ref. No. 1 | Service Metered Water Consumers | Fee Description Block 1 Domestic - Use General Water Service | Fee Basis Rate Per cubic metre ($/m3) | Fee Paid After Due Date $4.9338 | Fee Paid On/Before Due Date $4.6872 | Annual Adj. No |
| 2 | Metered Water Consumers | Block 2 - Industrial Process Use Service Rate - Applicable to industrial process use for eligible property or portions of property and is applicable to volume of water consumed over 5,000 cubic metres per year (m3/per year) of such use | - Per cubic metre ($/m3) | $3.4535 | $3.2809 | No |
| 3 | Flat Rate Residential Consumers - Former City of Toronto | Dwelling house rate | Per Room; Per Annum | $73.25; $453.41 Minimum annual charge | $69.59; $430.74 Minimum annual charge | No |
| 4 | Flat Rate Residential Consumers - Former City of Toronto | Rooming house rate | Per Room; Per Annum | $141.69 | $134.61 | No |
| 5 | Flat Rate Residential Consumers - | Basins | Each | $141.69 | $134.61 | No |
| 6 | Flat Rate Residential Consumers - | Baths | Each | $141.69 | $134.61 | No |
| 7 | Flat Rate Residential Consumers - Former City of | Bidets | Each | $141.69 | $134.61 | No |
| 8 | Flat Rate Residential Consumers - Former City of | Saunas connected to water or drains | Each | $141.69 | $134.61 | No |
| 9 | Toronto Flat Rate Residential Consumers - Former City of | Shower baths | Not attached to bath tub - Each | $141.69 | $134.61 | No |
| 10 | Flat Rate Residential Consumers - Former City of | Sinks | Sinks - Each | $141.69 | $134.61 | No |
| 11 | Toronto Flat Rate Residential Consumers - Former City of | Urinals | Self-acting - Each | $168.36 | $159.95 | No |
| 12 | Toronto Flat Rate Residential Consumers - Former City of | Water Closets | Self-acting - Each | $226.28 | $214.97 | No |
| 13 | Flat Rate Residential Consumers - Former City of | Laundry Tubs | For pair of tubs (in one fixture) | $141.69 | $134.61 | No |
|---|---|---|---|---|---|---|
| 14 | Toronto Flat Rate Residential Consumers - Former City of | Laundry Tubs | For single or additional tub - Each | $84.22 | $80.01 | No |
| 15 | Flat Rate Residential Consumers - | Washing Machine | Each | $141.69 | $134.61 | No |
| 16 | Flat Rate Non- Residential Consumers - Former City of | Factories, office buildings, stores, garages, warehouses and similar places of business | Per Flat - Per Annum | $226.13 | $214.83 | No |
| 17 | Flat Rate Non- Residential Consumers - Former City of | Private hospitals, rest homes, schools, fraternity houses, clubs, hotels and similar places | Per Room; Per Annum | $128.63 | $122.20 | No |
| 18 | Flat Rate Non- Residential Consumers - Former City of Toronto | Basins | Each | $281.46 | $267.39 | No |
| 19 | Flat Rate Non- Residential Consumers - | Baths | Each | $281.46 | $267.39 | No |
| 20 | Flat Rate Non- Residential Consumers - Former City of Toronto | Bidets | Each | $281.46 | $267.39 | No |
| 21 | Flat Rate Non- Residential Consumers - Former City of Toronto | Saunas connected to water or drains | Each | $281.46 | $267.39 | No |
| 22 | Flat Rate Non- Residential Consumers - Former City of | Shower Baths | Not attached to bath tub - Each | $281.46 | $267.39 | No |
| 23 | Flat Rate Non- Residential Consumers - Former City of Toronto | Sinks | Each | $281.46 | $267.39 | No |
| 24 | Flat Rate Non- Residential Consumers - Former City of Toronto | Urinals | Self-acting - Each | $336.46 | $319.64 | No |
| 25 | Flat Rate Non- Residential Consumers - Former City of | Water Closets | Self-acting - Each | $450.10 | $427.60 | No |
| 26 | Toronto Flat Rate Non- Residential Consumers - Former City of | Laundry Tubs | For pair of tubs (in one fixture) | $281.46 | $267.39 | No |
| 27 | Toronto Flat Rate Non- Residential Consumers - Former City of | Laundry Tubs | For single or additional tub - Each | $141.69 | $134.61 | No |
| 28 | Toronto Flat Rate Non- Residential Consumers - | Washing Machines | Each | $281.46 | $267.39 | No |
| 29 | Former City of Flat Rate Consumers - Former City of Toronto | Baptistries | Each | $95.07 | $90.32 | No |
| 30 | Flat Rate Consumers - Former City of Toronto | Barber shop or beauty parlour | Each | $281.46 | $267.39 | No |
|---|---|---|---|---|---|---|
| 31 | Flat Rate Consumers - Former City of Toronto | Church buildings used as a place of worship | Each for any such fixture in a church building so used coming within rows 18-30 | Variable | Variable | No |
| 32 | Flat Rate Consumers - Former City of | Dental Fountains | Each | $698.22 | $663.31 | No |
| 33 | Flat Rate Consumers - Former City of Toronto | Commercial dish washers | Each | $560.84 | $532.80 | No |
| 34 | Flat Rate Consumers - Former City of Toronto | Drinking Fountains | Each | $281.46 | $267.39 | No |
| 35 | Flat Rate Consumers - Former City of | Fountains | For 1.6mm orifice or less, each per season | $450.10 | $427.60 | No |
| 36 | Flat Rate Consumers - Former City of Toronto | Fountains | All others, each per person | $1,790.68 | $1,701.15 | No |
| 37 | Flat Rate Consumers - Former City of Toronto | Materials used in buildings or in alterations or repairs to buildings and other construction work | Bricks per 1,000 | $4.78 | $4.55 | No |
| 38 | Flat Rate Consumers - Former City of Toronto | Materials used in buildings or in alterations or repairs to buildings and other construction work | Other masonry, including concrete blocks, tiles, and similar materials, on basis of equivalent number of bricks to replace same, per 1,000 bricks | $4.78 | $4.55 | No |
| 39 | Flat Rate Consumers - Former City of Toronto | Materials used in buildings or in alterations or repairs to buildings and other construction work | Plastering per 1,000 sq. yd | $169.30 | $160.84 | No |
| 40 | Flat Rate Consumers - Former City of Toronto | Materials used in buildings or in alterations or repairs to buildings and other construction work | Per cubic yd - Concrete | $11.72 | $11.14 | No |
| 41 | Flat Rate Consumers - Former City of Toronto | Materials used in buildings or in alterations or repairs to buildings and other construction work | Minimum rate for each building or for repairs or alterations, where any of the above material is | $56.48 | $53.66 | No |
| 42 | Flat Rate Consumers - Former City of | Photographic washing | used tanks Each | $281.46 | $267.39 | No |
| 43 | Flat Rate Consumers - Former City of Toronto | Wash racks | Each | $1,398.40 | $1,328.48 | No |
| 44 | Unmetered Consumers - Former City of Etobicoke | Residential and commercial rates, Flat rate, Single family | Tri-Annual | $462.34 | $439.23 | No |
| 45 | Unmetered Consumers - Former City of Etobicoke | Hydro substations | Tri-Annual | $332.58 | $315.96 | No |
| 46 | Unmetered Consumers Former City Etobicoke | Building water and sewer service rates; not metered up to three months not refundable | Each | $983.58 | $934.41 | No |
|---|---|---|---|---|---|---|
| I | II | III | IV | V | VI | |
|---|---|---|---|---|---|---|
| Ref. No. | Service | Fee Description | Category | Fee Basis | Fee | Annual Adj. |
| 1 | Revenue - Distribution& Collection | Installing 19 mmNew Residential Water Service and Meter | Full Cost Recovery | Flat fee per connection | $5,671.75 | No |
| 2 | Revenue - Distribution& Collection | Installing 25 mmNew Residential Water Service and Meter | Full Cost Recovery | Flat fee per connection | $6,571.85 | No |
| 4 | Revenue - Distribution& Collection | New non-Residential water service of any size or Residential Water Service greater than 25 mm | Full Cost Recovery | Actual Cost per Connection | Variable | No |
| 5 | Revenue - Distribution& Collection | Disconnection Fee for any residential water service less than or equalto25mm | Full Cost Recovery | Flat fee per disconnection | $1,676.86 | No |
| 6 | Revenue - Distribution& Collection | Disconnection of Non- Residential of any size / Residential Water Service greater than 25 mm | Full Cost Recovery | Per Disconnection - Actual Cost | Variable | No |
| 9 | Revenue - Distribution& Collection | Metered water provided to construction sites | City Policy | Consumption per cubic metre | Block 1 Water rate | No |
| 11 | Revenue - Customer & Technical Support | Fire hydrant Permit | Full Cost Recovery | Flat Fee | $212.45 | No |
| 12 | Revenue - Customer & Technical Support | Water meter accuracy test ; Meter less than or equal to 50mm - No Chamber - applied if meter does not over-register | Full Cost Recovery | Flat Fee | $212.45 | No |
| 13 | Revenue - Customer & Technical Support | Water turn off fee for demolition; (disconnection of old water service not included) | Full Cost Recovery | Flat Fee | $106.15 | No |
| 14 | Revenue Services (Finance) | Cost of water consumption from last water meter reading to the date of disconnection of service | Full Cost Recovery | Per Cubic Metre | Block 1 Water rate | No |
| 15 | Revenue - Customer & Technical Support | Water Turn-off or Turn-on | Full Cost Recovery | Each Turn-off or Turn- on | $106.15 | No |
| 15.1 | Revenue - Customer & Technical Support | Single Service call Turn-off and Turn-on within 30 min | Full Cost Recovery | Turn-off and Turn-on Service within 30 min | $106.15 | No |
| 17 | Revenue - Customer & Technical Support | Conduct fire hydrant flow test | Full Cost Recovery | Per Flow Test | $354.14 | No |
| 18 | Revenue - Customer & Technical Support | Unmetered water from each unmetered hydrant- less than or equal to 50 cubic metre | City Policy | Per 50 cubic metre | 50 cubic metre@ Block 1 Water rate | No |
| 19 | Revenue - Customer & Technical Support | Metered water received at hydrant | Full Cost Recovery | Per cubic metre of water | Block 1 Water rate | No |
| 20 | Revenue - Distribution& Collection | Inspection of water at excavation sites in case of dispute | Full Cost Recovery | Actual Cost per Inspection | Variable | No |
| 21 | Revenue - Customer & Technical Support | Unregistered water each day order not complied | Full Cost Recovery | Flat Rate | $70.76 | No |
| 22 | Revenue - Distribution& Collection | Relocate water hydrant | Full Cost Recovery | Actual Cost per Relocation | Variable | No |
|---|---|---|---|---|---|---|
| 23 | Revenue - Distribution& Collection | Replacement of equipment due to damage or loss | Full Cost Recovery | Actual Replacement Costs | Variable | No |
| 24 | Revenue - Customer & Technical Support | Cost of meter, strainer, connection fittings, hardware and flanges | Full Cost Recovery | Actual Cost | Variable | No |
| 25 | Revenue - Customer & Technical Support | Annual Seasonal Meter Activation Fee : includes replacement, removal of water meter; 1 turn on, 1 turn off | Full Cost Recovery | Flat Fee | $272.42 | No |
| 27 | Revenue - Distribution& Collection | Unmetered water - general or use of non-City supplied meter | Full Cost Recovery | Estimated consumption per cubic metre | Block 1 Water rate | No |
| 28 | Revenue - Distribution& Collection | Deposit for estimated cost of service | Full Cost Recovery | Actual Cost | Variable | No |
| 29 | Revenue - Customer & Technical Support | Relocation of Water Meter | Full Cost Recovery | Actual Cost | Variable | No |
| 30 | Revenue - Distribution& Collection | Removal of obstructions around fire hydrants | Full Cost Recovery | Actual Cost | Variable | No |
| 31 | Revenue - Distribution& Collection | Damage to Waterworks | Full Cost Recovery | Actual Cost | Variable | No |
| 32 | Revenue - Distribution& Collection | Reuse of residential water service 19 mmto 25 mm | Full Cost Recovery | Per service to be reused | $353.86 | No |
| 33 | Revenue Services | Administrative fee to reflect a change in ownership on an existing utility account | Full Cost Recovery | Per ownership change | $50.30 | No |
| 35 | Revenue Services | Water Special/Final Reading | Full Cost Recovery | Per Customer Request | $21.55 | No |
| 36 | Revenue Services | Water Consumption Statements | Full Cost Recovery | For One Year | $57.51 | No |
| 37 | Revenue Services | Water Consumption Statements | Full Cost Recovery | For each subsequent year | $35.95 | No |
| 38 | Revenue Services | Returned Cheques | Full Cost | Per NSF Cheque | $46.12 | No |
| 39 | Revenue Services | Water Collection Field Visit | Recovery Full Cost Recovery | Per Field Visit | $35.95 | No |
| 40 | Revenues - Water Infrastructure Management | Administration of MECP Municipal drinking Water Licensing Program | Full Cost Recovery | Per application | $3,203.37 | No |
| 41 | Revenue - Customer & Technical Support | Fee for lost or damaged automated meter reading transmitter | Full Cost Recovery | per location | $119.59 | No |
| 42 | Revenue - Customer & Technical Support | Manual water meter reading fee for consumers with water meters refusing installation of a new automatic water meter and associated meter reading equipment | Full Cost Recovery | Per visit | $108.56 | No |
| 43 | Revenue - Customer & Technical Support | Flat rate legacy fee, in addition to any existing water and wastewater flat rates charged, for residential flat rate consumers who refuse the installation of an automatic water meter and associated meter reading equipment | Full Cost Recovery | Per year | $1,448.06 | No |
| 44 | Revenue - Customer & Technical Support | Processing annual water supply backflow prevention device testing reports | Full Cost Recovery | per report | $66.02 | No |
| 45 | Revenue - Distribution& Collection | Water Service Upgrade Fee - Lead Water Service Replacement Programs (19 mmto25mmupgradeonly) | Full Cost Recovery | Flat fee per connection | $644.85 | No |
| 46 | Revenue - Distribution& Collection | Water Service Upgrade - Lead Water Service Replacement (greater than 25 mm upgrade ) | Full Cost Recovery | Per connection | Actual Cost + 15% administrative fee | No |
|---|---|---|---|---|---|---|
| 47 | Revenue - Distribution& Collection | Metered water received at bulk water fill station(s) | Full Cost Recovery | Per cubic metre of water | Block 1 water rate | No |
| I | II | III | IV | V | VI | |
|---|---|---|---|---|---|---|
| Ref. No. | Service | Fee Description | Category | Fee Basis | Fee | Annual Adj. |
| 1.1 | Revenues - Environment & Administration | Industrial Waste Surcharge Biochemical Oxygen Demand (BOD) or Phenolics (4AAP) | - Full Cost Recovery | Per Kilogram | $0.64 | No |
| 1.2 | Revenues - Environment & Administration | Industrial Waste Surcharge Total Suspended Solids (TSS) | - Full Cost Recovery | Per Kilogram | $0.70 | No |
| 1.3 | Revenues - Environment & Administration | Industrial Waste Surcharge Total Phosphorus (TP) | - Full Cost Recovery | Per Kilogram | $2.24 | No |
| 1.4 | Revenues - Environment & Administration | Industrial Waste Surcharge Total Kjeldahl Nitrogen (TKN) | - Full Cost Recovery | Per Kilogram | $1.43 | No |
| 2 | Revenues - Environment & Administration | Sewer Surcharge on private water | Full Cost Recovery | Per Cubic Metre | 57%of Block 1 Water Rate | No |
| 3 | Revenues - Environment & Administration | Industrial Waste Surcharge Agreement or Permit where the anticipated total fees for one year or lesser term are $ 500 or less calculated in accord with Ref. No. 1.1-1.4 & 2 above, as applicable | Full Cost Recovery | Fixed Fee with Minimum | Calculated in accord with Ref. No. 1.1 - 1.4 above as applicable - $500.00 minimum | No |
| 3.1 | Revenues - Environment & Administration | Sanitary Discharge Agreement or Permit where the anticipated total fees for one year or lesser term are $20,000 or less calculated in accordance with Ref. No. 2 above | Full Cost Recovery | Fixed Fee with Minimum | Calculated in accord with Ref. No. 2 above - $500.00 minimum | No |
| 4 | Revenue - Distribution& Collection | To install new residential sanitary sewer service connection in road allowance | Full Cost Recovery | Per Installation | $14,186.78 | No |
| 5 | Revenue - Distribution& Collection | To install new residential storm sewer service connection in road allowance | Full Cost Recovery | Per Installation | $14,186.78 | No |
| 6 | Revenue - Distribution& Collection | To disconnect residential sanitary sewer service connection in road allowance | Full Cost Recovery | Per Disconnection | $1,750.84 | No |
| 7 | Revenue - Distribution& Collection | To install new sanitary or storm or combined sewer service for industrial, commercial and institutional applicants | Full Cost Recovery | Actual Cost for Installation | Variable | No |
| 8 | Revenue - Distribution& Collection | To Disconnect existing sanitary / storm / combined sewer service connection for industrial, commercial and institutional applicants | Full Cost Recovery | Per Disconnection - Actual Cost | Variable | No |
| 9 | Revenue - Customer & Technical Support | Removal of tree root blockage | Full Cost Recovery | Based on actual cost | Variable | No |
| 10 | Revenue - Customer & Technical Support | Investigation and excavation of drain blockage | Full Cost Recovery | Based on actual cost | Variable | No |
| 11 | Revenue - Distribution& Collection | Spills Clean Up | Full Cost Recovery | Cost + Recovery From Discharger | Variable | No |
|---|---|---|---|---|---|---|
| 12 | Revenue - Distribution& Collection | InstallNew Sanitary or Storm Main in Street Allowance | Full Cost Recovery | Based on actual cost | Variable | No |
| 14 | Revenues - Environment & Administration | Hauled Sewage Discharge Rate | Full Cost Recovery | Per Cubic Metre | $27.86 | No |
| 15 | Revenue - Distribution& Collection | Inspection fee for the reuse of residential City sewer connection up to150mmin diameter | Full Cost Recovery | Per service to be reused | $709.21 | No |
| 16 | Revenues - Water Infrastructure Management | Technical Review by Toronto Water staff - Application to Toronto Water for exemption to permit the construction of a driveway sloped downwards towards a residential | Full Cost Recovery | Per application | $2,125.66 | No |
| 17 | Revenues - Water Infrastructure Management | building. Technical Review by Toronto Water staff - Application to Toronto Water for new connection or change or alteration to the existing storm connection, sanitary or water supply connection | Full Cost Recovery | Per application | $424.85 minimum fee, additional $104.80/hour for each hour after 4 hours to a maximum of $2125.66(Plus HST) | No |
| 18 | Revenues - Water Infrastructure Management | Technical Review by Toronto Water staff - Application to Toronto Water for request to encroach within a City permanent or temporary easement (related to City water and sewer infrastructure) | Full Cost Recovery | Per application | $424.85 minimum fee, additional $104.80/hour for each hour after 4 hours to a maximum of $2125.66(Plus HST) | No |
| 19 | Revenues - Water Infrastructure Management | Technical Review by Toronto Water staff - Application to Toronto Water for request to release from title a City easement (related to City water and sewer infrastructure) | Full Cost Recovery | Per application | $424.85 minimum fee, additional $104.80/hour for each hour after 4 hours to a maximum of $2125.66(Plus HST) | No |
| 20 | Revenues - Environment & Administration | Initial fee for establishment of new industrial waste surcharge agreement | Full Cost Recovery | Per agreement | $1,089.98 | No |
| 21 | Revenues - Water Infrastructure Management | MECP Application Processing: to review new sewer engineering designs | Full Cost Recovery | per application (MECP cost) | $1,100.00 | No |
| 22 | Revenues - Water Infrastructure Management | MECP Application Processing: to review storm and sanitary pump stations, force mains and sanitary sewage detention chambers or oversized sewer designs | Full Cost Recovery | per application (MECP cost) | $2,000.00 | No |
| 23 | Revenues - Water Infrastructure Management | MECP Application Processing: to review stormwater management plans such as retention ponds, underground chamber designs | Full Cost Recovery | per application (MECP cost) | $2,200.00 | No |
| 24 | Revenue - Customer & Technical Support | Record search for Sewers by-law and water supply by- law compliance violation | Full Cost Recovery | per address or per water account | $128.94 | No |
| 26 | Revenue - Distribution& Collection | Closed circuit television inspections of sewage works potentially impacted by private construction in their vicinity, pre- and post- construction | Full Cost Recovery | Actual Cost per Inspection | Variable | No |
| 27 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review sanitary sewers and sanitary forcemains (Form SS1) | Full Cost Recovery | Per application | $4,000.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million or total pipe length exceeds 1 km to a maximum fee of $5,000.00 | No |
|---|---|---|---|---|---|---|
| 28 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review combined sewers and combined sewage storage tanks and structures (Form CS1) | Full Cost Recovery | Per application | $4,000.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million or total pipe length exceeds 1 km to a maximum fee of $5,000.00 | No |
| 29 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review storm sewers, ditches, culverts and storm forcemains (Form SW1) | Full Cost Recovery | Per application | $4,000.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million or total pipe length exceeds 1 km to a maximum fee of $5,000.00 | No |
| 30 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review sewage pumping station (Form SS2) | Full Cost Recovery | Per application | $5,600.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million to a maximum fee of $6,600.00 | No |
| 31 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review stormwater pumping stations (Form SW2) | Full Cost Recovery | Per application | $5,600.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million to a maximum fee of $6,600.00 | No |
| 32 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review stormwater management facilities (Form SW2) Full Cost Recovery | Full Cost Recovery | Per application | $5,600.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million to a maximum fee of $6,600.00 | No |
|---|---|---|---|---|---|---|
| 33 | Revenues - Water Infrastructure Management | Administration of CLI ECA- related application: to process and review third pipe collection system (Form SW3) | Full Cost Recovery | Per application | $4,000.00 minimum fee; additional $1,000.00 when the estimated cost of the proposed works exceeds $4 million or total pipe length exceeds 1 km to a maximum fee of $5,000.00 | No |