Bucket: regassist   Key: v2/targeted-fetch/water/ca/tdf_8d4f4ca90e982e4dac16ed2b5a344f0f/content.md
Source: https://www.canada.ca/content/dam/eccc/documents/pdf/technical_guidelines_environmental_emergency_regulations_2019/technical-guidelines-enviromental-emergency-regulations-2019.pdf

TABLE OF CONTENTS

GLOSSARY........................................................................................................................................ GLOSSARY........................................................................................................................................ 5
1.0 PURPOSE OF THE TECHNICAL GUIDELINES ........................................................................... 7
2.0 ENVIRONMENTAL EMERGENCY AUTHORITIES UNDER PART 8 OF CEPA 1999...................... 9
3.0 BENEFITS OF ENVIRONMENTAL EMERGENCY PLANNING................................................... 10
4.0 THE REGULATIONS -AMIREGULATED?............................................................................ 11
4.1 The Regulations - reporting to ECCC................................................................................ 13
4.1.1 Reporting to ECCC......................................................................................................... 4.1.1 Reporting to ECCC......................................................................................................... 13
4.1.2 What and when do I need to report to ECCC? ............................................................. 4.1.2 What and when do I need to report to ECCC? ............................................................. 13
4.1.3 How to report to ECCC.................................................................................................. 4.1.3 How to report to ECCC.................................................................................................. 14
14
4.1.4 Notices and Reports description................................................................................... 4.1.4 Notices and Reports description................................................................................... 4.1.4 Notices and Reports description...................................................................................
5.0 ENVIRONMENTAL EMERGENCY PLANS .............................................................................. 5.1 Approach to developing a plan......................................................................................... 5.0 ENVIRONMENTAL EMERGENCY PLANS .............................................................................. 5.1 Approach to developing a plan......................................................................................... 17
5.2 Environmental Emergency Plan contents......................................................................... 5.2 Environmental Emergency Plan contents......................................................................... 23
5.3 Exercising an Environmental Emergency Plan.................................................................. 5.3 Exercising an Environmental Emergency Plan.................................................................. 30
5.3.1 Annual simulation exercise........................................................................................... 5.3.1 Annual simulation exercise........................................................................................... 5.3.1 Annual simulation exercise...........................................................................................
5.3.2 Full-scale exercise ......................................................................................................... 5.3.2 Full-scale exercise ......................................................................................................... 5.3.2 Full-scale exercise .........................................................................................................
5.3.3 Record keeping ............................................................................................................. 5.3.3 Record keeping ............................................................................................................. 5.3.3 Record keeping .............................................................................................................
5.4 Public notification ............................................................................................................. 5.4 Public notification ............................................................................................................. 35
36
5.5 Other important considerations in plan development..................................................... 5.5 Other important considerations in plan development..................................................... 5.5 Other important considerations in plan development.....................................................
5.5.2 Existing plan .................................................................................................................. 5.5.2 Existing plan .................................................................................................................. 36
5.5.3 Adequate measures...................................................................................................... 5.5.3 Adequate measures...................................................................................................... 37
37
5.5.4 Location of Environmental Emergency Plan documentation....................................... 5.5.4 Location of Environmental Emergency Plan documentation....................................... 5.5.4 Location of Environmental Emergency Plan documentation.......................................
6.0 NOTIFICATION OF AN ENVIRONMENTAL EMERGENCY....................................................... 6.1 Obligation to report environmental emergencies under CEPA 1999 - Verbal notification.................................................................................................................................... 6.0 NOTIFICATION OF AN ENVIRONMENTAL EMERGENCY....................................................... 6.1 Obligation to report environmental emergencies under CEPA 1999 - Verbal notification.................................................................................................................................... 38
6.1.1 Authority.......................................................................................................................
38
6.1.3 Which substances are required to be reported?.......................................................... 6.1.3 Which substances are required to be reported?.......................................................... 38
6.1.4 Who is responsible to notify? ....................................................................................... 6.1.4 Who is responsible to notify? ....................................................................................... 38
6.1.5 When must verbal notification occur? ......................................................................... 6.1.5 When must verbal notification occur? ......................................................................... 39
6.1.6 How to notify? .............................................................................................................. 6.2 Obligation to report environmental emergencies under CEPA 1999 and the 6.1.6 How to notify? .............................................................................................................. 6.2 Obligation to report environmental emergencies under CEPA 1999 and the 39
Regulations - Written report........................................................................................................ Regulations - Written report........................................................................................................ 39
6.2.1 6.2.1 Authority....................................................................................................................... 39
6.2.2 What 6.2.2 What is a reportable environmental emergency?........................................................ 39
6.2.3 Which substances are to be reported?......................................................................... 6.2.3 Which substances are to be reported?......................................................................... 40
6.2.4 Who is responsible for providing the written report?.................................................. 6.2.4 Who is responsible for providing the written report?.................................................. 40
6.2.5 When must the written report be provided?............................................................... 6.2.5 When must the written report be provided?............................................................... 40
6.2.6 How to report?.............................................................................................................. 6.2.6 How to report?.............................................................................................................. 40
6.2.7 What must be included in a written report?................................................................ 6.2.7 What must be included in a written report?................................................................ 40
6.3 Considerations during an environmental emergency ...................................................... 40 Considerations during an environmental emergency ...................................................... 40
7.0 ACCESS TO INFORMATION FOR PUBLIC SAFETY AUTHORITIES........................................... 42 ACCESS TO INFORMATION FOR PUBLIC SAFETY AUTHORITIES........................................... 42
7.1 Benefits for PSAs............................................................................................................... 42 Benefits for PSAs............................................................................................................... 42
8.0 COMPLIANCE AND ENFORCEMENT.................................................................................... 43 COMPLIANCE AND ENFORCEMENT.................................................................................... 43
8.1 Investigation of possible non-compliance........................................................................ 43 Investigation of possible non-compliance........................................................................ 43
9.0 SUMMARY OF THE RISK EVALUATION FRAMEWORK.......................................................... 45 SUMMARY OF THE RISK EVALUATION FRAMEWORK.......................................................... 45
APPENDIX 1.................................................................................................................................... 46 Suggested References for Environmental Emergencies Prevention, Preparedness and APPENDIX 1.................................................................................................................................... 46 Suggested References for Environmental Emergencies Prevention, Preparedness and APPENDIX 1.................................................................................................................................... 46 Suggested References for Environmental Emergencies Prevention, Preparedness and
Response Measures, and the Development of Environmental Emergency Plans ....................... 46 Response Measures, and the Development of Environmental Emergency Plans ....................... 46 Response Measures, and the Development of Environmental Emergency Plans ....................... 46
APPENDIX 2.................................................................................................................................... 50 APPENDIX 2.................................................................................................................................... 50 APPENDIX 2.................................................................................................................................... 50
Regional Contact Information for the Regulations....................................................................... 50 Regional Contact Information for the Regulations....................................................................... 50 Regional Contact Information for the Regulations....................................................................... 50
APPENDIX 3.................................................................................................................................... 54 APPENDIX 3.................................................................................................................................... 54 APPENDIX 3.................................................................................................................................... 54
Determination of Container Capacity and Substance Quantity ................................................... 54 Determination of Container Capacity and Substance Quantity ................................................... 54 Determination of Container Capacity and Substance Quantity ................................................... 54
APPENDIX 4.................................................................................................................................... 91 APPENDIX 4.................................................................................................................................... 91 APPENDIX 4.................................................................................................................................... 91
Additional Guidance on Certain Exclusions .................................................................................. 91 Additional Guidance on Certain Exclusions .................................................................................. 91 Additional Guidance on Certain Exclusions .................................................................................. 91
APPENDIX 5.................................................................................................................................... 94 APPENDIX 5.................................................................................................................................... 94 APPENDIX 5.................................................................................................................................... 94
Checklist to Prepare an Environmental Emergency Plan ............................................................. 94 Checklist to Prepare an Environmental Emergency Plan ............................................................. 94 Checklist to Prepare an Environmental Emergency Plan ............................................................. 94
APPENDIX 6.................................................................................................................................. 105 APPENDIX 6.................................................................................................................................. 105 APPENDIX 6.................................................................................................................................. 105
Suggested Endpoints for the Regulations................................................................................... 105 Suggested Endpoints for the Regulations................................................................................... 105 Suggested Endpoints for the Regulations................................................................................... 105
REFERENCES ................................................................................................................................ 115 REFERENCES ................................................................................................................................ 115 REFERENCES ................................................................................................................................ 115

GLOSSARY

Alternative scenario Means an environmental emergency that could reasonably be expected to occur at the facility and has the longest impact distance outside the facility boundary. Typically, alternative scenarios have a higher chance of occurring than the worst-case scenario.
CAS registry number Means the identification number assigned to a substance by the Chemical Abstracts Service, a division of the American Chemical Society.
CEPA 1999 Means the Canadian Environmental Protection Act, 1999 .
Container system Means any receptacle or network of receptacles that is used to contain a substance-including any connected pipelines or piping-except any part of that network that is automatically or remotely segregated from the rest of the network by shut-off valves, or other mechanisms in the event of any environmental emergency.
E2 Environmental emergency.
ECCC Environment and Climate Change Canada.
Environmental emergency Section 193 of CEPA 1999 defines an environmental emergency as (a)an uncontrolled, unplanned or accidental release, or release in contravention of regulations or interim orders made under this Part [Part 8 of CEPA 1999], of a substance into the environment; or (b) the reasonable likelihood of such a release into the environment.
Facility Means a property on which one or more fixed onshore installations are located and where a substance is present.
Full-scale simulation exercise Means an action-based simulation exercise requiring the deployment of personnel, resources and equipment.
Maximum capacity Means in respect of a container system, its full physical capacity, expressed in tonnes, including any capacity
that is beyond the safe-fill limit set by the manufacturer of the receptacles that compromise the container system.
Mixture Means a combination of two or more substances where the substances retain their individual substance properties so that no reaction between them occurs. For the purposes of the Regulations, a mixture can include one or more Schedule 1 substances.
PID Piping and Instrumentation Diagram.
Regulatee Facility that meets the requirements of the Regulations.
Regulations Environmental Emergency Regulations, 2019.
Responsible person Means any person who owns or has the charge, management or control of a substance that is located at a facility.
SDS Safety Data Sheet.
Simulation exercise Means an exercise simulating the response to an environmental emergency involving the release of a substance.
Worst-case scenario Means a reasonable scenario that involves the total quantity of an E2 substance contained in the largest container system or of the total quantity on-site that is not contained.

1.0 PURPOSE OF THE TECHNICAL GUIDELINES

The Technical Guidelines for the Environmental Emergency Regulations, 2019 (the E2 Technical Guidelines 2019) are intended for the use of any person 1 who owns or has the charge, management or control of a substance listed in Schedule 1 of the Environmental Emergency Regulations, 2019 (the Regulations).

The E2 Technical Guidelines 2019 are designed to help you, as a regulatee, better understand what the requirements of the Regulations are and how to comply with them. This document will provide clarification and guidance on important questions such as the following.

Other helpful information is provided in tables, figures and references, located mostly in the appendices below:

IMPORTANT: The Technical Implementation Guidelines 2019 are intended to provide contextual information on the Regulations, 2019, as amended in 2011 and the Canadian Environmental Protection Act, 1999 (CEPA 1999.). They do not replace CEPA 1999 or the Regulations, 2019. Regulatees should refer to CEPA 1999 at http://lawslois.justice.gc.ca/eng/acts/C-15.31/ and the Regulations at canada.ca/environmentalemergency-regulations to ensure they are in compliance with the law. Some provisions

  1. The term 'person' may refer to a company, an individual or a government body.

of CEPA 1999 and the Regulations have been quoted for convenience of reference only and have no official sanction. Should any inconsistencies be found between the Technical Guidelines 2019 and CEPA 1999 or the Regulations, CEPA 1999 and the Regulations will prevail.

2.0 ENVIRONMENTAL EMERGENCY AUTHORITIES UNDER PART 8 OF CEPA 1999

This section provides information on the authorities granted under CEPA 1999, and under the Regulations.

The goal of the Government of Canada is to achieve 'the highest level of environmental quality for all Canadians,' as stated in the Preamble to CEPA 1999, paragraph 2(1)(a . 1), also requires the Government of Canada to 'take preventive and remedial measures to protect, enhance and restore the environment.'

Part 8 of CEPA 1999 on environmental emergencies (sections 193 to 205) provides various authorities to address the prevention of, preparedness for, response to and recovery from environmental emergencies caused by uncontrolled, unplanned or accidental releases, and to reduce any foreseeable likelihood of releases of toxic or other hazardous substances listed in Schedule 1 of the Regulations.

In investigating various measures to increase the safety and security of Canadians in the event of an environmental emergency, the Government of Canada has identified sections 199, 200 and 200.1 of Part 8 as important tools. These sections allow the Government of Canada to require the preparation of environmental emergency plans (E2 plans) for toxic or other hazardous substances. The primary objective for requiring environmental emergency planning is to have the appropriate risk management practices adopted and implemented to reduce the potential risks associated with the manufacture, storage and use of toxic and other hazardous substances in Canada.

Schedule 1 of the Regulations contains lists of substances (Part 1) and solutions (Part 2) that, should they enter the environment as a result of an environmental emergency, may be harmful to the environment, its biological diversity or human life or health. Minimum quantities and concentrations have been established for these substances at or above which the Minister may require notice of identification of the substance and place, as well as preparation and implementation of E2 plans under the Regulations.

There are strict penalties for failing to comply with the provisions of CEPA 1999 or its regulations. In sections 272 to 274, Part 10 (Enforcement) outlines various offences and penalties for contraventions of provisions of CEPA 1999 or its regulations, for knowingly or negligently providing false or misleading information, or for causing intentional or reckless damage to the environment or showing wanton or reckless disregard for the lives or safety of other persons and leading to the risk of death or harm to persons.

3.0 BENEFITS OF ENVIRONMENTAL EMERGENCY PLANNING

Environmental emergency planning is not just about compliance with the Regulations. For today's modern enterprise, effective planning for emergency events is an essential part of good business management.

When E2 planning is properly developed and implemented, benefits to the environment, human health and industry ensue. An industry-wide study 2 conducted by the Center for Chemical Process Safety (CCPS) of the American Institute of Chemical Engineers confirms that E2 planning provides measurable benefits by

E2 planning also provides non-measurable benefits by

An important step in E2 planning is the analysis of all kinds of risks found during the handling, storage, production process use or disposal of any hazardous materials. When the proper measures to eliminate or mitigate these risks are implemented, other benefits follow:

2 CCPS Business Case Study: https://www.aiche.org/ccps/resources/publications/summaries/business-case-processsafety

4.0 THE REGULATIONS - AM I REGULATED?

This section is designed to help you determine whether the Regulations apply to a particular facility. Depending on the situation, the Regulations, may not apply to a specific facility, while in other cases, the facility may be subject to one or multiple requirements of the regulations.

The figure below is a quick reference diagram of the Regulations to help determine if and how a facility is subject to the Regulations and the steps that need to be followed when they apply. The following questions need answers before consulting and following the steps in Figure 1:

  1. Is the substance (Part 1) or solution (Part 2) listed in Schedule 1 by a CAS number in column 1 and by name in column 2?
  2. a. If yes, then proceed to Step 2 in Figure 1.
  3. b. If no, then proceed to the next question below.
  4. Is a mixture present that has not been identified by a CAS number?
  5. a. If yes, then the constituents of the mixture need to be assessed to explain the concentration and proportion of the substances it contains. Once the ingredients of the mixture are understood, proceed to Step 1 in Figure 1 to determine if it contains one or more substances that are subject to the Regulations.
  6. b. If no, then proceed to the next question.
  7. Is the substance identified by a CAS number that is not in Schedule 1?
  8. If yes, then consult the material safety data sheet (MSDS) or safety data sheet (SDS) for the substance to determine if it contains one or more substances listed by a CAS number in column 1 and a name in column 2 of Schedule 1.
  9. If a substance from Schedule 1 is present and the concentration is known, note the concentration and proceed to Step 2 in Figure 1 to determine if and how the Regulations apply.
  10. If a substance from Schedule 1 is present and the exact concentration is not known, use the upper range of concentration by weight that is listed for the substance as the regulated substance's concentration and as the proportion of the regulated substance within the substance. Once the regulated substance(s) is/are identified by CAS and name and the concentration is known, proceed to Step 2 in Figure 1 to determine if and how the Regulations apply.
  11. If a substance from Schedule 1 is not present and all the previous questions have been answered negative, then the substance, mixture or solution is not subject to the Regulations.

NOTE: The flow chart covers the most commonly used schedules. Not all schedules are included in Figure 1. Other schedules may apply to a facility that is required to have an E2 plan. Please consult section 4.1.1 to see a full list of schedules.

Environmental Emergency Regulations, 2019 - Quick Reference

4.1 The Regulations - reporting to ECCC

This section is designed to help you determine what, when and how to submit information to Environment and Climate Change Canada (ECCC). Depending on the situation, the Regulations may not apply to a specific facility, while in other cases the facility may be subject to one or multiple reporting requirements of the Regulations.

4.1.1 Reporting to ECCC

The Regulations require that the information be provided to ECCC through a notice submission. This information allows the Department to fulfil its mandate by keeping a record of potential risks to the environment and human health within Canada as identified in CEPA 1999.

IMPORTANT: Do you own several facilities? You must submit separate notices and Do you own several facilities?

reports for each facility. You must submit separate notices and keep separate records for each facility.

4.1.2 What and when do I need to report to ECCC?

The following table provides a list of all schedules that may need to be provided to ECCC, the information they are meant to contain along with their required timelines.

Schedule Notice Time for Notifying
Schedule 2 Notice Regarding Substance Located at Facility Within 90 days of meeting or exceeding the specific threshold, and every 5 years thereafter; and
Schedule 2 Notice Regarding Substance Located at Facility Within 60 days after the reported company information has changed or either of the maximum expected quantity or maximum capacity has increased by 10% or more
Schedule 3 Notice Regarding the Preparation of an Environmental Emergency Plan Within 6 months of meeting or exceeding both the substance quantity and container capacity thresholds or only the quantity threshold for a substance that is not in a container system
Schedule 4 Notice Regarding the Bringing into Effect of an Environmental Emergency Plan Within 12 months of meeting or exceeding both the substance quantity and container capacity thresholds or only the quantity threshold for a substance that is not in a container system
Schedule 5 Notice Regarding Simulation Exercises Conducted in Relation to an Environmental Emergency Plan Within 5 years after the day on which the E2 plan is brought into effect, and every 5 years thereafter
Schedule 6 Notice Regarding a Change in Quantity or Capacity Within 60 days after the end of a 12-month period during which the threshold is no longer met
Schedule 7 Notice of Cessation of Operation Within 30 days before the day on which the operations are to cease, or as soon as feasible in the case of extraordinary circumstances
Schedule 7 or Transfer of Operation On or before the date of transfer
Schedule 8 Information to Be Included in the Written Report of Environmental Emergency As soon as possible in the case of 1. an environmental emergency involving the release of a hazardous substance that a. has or may have an immediate or long-term harmful effect on the environment, or b. constitutes or may constitute a danger to the environment on which human life depends, or c. constitutes or may constitute a danger in Canada to human life or health 2. The reasonable likelihood of an occurrence of an environmental emergency

4.1.3 How to report to ECCC

In order to help regulatees with reporting under the Regulations, ECCC has developed an E2 Regulations Reporting System which is accessed through ECCC's Single Window Information Management (SWIM) system.

The system represents a modern and convenient way to submit and update information related to regulated facilities, hazardous substance(s) and environmental emergency planning. It also sends email reminders to registered regulatees to inform them of deadlines for the submission of schedule. Furthermore, the system acts as a mechanism for regulatees to submit electronic written reports when an environmental emergency occurs with a substance that is subject to the Regulations.

For detailed step-by-step guidance on how to navigate ECCC's Single Window Information Management system and operate the Environmental Emergency Regulations Reporting System, please visit the following link: https://www.canada.ca/en/environmentclimate-change/services/environmental-emergencies-program.html.

4.1.4 Notices and Reports description

E2 regulatees may be required to submit different types of notices and reports to ECCC. An explanation of each is provided below.

Schedule 2: Notice Regarding Substance Located at a Facility

Regulatees are required to identify the name and location of the facility, the range that reflects the maximum number of employees working at the facility, the person responsible for the E2 plan, contacts at the facility with knowledge of the plan, and details for each of the E2 regulated substances at the site, including their concentration, maximum expected

quantity and, if applicable, the capacity of the largest container system in which the substance resides. Not all facilities that are required to provide a Schedule 2 for a particular substance need to prepare an E2 plan. They must, however, report releases of a regulated substance that meet or exceed the requirements set out in subsection 18(1) of the Regulations (See Schedule 8).

Schedule 2 will need to be edited and resubmitted if there are changes to the facility information or substance stored (i.e. substances added or 10% increase to quantity and or capacity of existing substances).

Please note that a Schedule 2 will need to be resubmitted every five years.

Schedule 3: Notice Regarding the Preparation of an Environmental Emergency Plan

Submission of Schedule 3 informs ECCC that the facility has finished developing an E2 plan for a particular substance. Details such as the plan's origin, local authorities and local community or interest groups that contributed to the plan, the date the plan was prepared, the predicted impact distances and, if applicable, a description of the area around the facility that may be impacted by an environmental emergency are included in the Schedule 3 submission.

Schedule 4: Notice Regarding the Bringing Into Effect of an Environmental Emergency Plan

Submission of Schedule 4 provides ECCC with the date on which an E2 plan is complete and ready to be used in the event of an environmental emergency at the facility.

Schedule 5: Notice Regarding Simulation Exercises Conducted in Relation to an Environmental Emergency Plan

Submission of Schedule 5 informs ECCC that the E2 plan has been through a full-scale exercise. At submission, confirmation is also required to indicate that the annual simulation exercises were conducted.

Schedule 6: Notice Regarding a Change in Quantity or Capacity

Submission of Schedule 6 informs ECCC that the facility has a quantity of the substance capacity of the container system under its specific thresholds for a period of one year or more.

Schedule 7: Notice of Cessation of Operations or Transfer of Ownership

Submission of Schedule 7 informs ECCC that either the facility will stop its operation for one year or more, for reasons other than maintenance, or the date on which ownership of the facility changed and the name of the new owner.

Schedule 8: Information to Be Included in the Written Report of Environmental Emergency

Submission of Schedule 8 informs ECCC that an environmental emergency involving a chemical that meets the definition of a substance in the Regulations has occurred. The release of a regulated substance must be reported if it meets at least one of the following criteria:

  1. Has or may have an immediate or long-term harmful effect on the environment;
  2. Constitutes or may constitute a danger to the environment on which human life depends; or
  3. Constitutes or may constitute a danger in Canada to human life or health.

Protecting Confidential Information

In accordance with section 313 of CEPA 1999, any person submitting information to the Minister under CEPA 1999 is entitled to submit, with their information, a written request that the information be treated as confidential. Information for which a request for confidentiality has been made will not be disclosed by the Minister except in accordance with section 315, 316 or 317 of CEPA 1999.

5.0 ENVIRONMENTAL EMERGENCY PLANS

This section will explain the requirements of an E2 plan and help you determine if your facility has to prepare one under the Regulations.

NOTE: Even if your facility does not meet the criteria for creating an E2 plan, ECCC strongly recommends that you create an emergency plan voluntarily to protect people, the environment and property.

Who Should Prepare an E2 plan?

An E2 plan is required of any person who owns or has the charge, management or control of any of the regulated substances under certain conditions. To see if you are required to prepare, implement and carry out an E2 plan, refer to Chapter 4.

5.1 Approach to developing a plan

The purpose of emergency planning is to reduce and/or eliminate the risks of natural or human-induced disasters for human life and the environment.

E2 plans should integrate all relevant aspects of risk management. Undesirable events such as the release of hazardous substances could occur as a result of process, procedure or equipment failures. E2 plans should account for these scenarios by providing proactive identification, assessment and mitigation measures.

A risk assessment conducted at a facility will

  1. Identify multiple scenarios that could occur that would lead to the release of the substance from the facility;
  2. Assess the probability of such scenarios occurring;
  3. Predict the impact distances from the scenarios for each substance; and
  4. Describe the consequences of each scenario on human health and the environment.

The impact distance in the Regulations reflects the radius of the impact zone inside which the consequences for human health and the environment are unacceptable (see Appendix 6 for a description of the endpoints we recommend be used to determine impact distances for the various hazard classes that have been assigned to the substances that are subject to the Regulations).

Prevention, preparedness, response and recovery are the four main pillars involved in E2 plan development. Below are some general concepts associated with each of these main pillars.

Prevention

Environmental emergencies can be averted or their severity limited by identifying in advance the cause of their probable frequency, potential consequences and impacts.

Preventing environmental emergencies begins with evaluating the risks associated with the regulated substance(s) stored at the facility. Studying past spill events at the regulatee's site and at similar sites in Canada allows for a more accurate prediction of the range of potential scenarios, including worst-case scenarios. This understanding is critical to assessing a facility's capabilities and resources for dealing with a crisis.

The consequences of an accidental release is addressed through both active and passive mitigation. Active mitigation requires power or human intervention whereas passive mitigation does not and active mitigation is intended to function on its own without any external assistance. The use of water curtains around process vessels to knock down harmful atmospheric releases is an example of active mitigation. In contrast, passive mitigation includes spill containment, such as dykes and catch basins, around tanks. The frequency of accidental releases can be controlled through standard operating procedures and management systems that consider process design and operation. Other examples of prevention include protection of propane tanks via concrete blocks, checking piping that is concealed under insulation for potential corrosion and knowing the shelf life of equipment and for battery replacement.

Success Stories - Industry Prevention

Prevention is essential for reducing the frequency and severity of environmental emergencies. Through preventive actions, problems can be anticipated, corrective actions taken and risks managed to avoid environmental damage. The most effective risk management practices combine prevention activities with appropriate preparedness and response. Analyses of insurance claims show that implementing an appropriate risk management program (RMP) in advance is far less expensive than dealing with the human health problems and environmental damage in the area surrounding a facility following an emergency.

Prevention refers not only to mitigation measures such as maintenance, preventing corrosion, installing the appropriate valve specification and spill containment; it also refers to the management systems used for process design and operation, training and facility operation.

To prevent process-related injuries and accidents, many process industries in Canada use chemical process safety management (PSM). PSM is the application of management principles and systems for the identification, understanding, avoidance and control of process hazards to prevent, mitigate, prepare for, respond to and recover from processrelated incidents.

In Canada, the first edition of the CSA Z767-17 standard on PSM was published in 2017. The CSA Standard identifies the requirements of a PSM system for facilities and worksites handling or storing materials that are potentially hazardous, either due to an inherent chemical, biological, toxicological or physical property of those materials, or due to the material's potential or kinetic energy.

There are four foundational pillars for PSM outlined in the CSA Z767-17 Process Safety Management Standard:

Each of the pillars contains a number of elements. The 16 PSM elements under the CSA Z767-17 Standard are:

The CSA Z767-17 Standard indicates that all PSM pillars and their respective requirements should be met when developing a PSM approach and that the Plan-DoCheck-Act continuous improvement model be followed as well.

The CAN/CSA-Z767-17 Process Safety Management Standard also recommends that when developing a PSM program, organizations should ensure that their policies, practices, and procedures strive to align with the principles of inherent safety, which can result in a reduction in the number, complexity and severity of hazards that need to be managed, without transferring the risk elsewhere. CAN/CSA-Z767-17 defines inherent safety as the concept that incorporates safety as part of the fundamental design of a process rather than through employing additional safeguards. The four main principles associated with inherent safety are the following:

Preparedness

In preparing an E2 plan, it is important to involve key people, particularly first responders and representatives of potentially affected stakeholder groups in and around a regulatee's facility. Such consultation enhances the level and effectiveness of preparedness.

When preparing the E2 plan, you should resolve identified gaps, consider options such as upgrading equipment, expanding staff, and increasing communication with and among neighbouring facilities, community officials, public safety agencies, etc. The communication of risk to surrounding communities is an important component of both prevention and preparedness activities.

Success Stories - Industry Preparedness

Ensuring public safety during and following an environmental emergency is an important component of preparedness. In preparing an E2 plan, therefore, it is critical that you communicate the plan to members of the public so that they know what to do in an environmental emergency. Communication of this nature can help dispel undue community fears over imagined risks that are not present, and reassure people that any real risks that are present are under proper control.

A regulatee must identify and include reference in their plan to adequate training and resources to enable responders to respond to potential emergencies. Preparedness planning should reveal, depending on the significance and possible escalating nature of particular events, a facility's capabilities and resources to effectively respond to an event adequately.

Resources and equipment could be obtained through arrangements or mutual aid agreements with other industries and outside agencies. Under mutual aid agreements, organizations that lack the resources to respond effectively to emergencies on their own can collaborate with other companies to the mutual benefit of all parties. Various types of mutual aid agreements exist. They can involve companies in the same vicinity or, where the distance between an accident location and the party responsible for responding is considerable, in the same local region. These agreements can be effective in improving response, reducing costs and administrative burdens, and avoiding overlap and duplication. Please be advised that simulation exercises conducted at a different facility under a mutual aid agreement will not comply with the Regulations. See Section 5.3 for more information.

Preparedness measures should identify all activities essential to ensuring a high degree of readiness for a prompt and effective response to an environmental emergency. Testing the preparedness of a facility's resources and equipment to manage and reduce the severity of such events can be achieved through exercises and focused training for key

personnel who are tasked with responding to environmental emergencies at a facility. Equipment needed during an emergency should be readily available and regularly maintained and tested. An inventory of equipment currently available on and off site, along with the quantity and location, must be included in the plan and made accessible to responders.

An E2 plan must be tested and updated annually so that changes within the facility are integrated into the plan. By implementing effective prevention measures (such as risk management programs that address all probable emergency situations), persons preparing and implementing an E2 plan can determine the necessary level of preparedness for each situation. Updating an E2 plan annually involves more than checking telephone numbers: it considers any changes in the process or substances, any new level of toxicity hazard, any new development in the software used, etc. The public should be informed about these updates when they are relevant to the protective actions they should take in the event of an emergency.

Response

Response to an environmental emergency is intended to include all aspects of managing the emergency situation until the emergency phase of the event is considered over. These needs can vary greatly in scope, depending on the nature and magnitude of the emergency.

Effective emergency response includes, but is not limited to, the following:

Quick and effective response relies on sound planning and pre-established partnerships. Effective emergency response calls for co-operation between industries, communities, local organizations and government through partnerships formed before emergencies occur. Such partnerships can be strengthened through the regular testing of the E2 plan with all of those involved. Communication from the facility to off-site agencies, to the public and among responders is important and necessary for a coordinated and successful response effort.

Recovery

Recovery of an environmental emergency is more than just the recovery of the spilled product. Recovery refers to the restoration of any part of the environment damaged by or during the emergency. Recovery affects both the operating entity itself and the surrounding community. The issue of recovery is best managed through discussions

among all involved parties to assess the damage and agree on a restoration plan. The level of environmental restoration is determined by many factors, such as the size, persistence and toxicity, or hazardous nature of a release. Recovery of an area to its natural state is not always possible. Thus, restoration plans are situation-specific and would need to be defined in terms of acceptability to affected stakeholders.

The regulatee, in consultation with public authorities, should initiate recovery processes as soon as possible, striving for a rapid recovery from environmental damage. Those leading the recovery effort must be aware that rapid response without assessing the risks associated with the recovery effort can lead to increased damage and longer recovery times for the environment. The recovery process can either begin during response or can be initiated in stages until normal operations are restored. Planning for the recovery phase during preparedness phase will improve recovery time and reduce impacts on the environment.

5.2 Environmental Emergency Plan contents

The Regulations set out the required elements that regulatees need to include in an E2 plan, but the Regulations do not prescribe the methodology to be used.

Subsection 4(2) of the Regulations requires an E2 plan prepared under the Regulations to include the following elements:

A good source for this information would be a safety data sheet (SDS) from the supplier. Examples of properties and characteristics are as follows:

The maximum expected quantity should match up with the quantity submitted in the Schedule 2 notice that was submitted for the facility.

This requires describing what the substance is used for on-site (stored, produced, reacted, used as a refrigerant, etc.). If the substance is used within a larger system, the facility may wish to also represent that system in a figure (see figure 2 below). This diagram as well as a description of the activity in which the substance is involved will better describe the use of the substance on-site.

Example: XYZ Cold Storage is a cold storage facility that operates mechanical compression refrigeration systems. Anhydrous ammonia is used as the refrigerant and is handled in a closed loop.

Both the facility and the surrounding area that could be impacted by an environmental emergency need to be described. Some recommendations for both are provided below:

Facility description

The facility may provide

Providing a facility map detailing the layout of the facility may also fulfil the requirements of 4(2)(o).

Area surrounding facility description

Sensitive receptors in the surrounding area that need to be identified and reported are not limited to the list provided in paragraph 4(2)(c) of the Regulations. The examples provided should be included if present; however, other sensitive receptors such as child care, senior citizen and long-term care facilities; public camping facilities; water bodies; wetlands; etc. should also be described if relevant.

The facility may provide maps or a table with distances to the different receptors similar to the following example.

Receptors Potential Impact Distance (m) Contact Information
Residential Area Public Safety 400 12 Maple Lane Ottawa, Ontario 123-456-7890 Contact: Mr. Rideau
Commercial Area Public Safety 300 345 Commercial Road Ottawa, Ontario 456-789-0123 Contact: Ms. Boulanger
Industrial Area Public Safety 700 6 Industrial Avenue Ottawa, Ontario 789-012-3456 Contact: Mr. Parker
New District School Public Safety 800 789 Learning Road Ottawa, Ontario 147-258-0369 Contact: Ms. Granger
123 Highway Transportation and Infrastructure 200 N/A
Clear River Environmental 300 N/A
City Park Environmental 500 N/A

The facility should identify any environmental emergencies that could reasonably be expected to occur at the facility. A 'reasonable' scenario is a scenario that may realistically happen on-site. Typically, alternative scenarios have a higher chance of occurring than the worst-case scenario, which has a lower probability of occurrence with higher consequences. The alternative scenario chosen for an exercise would have the longest impact distance outside the boundary of the facility. Appendix 6 include some suggested the endpoints that can be used to determine impact distance.

Use of a risk analysis approach is recommended to help reduce the probability that an environmental emergency involving an E2 substance will occur. This approach will help reduce or minimize the consequences arising from an environmental emergency, highlight existing preventive or protection barriers and identify whether additional safety barrier or risk control measures should be added to manage any residual risks.

The steps involved in risk analysis (adapted from CRAIM, 2017) include

The facility should identify the harm from a reasonable scenario that may involve the total quantity of an E2 substance contained in the largest container system or of the total quantity on-site that is not contained. In the context of the Regulations, this scenario is referred to as the 'worst-case scenario'.

An example of a quantity not contained could be an explosion involving the total quantity of ammonium nitrate that is stored in a pile on the ground.

boundary of the facility;

The facility should identify the harm from alternative scenarios that would have an impact outside the limits of the facility site boundary, including the one that would have the longest impact distance outside the site boundary. Alternative scenarios usually involve the release of lesser quantities of the regulated substance(s) and/or the release of the total quantity with longer release time than in the worst-case scenario. These scenarios should take into account domino effects.

Examples of possible alternative release scenarios include, but are not limited to, the following:

Please refer to Appendix 6 - Suggested Endpoints. It provides examples of endpoints that can be used to measure harm.

The facility should describe the preventive measures that will be implemented for every scenario identified in the E2 plan and how planning will enhance preparedness for, response to and recovery from the scenarios that have been identified.

The list should include the position titles, roles and responsibilities of the person(s) that will be involved in carrying out the E2 plan in the event of an environmental emergency on-site. ECCC recommends that you identify alternates for those who would carry out the E2 plan in case of absence/shift change, etc.

The facility is responsible for ensuring the readiness and expertise of their personnel required to activate the E2 plan. An example of a training list is provided below.

POSITION TRAINING DATE RENEWAL
Emergency Response Coordinator (ERC) E2 Emergency Plan - Awareness Workshop YYYY-MM-DD Upon Hire (N/A)
Emergency Response Coordinator (ERC) E2 Emergency Plan - Tabletop Exercise YYYY-MM-DD X Year(s)
Emergency Response Coordinator (ERC) E2 Emergency Plan - Full Simulation YYYY-MM-DD X Year(s)
Emergency Response Coordinator (ERC) ICS (100, 200, 300, 400) YYYY-MM-DD X Year(s)
Communications Officer (CO) Media Relations Training YYYY-MM-DD X Year(s)
Communications Officer (CO) Public Relations Training YYYY-MM-DD X Year(s)
Safety Officer (SO) Occupational Health and Safety Training YYYY-MM-DD X Year(s)
Safety Officer (SO) Public Safety Training YYYY-MM-DD X Year(s)
Response Officer (RO) NFPA 600 Industrial Fire Brigade Standards Training Courses YYYY-MM-DD X Year(s)
Response Officer (RO) H2S Alive YYYY-MM-DD X Year(s)
Response Officer (RO) First Aid YYYY-MM-DD X Year(s)
Response Officer (RO) Fire Awareness Training YYYY-MM-DD X Year(s)
Response Officer (RO) Hazardous Material Training YYYY-MM-DD X Year(s)
Response Officer (RO) Flammable Liquids Training YYYY-MM-DD X Year(s)
Response Officer (RO) Transportation of Dangerous Goods YYYY-MM-DD X Year(s)
Response Officer (RO) WHMIS YYYY-MM-DD X Year(s)
Response Officer (RO) ERP Live Exercises YYYY-MM-DD X Year(s)
Response Officer (RO) Annual Fit Testing YYYY-MM-DD X Year(s)
Response Officer (RO) Product Transfer YYYY-MM-DD X Year(s)
Response Officer (RO) Grounding & Bonding YYYY-MM-DD X Year(s)
Response Officer (RO) Gas Detection YYYY-MM-DD X Year(s)

The equipment must be readily accessible and specifically for use in response to the environmental emergency scenarios that have been developed for the substances at the facility. The equipment must also be ready to use and properly maintained.

Key considerations

Ensure that detectors are placed appropriately. Do not place detectors that are designed to monitor a potential leak of a dense inhalation vapour high up on the wall. Do not place detectors near ventilation shafts, where in the event of an inhalation leak, most of the vapours will be drawn out of the building before the detector is able to sound alarm of a potential leak. When installing a detector within an enclosure of hazardous substances, ensure that a person will know if there is a leak within the enclosure before the door to the enclosure is opened.

Please refer to Notification Section 5.4 for further information.

Please refer to Public Notification Section 5.4 for further information.

Please refer to Public Notification Section 5.4 for further information.

Please refer to Public Notification Section 5.4 for further information.

A list of references is provided in Appendix 1 and may be used when preparing an E2 plan. The references cover prevention, preparedness, response and recovery. A checklist is provided in Appendix 5 with details for preparing an E2 plan.

Contractor Services

If the facility is hiring a contractor to provide emergency response services, the facility is still responsible for the quality of the training, equipment and response capabilities of the contractor.

The responsible person is ultimately liable for compliance with the Regulations.

5.3 Exercising an Environmental Emergency Plan

Environmental emergency exercises involve a simulation relating to an emergency that can reasonably be expected to occur with substance(s) at the facility that are subject to the Regulations. The simulations are meant to explore, learn from and prepare for scenarios described within the E2 plan that potentially have harmful effects on the environment or human life or health. Exercising the E2 plan provides those who are responsible for the plan with valuable information regarding the facility's readiness to respond to one or multiple elements of their plan. Any lessons learned via the exercise can be used to update and improve the plan.

Technical Guidelines for the Environmental Emergency Regulations, 2019

The Regulations require that E2 plans be exercised on an annual basis. A full-scale exercise must also be conducted every five years. Based on these exercises, the E2 plans must be reviewed and updated, as required. The responsible person is required to keep a record of the results of these annual and full-scale simulation exercises, including the date and summary of the exercise, the results of the exercise and any modifications made to the plan as a result. ECCC recommends an Appendix be placed within the E2 plan to record this information so it can be presented for inspection upon request.

A responsible person must review and update the E2 plan as needed. A record of the review and the date it was reviewed should be maintained for at least seven years beginning on the day the record is made. The plan must be readily available in the event of any type of emergency.

ECCC recommends that an appropriate exercise design process be composed of the following four main steps:

  1. planning the annual exercise;
  2. conducting the exercise;
  3. evaluating and reporting on the outcomes; and
  4. correcting and updating the E2 plan with lessons learned.

The main objective is to ensure that all aspects of the plan are fully evaluated over the five-year testing cycle. Further information on exercising of E2 plans can be found in some of the suggested references in Appendix 1.

Typically, facilities subject to the E2 planning requirements of the Regulations that participate in mutual aid exercises at other facilities cannot count their participation as an exercise of the E2 plan for their facility. Although lessons can be learned from participation, an exercise of the E2 plan for the participating facility is still required.

In addition, a full-scale simulation exercise involving one of the E2 regulated substances at the facility is required every five years. The full-scale exercise requires the deployment of personnel, resources and equipment based on the procedures described in the plan. ECCC encourages participation of the local first response community where possible and recommends that regulatees keep records of attempts to involve them.

5.3.1 Annual simulation exercise

The E2 plan must be exercised at least once per year beginning on the day on which the plan is brought into effect, using one E2 substance identified in the plan from each of the hazard categories at the facility. For example, if you have three hazard categories in the E2 plan, you must select and exercise one substance within each of the three hazard categories annually. Hazard categories are listed in column 5 of Schedule 1 for each substance of the Regulations and include the following:

Although Schedule 1 contains only predominant hazard category for each substance, it is important to note that each substance has the potential to be associated with other hazards. This fact is important to consider when completing the risk analysis and developing the emergency plan. For example, one might consider that the corrosive effects of hydrochloric acid for a particular facility may pose a significant environmental or human health, in addition to its inhalation effects risk.

It is recommended that key response stakeholders identified in the plan be involved in discussions during the planning stage of the E2 plan exercise, when applicable. This involvement will reinforce their role in the plan and enable the responders and other participants to react in the proper manner through adequate pre-planning. However, once the skills and knowledge have been acquired, the scenario can be developed without participants' prior knowledge, to simulate a more realistic situation. Records of the exercises are not required to be submitted to ECCC, but must be stored on-site for seven years and will be verified through inspection.

The type of exercise chosen depends on its purpose, the time of year, the availability of resources and the limitations of conducting exercises that apply to the location of operations. Examples of annual exercises include the following:

simulates the deployment of resources and responds to new developments. A functional exercise provides a more realistic simulation of an emergency compared to a tabletop and is typically conducted in real time in a classroom setting or a designated site for a Command Post. Functional exercises should include outside partners, as applicable, in order to evaluate response times.

Cycle for annual exercise

A different simulation exercise for each hazard category must be carried out annually so that all of the environmental emergencies identified in the E2 plan will be exercised over time. If your facility has more than one substance from the same hazard category, you must simulate one environmental emergency identified in the E2 plan for one substance in that hazard category. ECCC recommends rotating substances when available, if applicable

Example - Annual Exercise Cycle

Site A stores propane, butane, anhydrous ammonia and unleaded gasoline on-site. All four substances are stored at quantities and concentrations above the thresholds set out in Schedule 1, so an emergency plan must be developed and exercised. Site A has identified the following as potential environmental emergencies for its site:

Propane CAS #: 74-98-6, explosion hazard (E) Butane CAS #: 106-97-8, explosion hazard (E) Anhydrous Ammonia CAS #: 7664-41-7, inhalation hazard (I) Unleaded Gasoline CAS #: 8006-61-9, combustible hazard (C)
Environmental Emergency Fire Fire Spill or release - contained in facility Fire
Environmental Emergency Spill or release from valve Spill or release from valve Spill or release from valve Spill or release from valve

For the purposes of conducting an annual exercise, taking into consideration that the site has multiple hazard categories, multiple substances in the same hazard category and the various environmental emergencies identified above, the following will provide a possible annual exercise cycle:

Year 1:

Year 2:

Year 3:

Site A has exercised all hazard categories and environmental emergencies and is therefore required to cycle back through them. When there are multiple substances in the hazard category (such as above - explosive), ECCC recommends rotating the substances being exercised. Therefore, Site A may wish to exercise 'Propane - Spill or release from valve' in year four.

5.3.2 Full-scale exercise

A full-scale exercise is an action-based exercise with the deployment of personnel, resources and equipment. It is typically conducted in real time and with current weather conditions. Full-scale exercises give the response team an opportunity to practise and validate their plans, policies and a wide variety of the skills covered in response training.

Under the Regulations, a full-scale simulation exercise must be completed within five years of the E2 plan being brought into effect, using only one of the E2 substances stored on-site; this can be from any hazard category. The E2 plan must then be exercised at least once every five years thereafter. ECCC recommends rotating through all hazard categories and using worst-case or alternative worst-case emergency scenarios associated with those hazard categories. These exercises may involve other agencies, although role-players representing other agencies can be used if desired.

Once the full-scale exercise is completed, a Notice Regarding Simulation Exercises Conducted in Relation to an E2 Plan (Schedule 5) must be submitted.

When designing an exercise, the responsible person should take into consideration any lessons learned during previous exercises.

5.3.3 Record keeping

In addition to the E2 plan, the following records are also required to be kept at the facility:

least once per year and record the date it was completed. This is done to ensure its effectiveness and adherence to the Regulations.

Note, these records are required to be kept at the facility for seven years.

5.4 Public notification

The purpose of public communication regarding environmental emergencies is to let members of the public know about what they should or need to do during an environmental emergency.

As part of the development of the E2 plan and its implementation, the facility is responsible for public notifications with members of the public who may be affected by an environmental emergency from this facility. This includes communicating before an incident to create awareness of the potential effects to human health and the environment, providing notification of an emergency, as well as giving timely updates during and after the emergency. Members of the public could include, but are not limited to, community associations, public safety authorities (i.e., firefighters and police) and local residents.

The members of the public reached by these notifications should include the public members within the area that could be impacted by an environmental emergency. This area is identified by predicting the greatest impact distance beyond the facility boundary of a potential substance release, such as an ammonia leak or an oil spill. When identifying the affected members of the public by this alternative scenario, the following questions should also be answered to properly inform that public of the risks and possibilities related to an environmental emergency:

Even though the Regulations do not specify how to communicate with the public, as each facility situation is unique, it is expected that members of the public receive accurate and up-to-date information. Some examples include public meetings / information sessions, flyers, posters, stickers, website, newsletters, open house meetings, safety day, information booths at events, door-to-door direct contact, partnering with a local Community Awareness and Emergency Response group or involving the public in exercises/drills.

ECCC recommends that the responsible person share information with the public on the possibilities and the measures that would be taken in case of an environmental emergency. This information should include:

In the event of an environmental emergency, members of the public should be notified as soon as possible using a suitable method (i.e. siren, automated phone message, media release, police/fire services, etc.). The public should also be updated regularly until the emergency is resolved. It is important to note that the responsibility to notify the public ultimately lies with the responsible person/facility. The responsible person at the facility is strongly recommended to include public safety authorities as a way of communicating with and protecting members of the public.

ECCC recommends that the following information be shared with members of the public during and after an environmental emergency:

Once the environmental emergency has been resolved, members of the public should be notified as soon as possible. Communications regarding damage assessment, investigation, and potential compensation should also be included in an 'after event' notification. If warranted, the E2 plan should be revised to incorporate changes that have been implemented to prevent a recurrence of the incident.

5.5 Other important considerations in plan development

5.5.1 Deadline for preparing and implementing an Environmental Emergency Plan

An E2 plan must be

5.5.2 Existing plan

In order to prevent duplication of effort, subsection 4(3) of the Regulations allows facilities to use an existing environmental emergency plan that has been prepared on a voluntary

basis, either for another government or under another act of Parliament. Where such a plan does not meet all the requirements identified within the Regulations, the plan must be amended to meet the remainder of those requirements. It is also possible for regulatees to use old E2 plans prepared under the previous Regulations. However, as some requirements have changed, facilities must verify that the old E2 plan satisfies all the requirements of the current Regulations.

5.5.3 Adequate measures

Subsection 4(4) requires that an E2 plan include adequate measures to address the objectives of preventing, preparing for, responding to and recovering from the environmental emergencies identified under paragraph 4(2)(d). If the prepared E2 plan is not appropriate/adequate for the environmental emergency planned, the facility will be held responsible. It is expected that the responsible person will modify the E2 plan to correct any outstanding inadequate measures.

5.5.4 Location of Environmental Emergency Plan documentation

In order to comply with section 11 of the Regulations, the responsible person for the facility must keep the E2 plan readily available at the facility for the individuals who are responsible to execute the plan and at any other location where the plan may need to be consulted by these individuals. Components of the E2 plan can be located within multiple binders or files; however, all the information that completes the E2 plan must be accessible to those who carry out the E2 plan in the event of an environmental emergency.

6.0 NOTIFICATION OF AN ENVIRONMENTAL EMERGENCY

6.1 Obligation to report environmental emergencies under CEPA 1999 - Verbal notification

6.1.1 Authority

Section 201 of CEPA 1999 sets out the obligation to notify the environmental emergencies to the Department.

This section requires that, when an environmental emergency occurs in respect of any of the substances listed under the Regulations or interim orders (i.e., Schedule 1 of the Regulations), any person who owned or had the charge, management or control of the substance immediately before the environmental emergency, or any person who caused or contributed to the environmental emergency, must, as soon as possible, notify the regional enforcement officer or any other person designated by the regulations.

6.1.2 What is a reportable environmental emergency?

Section 193 of CEPA 1999 defines an environmental emergency as

If there is any doubt as to whether the incident is a reportable environmental emergency, the incident should be reported.

6.1.3 Which substances are required to be reported?

Environmental emergencies involving substances listed in Schedule 1 of the Regulations are required to be reported as soon as possible. The obligation to report environmental emergencies applies whether or not the quantities of substances or container capacity are met or are above the specified quantity threshold, as stated in column 4.

6.1.4 Who is responsible to notify?

Any person who owned or had the charge, management or control of the substance immediately before the environmental emergency, or any person who caused or contributed to the environmental emergency is responsible to notify. Whether or not the person meets any other requirement under the Regulations, they may still be required to report a Schedule 1 substance release that meets the definition of an environmental emergency.

6.1.5 When must verbal notification occur?

The notification must occur as soon as possible.

6.1.6 How to notify?

When an environmental emergency occurs, you must call the applicable phone number identified below associated with the province or territory where the emergency occurred.

6.2 Obligation to report environmental emergencies under CEPA 1999 and the Regulations - Written report

6.2.1 Authority

Authority established under CEPA 1999. See section 6.1 for additional information.

6.2.2 What is a reportable environmental emergency?

Section 18 of the Regulations clarifies that written reports must be provided only when the environmental emergency meets at least one of the following three criteria:

If there is any doubt as to whether the incident is a reportable environmental emergency,

a written report should be provided.

6.2.3 Which substances are to be reported?

The substances of concern are the same as for verbal notifications (see above). See section 5.1.2.

6.2.4 Who is responsible for providing the written report?

See section 6.1.4.

6.2.5 When must the written report be provided?

Notification occurs as soon as possible in the circumstances.

6.2.6 How to report?

A written environmental emergency report (a.k.a. a Schedule 8 Notice) must be submitted in the online E2 reporting system, accessed through the Single Window Information Management (SWIM) system (available at: https://ec.ss.ec.gc.ca).

6.2.7 What must be included in a written report?

The Schedule 8 report must include:

6.3 Considerations during an environmental emergency

In the event of an emergency, the responsible party must notify ECCC through the submission of a Schedule 8 - Written Report of an Environmental Emergency.

  1. Take all reasonable emergency measures consistent with the protection of the environment and public safety to repair, reduce or mitigate any negative effects on

7.0 ACCESS TO INFORMATION FOR PUBLIC SAFETY AUTHORITIES

To the extent that such access is legally permissible, and on a need-to-know basis only, public safety authorities (PSAs) may request access to Environmental Emergencies database information that is classified for either confidential business or national security reasons. PSAs may obtain this access by registering under the 'Public Safety Authorities' section of the Environmental Emergencies Reporting System. The system is accessed via Environment and Climate Change Canada's Single Window Interface: https://ec.ss.ec.gc.ca.

7.1 Benefits for PSAs

Information in the E2 database can be beneficial for PSAs in various ways. This access can

8.0 COMPLIANCE AND ENFORCEMENT

ECCC evaluates the accuracy and completeness of the notices and reports submitted under the Regulations. This evaluation assists the Department in determining

As part of an ongoing monitoring process, ECCC may request that copies of E2 plans be submitted to the Department for review. Such action will help ECCC determine whether departmental guidance on environmental emergency planning is adequate and being properly interpreted. Ongoing auditing of E2 plans is also necessary to assess the effectiveness of the E2 plans in protecting Canadians' safety and security.

8.1 Investigation of possible non-compliance

Enforcement officers apply the Compliance and Enforcement Policy for CEPA 1999 when verifying compliance with the Regulations. This policy sets out the range of possible responses to alleged violations: warnings, directions, environmental protection compliance orders (EPCOs), ticketing, ministerial orders, injunctions and prosecution, as well as environmental protection alternative measures (EPAMs). The Compliance and Enforcement Policy for CEPA 1999 can be accessed at: https://www.canada.ca/en/environment-climate-change/services/canadianenvironmental-protection-act-registry/publications/compliance-enforcement-policy.html

For the purposes of enforcing the Regulations under section 218 of CEPA 1999, enforcement officers are authorized to enter places and inspect E2 plans and any other relevant records in order to confirm compliance with the Regulations.

When an enforcement officer discovers an alleged violation, the officer will choose the appropriate enforcement action based on the following factors:

9.0 SUMMARY OF THE RISK EVALUATION FRAMEWORK

This section introduces the evaluation methodology that ECCC has developed and is using to evaluate the properties of chemical substances that would prove hazardous in the event of an environmental emergency, and to calculate the threshold quantity for substances listed in Schedule 1 of the Regulations.

The Risk Evaluation Framework (REF) is designed to

Section 200 of CEPA 1999 is the authority that allows the Governor in Council to make regulations establishing a list of substances that, should they enter the environment as a result of an environmental emergency, might be harmful to the environment, or to human life or health. Section 200 also gives the Governor in Council the authority to prescribe a minimum quantity for these substances.

In 2003, when the Regulations were published, the REF had not yet been developed. As a result, most of the substances in Schedule 1 (parts 1 and 2) were adopted from the USEPA regulations and some substances came from the Major Industrial Accidents Reduction Council (MIARC), known as the Conseil pour la réduction des accidents industriels majeurs (CRAIM) in French. These thresholds, therefore, were not generated by the REF. The rationale for the MIARC list focused almost entirely on human health and safety criteria (CRAIM 2002; J.P. Lacoursière Inc. 2002). The first amendment to the Regulations added substances from the Toxic Substances List (CEPA 1999), and other substances of concern. The new substances added to the 2019 Regulations are mostly substances evaluated under the Chemical Management Plan (CMP).

The regulated list is not a static one. ECCC continues to assess CEPA 1999 substances and other substances of concern (reactives, petroleum substances, inhalation toxics, etc.) for possible inclusion in the Regulations. As part of this ongoing process, substances may be added to or removed from Schedule 1 of the Regulations (for example, nickel carbonate was present in the 2011 Regulations, but was removed in the new 2019 Regulations), or thresholds may be adjusted if new data show such adjustments to be warranted.

APPENDIX 1

Suggested References for Environmental Emergencies Prevention, Preparedness and Response Measures, and the Development of Environmental Emergency Plans

EMERGENCY MANAGEMENT

  1. Canadian Standards Association (CSA). Emergency Preparedness and Response: A National Standard of Canada (CAN/CSA-Z731-03 (R2014). Toronto: CSA, 2003. This document can be ordered from CSA International at 1-800463-6727 or from the CSA website at https://store.csagroup.org/
  2. Canadian Standards Association (CSA). Emergency Preparedness and Response for Petroleum and Natural Gas Systems (CAN/CSA-Z246.2-18). Toronto: CSA, 2018. This document can be ordered from CSA International at 1-800-4636727 or from the CSA website at https://store.csagroup.org/
  3. National Fire Protection Association (NFPA). NFPA 1600: Standard on Continuity, Emergency, and Crisis Management, 2019 Edition . Quincy, Massachusetts: NFPA, 2007. This document can be ordered from the NFPA at 1-800-344-3555 or from the NFPA website at https://catalog.nfpa.org/Codes-and-Standards-C3322.aspx?icid=D661
  4. United Nations Environment Programme (UNEP). APELL, Awareness and Preparedness for Emergencies at a Local Level: A process for improving community awareness and preparedness for technological hazards and environmental emergencies . Paris: UNEP, 2nd Edition 2015. This document can be downloaded from http://apell.eecentre.org/Modules/GroupDetails/UploadFile/APELL_H andbook_2016_-_Publication.pdf
  5. Organization for Economic Co-operation and Development (OECD). OECD Guiding Principles for Chemical Accident Prevention, Preparedness and Response: Guidance for Public Authorities, Industry (including Management and Labour), Communities and Other Stakeholders. Paris: OECD, 2003. Available through the OECD Chemical Accident Prevention, Preparedness and Response website at https://www.oecd.org/env/ehs/chemical-accidents/Guidingprinciples-chemical-accident.pdf

PROCESS SAFETY / RISK MANAGEMENT

  1. American Petroleum Institute (API). Recommended Practice 750, Management of Process Hazards . Washington, D.C.: API, 1990. This document is available from API in Washington, D.C. (at 202-682-8000 or at its website at www.api.org).
  2. Canadian Standards Association (CSA). Process Safety Management (CAN/CSA-Z7670-17). Toronto: CSA, 2017. This document can be ordered from CSA International at 1-800-463-6727 or from the CSA website at https://store.csagroup.org/
  3. Canadian Chemical Producers' Association. Site Self-Assessment Tool . Ottawa:, 1999. This document can be downloaded from https://www.cheminst.ca/communities/divisions/psm/psmpublications/
  4. Canadian Society for Chemical Engineering (CSChE). Guidelines for Site Risk Communication , 3rd Edition 2012, Ottawa: CSChE 2012. This document can be downloaded from https://www.cheminst.ca/communities/divisions/psm/psmpublications/
  5. Conseil pour la réduction des accidents industriels majeurs (CRAIM) / Major Industrial Accidents Reduction Council (MIARC). Risk Management Guide for Major Technological Accidents , 7th Edition, 2017, Montréal. This document is currently available in both English and French at www.craim.ca
  6. U.S. Department of Labor, Occupational Safety and Health Administration (OSHA) Process Safety Management (PSM) standards . All standards are available from OSHA at https://www.osha.gov/SLTC/processsafetymanagement/standard s.html
  7. U.S. Environmental Protection Agency (EPA). Areal Locations of Hazardous Atmospheres (ALOHA). This software, as well as associated documentation, is available from the EPA website at https://www.epa.gov/cameo/aloha-software
  8. U.S. Environmental Protection Agency (EPA). General Guidance on Risk Management Programs for Chemical Accident Prevention (40 CFR Part 68) (EPA-555-B-04-001). Washington, D.C.: U.S. EPA, 2009. This document is available from the EPA website at

https://www.epa.gov/rmp/guidance-facilities-risk-managementprograms-rmp#general

  1. U.S. Environmental Protection Agency (EPA). Risk Management Program Guidance for Offsite Consequence Analysis (40 CFR Part 68) (EPA-555-B-99-009). Washington, D.C.: U.S. EPA, 2009. This document is available from the EPA website at https://www.epa.gov/rmp/rmp-guidance-offsite-consequence-analysis
  2. U.S. Environmental Protection Agency (U.S. EPA). RMPComp ™ Modelling Program for Risk Management Plans. RMPComp ™ is a free computer program that can be used to complete off-site consequence analyses for the substances that originate from the Environmental Protection Agency's Risk Management Program list. This software can be downloaded from https://www.epa.gov/rmp/rmpcomp

APPENDIX 2

Regional Contact Information for the Regulations

If you require assistance regarding the Regulations or filing notices, please contact your regional representative. For all other enquiries regarding the Regulations, please contact the national office.

Region Regional Environment and Climate Change Canada Office Written Report 3
Atlantic Region: • Nova Scotia • New Brunswick • Newfoundland and Labrador • Prince Edward Island Compliance Promotion - Environmental Emergencies Program Atlantic Region Environment and Climate Change Canada 45 Alderney Drive, 15th Floor, Queen Square Dartmouth, Nova Scotia B2Y 2N6 Phone: 1-800-668-6767 Email: ec.ue-atl- e2.ec@canada.ca Regional Director, Environmental Enforcement Directorate Atlantic Region Environment and Climate Change Canada Queen Square 45 Alderney Drive Dartmouth NS B2Y 2N6 Fax: 902-426-7924
Quebec Region Compliance Promotion - Environmental Emergencies Program Quebec Environment and Climate Change Canada 351 St-Joseph Blvd Gatineau, Quebec K1A 0H3 Phone: 1-800-668-6767 Email: ec.ue-qc- e2.ec@canada.ca Regional Director, Environmental Enforcement Directorate Quebec Region Environment and Climate Change Canada 105 McGill Street (3rd Floor) Montréal QC H2Y 2E7 Fax: 514-496-2087
Region Regional Environment and Climate Change Canada Office Written Report 3
Ontario Region Compliance Promotion - Environmental Emergencies Program Ontario Region Environment and Climate Change Canada 4905 Dufferin Street Downsview, Ontario, M3H 5T4 Phone: 1-800-668-6767 Email: ec.ue-on- e2.ec@canada.ca Regional Director, Environmental Enforcement Directorate Ontario Region Environment and Climate Change Canada 845 Harrington Court Burlington ON L7N 3P3 Fax: 905-333-3952
Prairie and Northern Region: • Alberta • Saskatchewan • Manitoba • Northwest Territories • Nunavut Compliance Promotion - Environmental Emergencies Program Prairie and Northern Region Environment and Climate Change Canada 9250 - 49th Street NW Edmonton, Alberta, T6B 1K5 Phone: 1-800-668-6767 Email: ec.ue-pn- e2.ec@canada.ca Regional Director, Environmental Enforcement Directorate Prairie and Northern Region Environment and Climate Change Canada Twin Atria Building 4999 - 98th Avenue, Room 200 Edmonton AB T6B 2X3 Fax: 780-495-2451
Pacific and Yukon Region: • British Columbia • Yukon Compliance Promotion - Environmental Emergencies Program Pacific and Yukon Region Environment and Climate Change Canada 201 - 401 Burrard Street Vancouver, British Columbia, V6C 3S5 Phone: 1-800-668-6767 Email: ec.ue-py- e2.ec@canada.ca Regional Director, Environmental Enforcement Directorate Pacific and Yukon Region Environment and Climate Change Canada 201 - 401 Burrard Street (4th Floor) Vancouver BC V6C 3S5 Fax: 604-666-9059
Region Regional Environment and Climate Change Canada Office Written Report 3
National Office Environmental Emergencies Program Environment and Climate Change Canada 351 St. Joseph Boulevard Gatineau, Quebec, K1A 0H3 Phone: 1-800-668-6767 Email: ec.ue- e2.ec@canada.ca

APPENDIX 3

Determination of Container Capacity and Substance Quantity

TABLE OF CONTENTS

CONTAINER SYSTEM ...................................................................................................................... 56
Single container system................................................................................................................ 56
Two container systems ................................................................................................................. 57
Three container systems............................................................................................................... 57
Determination of the quantity on-site and the maximum capacity of the largest container system....................................................................................................................................... 58
QUANTITY CALCULATION EXAMPLES............................................................................................. 58
Part 1 substance (single substance).............................................................................................. 58
Example 1 - Propane (interconnected containers - automatic control valves) ...................... 58
Example 2 - Propane (interconnected containers - manual valves) ....................................... 60
Example 3 - Cyclohexane ......................................................................................................... 62
Example 4 - Crude oil, oil sand................................................................................................. 63
Example 5 - Uncontained and contained................................................................................. 65
Part 1 substance (mixture)............................................................................................................ 67
Example 6 - Inhalation mixture................................................................................................ 67
Example 7 - Mixture containing C and/or E substances .......................................................... 68
Example 8 - Aquatic toxic mixture ........................................................................................... 71
Example 9 - Mixture containing C and/or E substances (% range).......................................... 73
Part 2 substance (single substance, 2 tank systems, 2 substance concentrations) ..................... 76
Example 10 - Hydrochloric acid................................................................................................ 76
Part 2 substance (mixture)............................................................................................................ 78
Example 11 - Mixtures containing C and/or E substance ........................................................ 78
Example 12 - Aquatic mixture with acids................................................................................. 80
Example 13 - Inhalation mixture with acids............................................................................. 83
Example 14 - Inhalation mixture with acids............................................................................. 85
Example 15 - Inhalation mixture with acids............................................................................. 88

Container system

In the Regulations, a container system means any receptacle or network of receptacles that is used to contain a substance-including any connecting pipelines or piping-except any part of that network that is automatically or remotely segregated from the rest of the network by shut-off valves, or other mechanisms, in the event of an environmental emergency (section1(1)).

In the Regulations, a container system can be segregated by either automatic or remote shut-off valves, but not by manual valves. A manual valve by design requires someone to shut off the flow of the substance by hand. This approach to preventing potential spills of hazardous substances is not considered the safest procedure since one may be exposed to the substance, nor the quickest method since one may be required to put on protective clothing first before attempting to close the valve or one may not be able to access the valve at all. As a result, manual valves are not considered to be an acceptable mechanism for segregating portions of a container system into their own distinct vessels.

The term ' other mechanisms' has been intentionally left ambiguous for the purpose of allowing other valves that may serve in the same manner and function as automatic or remote valves, but have not been specifically identified. To be clear, all ' other mechanisms' must also have the means to shut off the flow of a substance without the need to send an employee to manually turn or push a mechanism to stop the flow. For example, flare/flame arrestors are designed to stop fuel combustion by extinguishing a flame. Since the mechanism does not stop the flow of the substance, this would not be considered an ' other mechanism.'

Single container system

Figure 1: Graphic representation of a single container system.

This series of containers shows only manual valves, which do not separate containers automatically or remotely. Therefore, this is considered to be one container system.

Technical Guidelines for the Environmental Emergency Regulations, 2019

Two container systems

Figure 2: A graphic representation of a series of containers that constitute two container systems.

An automatic valve on pipe 2 is separating the series of containers into two container systems, starting from the left:

Container system 1: Tank 1 + pipe 1 + Tank 2 + ½ pipe 2

Container system 2: ½ pipe 2 + tank 3 + pipe 3 + tank 4

Three container systems

Figure 3: A graphic representation of a series of containers that constitute three container systems. In this example there are two automatic valves and one manual valve. The manual valve is ignored. In this case, this means that there are three container systems, starting from the left:

Container system 1: Tank 1 + ½ pipe 1

Container system 2: ½ pipe 1 + tank 2 + pipe 2 + tank 3 + ½ pipe 3

Container system 3: ½ pipe 3 + tank 4

Determination of the quantity on-site and the maximum capacity of the largest container system

If the entire quantity of a substance on-site is stored in a single container system, then the total quantity on-site would be the sum of the amounts found in each tank and in each of the pipes.

If the substance stored on-site is contained in more than a single container system, then whichever container system has the higher quantity capacity will be recorded as the maximum capacity of the largest container system.

To calculate the maximum capacity, add up the maximum capacity of all of the pipes and the 100% maximum capacity of each tank, without considering the Safe Fill Limits.

Where the substance is stored in a container system and is also present in an uncontained state, the maximum capacity will be the larger value of the tonnage of uncontained material or the maximum capacity of the largest container system.

Quantity calculation examples

The densities used in the following calculation examples vary according to temperature and pressure and may not be the appropriate densities to be used in the actual calculation.

Part 1 substance (single substance)

Example 1 - Propane (interconnected containers - automatic control valves)

Substance: Propane

Concentration: 100%

Density* @15C = 0.5066 g/cm 3

*Density value provided is for example purposes only. Density value of propane used in actual calculations should be based on on-site parameters (i.e. pressure, temp)

USWG USWG USWG
Tank 1 Tank 2 Piping
Max. Capacity 2000 2000 10
Total Quantity 1600 1600 10

Container System Diagram Showing Total Quantity On-site (U.S. Gallons):

Propane in the Regulations:

Column 1 Column 2 Column 3 Column 4 Column 5
Sch 1 Item # CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
17 1 74-98-6 Propane 1 4.5 E

Maximum Capacity of Largest Container System:

1 st container system (Tank 1 + ½ piping = 2000 USWG + 5 USWG):

2 nd container system (Tank 2 + ½ piping = 2000 USWG + 5 USWG):

The maximum capacity of the largest container system is 3.84 tonnes.

Total Quantity on Site:

1600 USWG + 1600 USWG + 10 USWG = 3210 USWG

The total quantity on site is 6.16 tonnes.

Schedules to fill out:

Example 2 - Propane (interconnected containers - manual valves)

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Propane 3.84 < 4.5 No 6.16 ≥ 4.5 Yes 2

Substance: Propane

Concentration: 100%

Density * @15C = 0.5066 g/cm 3

USWG USWG USWG
Tank 1 Tank 2 Piping
Max. Capacity 2000 2000 10
Total Quantity 1600 1600 10

Container System Diagram Showing Total Quantity On-site (U.S. Gallons):

Propane in the Regulations:

Column 1 Column 2 Column 3 Column 4 Column 5
Sch 1 Item # CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
17 1 74-98-6 Propane 1 4.5 E

Maximum Capacity of Largest Container System:

1 st container system (Tank 1 + Tank 2 + 1 pipe = 2000 USWG + 2000 USWG + 10 USWG):

The maximum capacity of the largest container system is 7.69 tonnes.

Total Quantity on Site:

The total quantity on site is 6.16 tonnes.

Schedules to fill out:

Example 3 - Cyclohexane

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Propane 7.69 > 4.5 Yes 6.16 ≥ 4.5 Yes 2, 3, 4, 5

Substance: Cyclohexane

Concentration: 100%

Tonnes Tonnes Tonnes Tonnes Tonnes
Tank 1 Tank 2 Tank 3 Tank 4 Pipes
Max. Capacity 250 250 250 250 0.215
Total Quantity 200 150 180 160 0.215

Container system diagram showing total quantity on-site (tonnes)

Cyclohexane in the Regulations (Sch 1 - page 17)

Technical Guidelines for the Environmental Emergency Regulations, 2019

Column 1 Column 2 Column 3 Column 4 Column 5
Item 94 1 Registry Number 110-82-7 Name of Substance Cyclohexane (% mass/mass) 1 Quantity (tonnes) 550 Category (Short Form) C

Considerations when determining the maximum capacity of the largest container system

Maximum capacity calculations

1st container system (Tank 1 + ½ pipe): 250 + ½ pipe (0.215) = 250.1075 tonnes

2nd container system (Tank 2 + Tank 3 + 1 pipe + two ½ pipes): 250 + 250 + 1.0 pipe (0.215) + 0.5 pipe (0.215) + 0.5 pipe (0.215) = 500.43 tonnes

3rd container system (Tank 4 + ½ pipe): 250 + ½ pipe (0.215) = 250.1075 tonnes

The maximum capacity of the largest container system is 500.43 tonnes.

Total quantity on-site calculation

200 + 150 + 180 + 160 + (3 x 0.215) = 690.645 tonnes

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Cyclohexane 500.43 < 550 No 690.645 ≥ 550 Yes 2

Example 4 - Crude oil, oil sand

Substance: Crude oil, oil sand

Concentration: 100%

Tonnes Tonnes Tonnes Tonnes Tonnes
Tank 1 Tank 2 Tank 3 Tank 4 Pipes
Max. Capacity 5000 4000 225 200 1
Total Quantity 4000 3000 180 160 1

Container system diagram showing total quantity on-site (tonnes)

Crude oil, oil sand in the Regulations (Sch 1 - page 22)

Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
234 1 128683-25-0 Crude oil, oil sands 1 2500 F

Considerations when determining the maximum capacity of the largest container system

Maximum capacity calculations

1st container system (tank 1): 5000 tonnes

2nd container system (tank 2 + ½ pipe): 4000 + 0.5 = 4 000.5 tonnes

3rd container system (tank 3 + ½ pipe + ½ pipe) = 225 + 0.5 + 0.5 = 226 tonnes

4th container system (take 4 + ½ pipe) = 200 + 0.5 = 200.5 tonnes

The maximum capacity of the single largest container system is 5000 tonnes.

Total quantity on-site calculation

Schedules to fill out

Example 5 - Uncontained and contained

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Crude oil, oil sand 5000 ≥ 2 500 Yes 7342 ≥ 2 500 Yes 2, 3, 4, 5

Substance: Ammonium nitrate

Concentration: 100%

Tonnes Tonnes
Tank 1 Uncontained
Max. Capacity 10 20
Total Quantity 5 20

Diagram showing contained and uncontained total quantity on-site (tonnes):

Ammonium nitrate, solid in the Regulations (Sch 1 - page 19)

Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
152 1 6484-52-2 Ammonium nitrate, solid 60 20 O

Maximum capacity of the largest container system

Container system (tank 1): 10 tonnes

Uncontained: 20 tonnes

The maximum capacity of the single largest container system is 10 tonnes, but the amount of the substance in an uncontained state is 20 tonnes. Therefore, 20 tonnes will be reported as the maximum capacity.

Total quantity on-site 5 + 20 = 25 tonnes

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Ammonium nitrate, solid 20 ≥ 20 Yes 25 ≥ 20 Yes 2, 3, 4, 5

Part 1 substance (mixture)

Example 6 - Inhalation mixture

Substance: inhalation mixture with an overall vapour pressure of 3.33 kPa (No CAS # assigned to this mixture).

Tonnes Tonnes
Tank 1 Pipes
Max. Capacity 10 0
Total Quantity 8 0

Composition of tank

E2 Substance %(by weight in tonnes)
Cyanogen bromide 60
Cyanogen chloride 40

Container system diagram showing total quantity on-site (tonnes)

Substances found within the inhalation mixture in the Regulations (Sch 1 - page 18)

Item Column 1 CAS Registry Column 2 Name of Substance Column 3 Concentration (% Column 4 Minimum Quantity Column 5 Hazard Category (Short
119 1 506-63-3 Cyanogen bromide 10 4.5 I
120 1 506-77-4 Cyanogen chloride 10 4.5 I

Maximum capacity of the largest container system

The largest container system has 10 tonnes.

Total quantity on-site calculation

The total quantity on-site is 8 tonnes. Each individual E2 substance will need to be calculated for the total quantity on-site.

E2 Substance % 8 Tonnes x% (on-site)
Cyanogen bromide 60 4.8
Cyanogen chloride 40 3.2

Schedules to fill out

Example 7 - Mixture containing C and/or E substances

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Cyanogen bromide 10 ≥ 4.5 Yes 4.8 ≥ 4.5 Yes 2, 3, 4, 5
Cyanogen chloride 10 ≥ 4.5 Yes 3.2 < 4.5 No 2

Substance: A mixture with an overall boiling point of 45 ⁰C and an overall flashpoint of 6 °C (No CAS # is assigned to this mixture)

Tonnes Tonnes Tonnes Tonnes Tonnes
Tank 1 Tank 2 Tank 3 Tank 4 Pipes
Max. Capacity 45 45 45 45 0.1
Total Quantity 36 36 36 36 0.1

Composition of tanks

E2 Substance %
Methane 30
Ethane 25
Propane 10
Styrene 25
Cyclopropane 9.4
Benzene 0.5
Xylenes 0.1

Container system diagram showing total quantity on-site (tonnes)

Substances found within the mixture from the Regulations

Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
7 1 74-82-8 Methane 1 4.5 E
9 1 74-84-0 Ethane 1 4.5 E
17 1 74-98-6 Propane 1 4.5 E
60 3 100-42-5 Styrene 1 4.5 E
28 2 75-19-4 Cyclopropane 1 4.5 E
6 1 71-43-2 Benzene 1 10 C
Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
146 4 1330-20-7 Xylenes 1 8000 C

Maximum capacity of the largest container system

Maximum capacity calculations

1st container system (tank 1 + ½ pipe): 45 + ½ pipe (0.1) = 45.05 tonnes

2nd container system (tank 2 + tank 3 + 1 pipe + two ½ pipes): 45 + 45 + 1 pipe (0.1) + ½ pipe (0.1) + ½ pipe (0.1) = 90.2 tonnes

3rd container system (tank 4 + ½ pipe): 45 + ½ pipe (0.1) = 45.05 tonnes

The maximum capacity of the single largest container system is 90.2 tonnes.

Total quantity on-site calculations

Tank 1 + tank 2 + tank 3 + tank 4 + 3 pipes = 36 + 36 + 36 + 36 + (3 x 0.1) = 144.3 tonnes

Each individual E2 substance will need to be calculated for the total quantity on-site for that substance.

E2 Substance % 144.3 Tonnes x % (on-site)
Methane 30 43.29
Ethane 25 36.08
Propane 10 14.43
styrene 25 36.08
Cyclopropane 9.4 13.56

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Methane 90.2 ≥ 4.5 Yes 43.29 ≥ 4.5 Yes 2, 3, 4, 5
Ethane 90.2 ≥ 4.5 Yes 36.08 ≥ 4.5 Yes 2, 3, 4, 5
Propane 90.2 ≥ 4.5 Yes 14.43 ≥ 4.5 Yes 2, 3, 4, 5
Styrene 90.2 ≥ 4.5 Yes 36.08 ≥ 4.5 Yes 2, 3, 4, 5
Cyclopropane 90.2 ≥ 4.5 Yes 13.56 ≥ 4.5 Yes 2, 3, 4, 5
Benzene Concentration Not Met Concentration Not Met None
Xylenes Concentration Not Met Concentration Not Met None

Example 8 - Aquatic toxic mixture

Substance: An aquatically toxic mixture (No CAS # assigned to this mixture).

Tonnes Tonnes
Tank 1 Pipes
Max. Capacity 0.7 0
Total Quantity 0.56 0

Composition in the tank

Substances %
Nickel(II) nitrate, hexahydrate 30
Nickel ammonium sulphate 25
Nickel nitrate 10
Nickel carbonate* 35

Container system diagram showing total quantity on-site (tonnes):

Substances found within the aquatic toxic mixture in the Regulations

Item Column 1 CAS Registry Number Column 2 Name of Substance Column 3 Concentration (% mass/mass) Column 4 Minimum Quantity (tonnes) Column 5 Hazard Category (Short Form)
207 1 13478-00-7 Nickel(II) nitrate, hexahydrate 10 0.22 A
208 1 15699-18-0 Nickel ammonium sulphate 10 0.22 A
204 2 13138-45-9 Nickel nitrate 10 0.22 A

Maximum capacity of the largest container system

Maximum capacity calculation

The maximum capacity of the single largest container system is 0.7 tonnes.

Total quantity on-site

Only one tank - total quantity of mixture is 0.56 tonnes.

Each individual E2 substance will need to be calculated for the total quantity on-site for that substance.

E2 Substance % 0.56 Tonnes x % (on-site)
Nickel(II) nitrate, hexahydrate 30 0.17
Nickel ammonium sulphate 25 0.14
Nickel nitrate 10 0.06

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Nickel(II) nitrate, hexahydrate 0.7 ≥ 0.22 Yes 0.17 < 0.22 No 2
Nickel ammonium sulphate 0.7 ≥ 0.22 Yes 0.14 < 0.22 No 2
Nickel nitrate 0.7 ≥ 0.22 Yes 0.06 < 0.22 No 2
Nickel carbonate Not an E2 Substance Not an E2 Substance none

Example 9 - Mixture containing C and/or E substances (% range)

Substance: A mixture with an overall boiling point of 145 °C and an overall flashpoint of 20 °C (No CAS # is assigned to this mixture)

Tonnes Tonnes Tonnes Tonnes Tonnes Tonnes Tonnes
Tank 1 Tank 2 Tank 3 Tank 4 Pipe 1 Pipe 2 Pipe 3
Max. Capacity 400 250 125 80 2 1 1
Total Quantity 300 200 100 50 2 1 1

Composition of tanks and estimated calculation percentage

Substances % Use highest %in range [e.g., (30 - 100), use 100] Adjust to 100% (e.g., 100 ÷ 190.5 = 52.5%)
Propane 30 - 100 100 52.5
Methane 20 - 60 60 31.5
1,3- pentadiene, ( E )- 10 - 15 15 7.9 *
Substances % Use highest %in range [e.g., (30 - 100), use 100] Adjust to 100% (e.g., 100 ÷ 190.5 = 52.5%)
Toluene 5 - 10 10 5.2
Benzene 0.5 - 5 5 2.6
Xylene 0.1 - 0.5 0.5 ** 0.3

Total =

190.5 %

100.0%

** Below concentration of Schedule 1 Column 3 concentration threshold for substance therefore not carried forward in the total quantity calculations

Substances and percentages that are recommended for use in calculations

E2 Substances %
Propane 52.5
Methane 31.5
Toluene 5.2
Benzene 2.6

Container system diagram showing total quantity on-site (tonnes)

Substances found within the mixture from the Regulations

Item Column 1 CAS Registry Number Column 2 Name of Substance Column 3 Concentration (% mass/mass) Column 4 Minimum Quantity (tonnes) Column 5 Hazard Category (Short Form)
17 1 74-98-6 Propane 1 4.5 E
7 1 74-82-8 Methane 1 4.5 E
83 2 108-88-3 Toluene 1 2500 C
6 1 71-43-2 Benzene 1 10 C
Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
146 3 1330-20-7 Xylenes 1 8000 C

Maximum capacity of largest container system

Maximum capacity calculations

1st container system (tank 1 + 20% pipe 1): 400 + 0.2 (2) = 400.4 tonnes

2nd container system (tank 2 + 80% pipe 1 + 50% pipe 2): 250 + 0.8(2) + 0.5 (1) = 252.1 tonnes

3rd container system (tank 3 + 0.5% pipe 2 + pipe 3 + tank 4) = 125 + 0.5(1) + 1 + 80 = 206.5 tonnes

The maximum capacity of the single largest container system is 400.4 tonnes.

Total quantity on-site

Tank 1 + tank 2 + tank 3 + tank 4 + 3 pipes = 300 + 200 + 100 + 50 + 2 + 1 + 1 = 654 tonnes

Each individual E2 substance will need to be calculated for the total quantity on-site for that substance.

E2 Substance % 654 Tonnes x% (on site)
Propane 52.5 343.35
Methane 31.5 206.01
Toluene 5.2 34.01
Benzene 2.6 17

Schedules to fill out

E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules needed to be completed
Propane 400.4 ≥ 4.5 Yes 343.35≥ 4.5 Yes 2, 3, 4, 5
Methane 400.4 ≥ 4.5 Yes 206.01 ≥ 4.5 Yes 2, 3, 4, 5
Toluene 400.4 < 2 500 No 34.01 < 2 500 No none
Benzene 400.4 ≥ 10 Yes 17.00 ≥ 10 Yes 2, 3, 4, 5
Xylenes Concentration Not Met Concentration Not Met None

Part 2 substance (single substance, 2 tank systems, 2 substance concentrations)

Example 10 - Hydrochloric acid

Substance: Hydrochloric acid

Maximum capacity of individual tanks

Tank 1: Concentration: 40% with density: 1.198 g/cm 3

Tank 2: Concentration: 34% with density: 1.1691 g/cm 3

Litres Litres Litres
Tank 1 Tank 2 Pipes
Max. Capacity 1600 800 0
Total Quantity 1280 600 0

Container system diagram showing total quantity on-site (litres):

Hydrochloric acid in the Regulations (Sch 1 - page 22)

Technical Guidelines for the Environmental Emergency Regulations, 2019

Column 1 Column 2 Column 3 Column 4 Column 5
7 1 7647-01-0 Hydrochloric acid 30 6.8 I

Maximum capacity of the largest container system

2nd container system (tank 2)

The maximum capacity of the single largest container system is 1.93 tonnes.

Total quantity on-site calculation

Total quantity on-site: 0.61 + 0.24 = 0.85 tonnes

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Hydrochloric acid 1.93 < 6.80 No 0.85 < 6.80 No none

Part 2 substance (mixture)

Example 11 - Mixtures containing C and/or E substance

Substance: A mixture with an overall boiling point of 80 ⁰C and an overall flashpoint of -10 ⁰C (No CAS # assigned to this mixture)

Tonnes Tonnes Tonnes
Tank 1 Tank 2 Pipes
Max. Capacity 50 60 1
Total Quantity 30 48 1

Composition of both tanks

E2 Substance %(by Weight in Tonnes)
Naphtha 10
Methane 20
Propane 60
Benzene 5
2,2- dimethylpropane 5

Container system diagram showing total quantity on-site (tonnes)

Substances found within the mixture from the Regulations

Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
191 1 8030-30- 6 Naphtha 1 50 C
7 2 74-82-8 Methane 1 4.5 E
17 2 74-98-6 Propane 1 4.5 E
6 2 71-43-2 Benzene 1 10 C
117 3 463-82-1 2,2- dimethylpropane 1 4.5 E

Maximum capacity of the largest container system

Tank #1 (50 tonnes) + Tank #2 (60 tonnes) + pipe = 50 tonnes + 60 tonnes + 1.0 tonnes = 111 tonnes

The maximum capacity of the single largest container system is 111 tonnes.

Total quantity on-site calculation

Tank #1 (30 tonnes) + Tank #2 (48 tonnes) + pipe (1 tonne) = 30 tonnes + 48 tonnes + 1.0 tonnes = 79 tonnes

Each individual E2 substance will need to be calculated for the total quantity on-site.

E2 Substance % 79 Tonnes x % (on-site)
Naphtha 10 7.9
Methane 20 15.8
Propane 60 47.4
Benzene 5 3.95
2,2- dimethylpropane 5 3.95

Schedules to fill out

E2 Substance Meets Maximum Capacity of Largest Container System (tonnes) Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Naphtha 111 ≥ 50 Yes 7.9 < 50 No 2
Methane 111 ≥ 4.5 Yes 15.8 ≥ 4.5 Yes 2, 3, 4, 5
Propane 111 ≥ 4.5 Yes 47.4 ≥ 4.5 Yes 2, 3, 4, 5
Benzene 111 ≥ 10 Yes 3.95 < 10 No 2
2,2- dimethylpropane 111 ≥ 4.5 Yes 3.95 < 4.5 No 2

Example 12 - Aquatic mixture with acids

Substance: An aquatically toxic mixture (No CAS # assigned to this mixture)

Tank 1 = Chromic acid 26% with density: 0.3172 g/cm 3 (15 °C)

Arsenic acid 30% with density: 0.3699 g/cm 3 (15 °C)

No density for mixture provided - will be required to calculate overall density as part of example.

Composition in the tank

Substance %(by volume)
Chromic Acid 26
Arsenic Acid 30
Water* 44
U.S. Gallons U.S. Gallons
Tank 1 Pipes
Max. Capacity 5000 0
Total Quantity 3000 0

Container system diagram showing total quantity on-site (U.S. gallons):

Substances found within the aquatic mixture in the Regulations (page 22)

Item Column 1 CAS Registry Number Column 2 Name of Substance Column 3 Concentration (% mass/mass) Column 4 Minimum Quantity (tonnes) Column 5 Hazard Category (Short Form)
12 1 7738-94-5 Chromic acid 10 0.22 A
13 1 7778-39-4 Arsenic acid 10 0.22 A

Maximum capacity of the largest container system

Calculating mass and volume

Mass (g)Chromic acid

Mass (g)Arsenic acid

Calculating the density of the overall solution

Calculating the tonnage of maximum capacity of the largest single container system

The maximum capacity of the single largest container system is 11.99 tonnes.

Total quantity on-site

Each individual E2 substance will need to be calculated for the total quantity on-site.

Arsenic acid total quantity on-site

E2 Substance % Tonnes (on-site)
Chromic acid 26 0.94
Arsenic acid 30 1.26

Schedules to fill out

Example 13 - Inhalation mixture with acids

E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Chromic acid 11.99 ≥ 0.22 Yes 0.94 ≥ 0.22 Yes 2, 3, 4, 5
Arsenic acid 11.99 ≥ 0.22 Yes 1.26 ≥ 0.22 Yes 2, 3, 4, 5

Substance: An inhalation toxic mixture (No CAS # assigned to this mixture)

Tank 1 = Acetic acid 95% with density: 1.00748 g/cm 3 (20 °C) Peracetic acid 5% with density: 1.15 g/cm 3 (20 °C) Overall density of mixture = 1.0146 g/cm 3

Composition in the tank

E2 Substance %(by volume)
Acetic Acid 95
Peracetic Acid 5
U.S. Gallons U.S. Gallons
Tank 1 Pipes
Max. Capacity 2 000 0
Total Quantity 1 600 0

Container system diagram showing total quantity on-site (U.S. gallons):

Substances found within the inhalation mixture in the Regulations (page 22)

Item Column 1 CAS Registry Number Column 2 Name of Substance Column 3 Concentration (% mass/mass) Column 4 Minimum Quantity (tonnes) Column 5 Hazard Category (Short Form)
2 1 64-19-7 Acetic acid 95 6.8 A
4 1 79-21-0 Peracetic acid 10 4.5 A

Maximum capacity of the largest container system

The maximum capacity of the single largest container system is 7.68 tonnes.

Total quantity on-site

E2 Substance % Tonnes (on-site)
Acetic acid 95 5.8

Schedules to fill out

E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Acetic acid 7.68 ≥ 6.80 Yes 5.80 < 6.80 No 2
E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Peracetic acid Did Not Meet Concentration Did Not Meet Concentration None

Example 14 - Inhalation mixture with acids

Tank 1 and Tank 2 = Nitric acid 13% with density 1.072 g/cm 3 (20 °C) Hydrochloric acid 40% with density 1.198 g/cm 3 (20 °C)

No density for mixture provided - will be required to calculate overall density as part of example

Composition in the tank

E2 Substance %(by volume)
Nitric Acid 13
Hydrochloric Acid 40
Water* 47
Litres Litres Litres
Tank 1 Tank 2 Pipes
Max. Capacity 20 000 20 000 20
Total Quantity 12 000 12 000 20

Container system diagram showing total quantity on-site (litres):

Substances found within the inhalation mixture in the Regulations (page 22)

Column 1 Column 2 Column 3 Column 4 Column 5
Item CAS Registry Number Name of Substance Concentration (% mass/mass) Minimum Quantity (tonnes) Hazard Category (Short Form)
7 1 7647-01- 0 Hydrochloric acid 30 6.80 I
10 1 7697-37- 2 Nitric acid 80 6.80 I

Maximum capacity of the largest container system

Calculating mass and volume

Mass (g)Nitric acid

Mass (g)Hydrochloric acid

Mass (g)water

Volume (cm 3 )Total

Calculating the density of the overall solution

Calculating the tonnage of the maximum capacity of the largest single container system

The maximum capacity of the single largest container system is 43.56 tonnes.

Total quantity on-site

There are two tanks and one pipe between the tanks.

The total quantity is 12 000 L + 12 000 L + 20 L = 24 020 L

Hydrochloric acid (40%) total quantity on-site

E2 Substance % Tonnes (on-site)
Hydrochloric acid 40 11.51

Schedules to fill out

E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Hydrochloric acid 43.56 ≥ 6.80 Yes 11.51 ≥ 6.80 Yes 2, 3, 4, 5
Nitric acid Concentration Not Met Concentration Not Met None

Example 15 - Inhalation mixture with acids

Tank 1, Tank 2 and Tank 3 all contain:

Hydrochloric acid at 30% (v/v) at 20 °C has a density of 1.1493 g/cm 3

Hydrofluoric acid at 60% (v/v) at 0 °C has a density of 1.235 g/cm 3

Hydrobromic acid at 10% (v/v) at 25 °C has a density of 1.728 g/cm 3

Density of solution = 1.2586 g/cm 3

Composition in the tank

E2 Substance %(U.S. Gallons by Volume)
Hydrochloric acid 30
Hydrofluoric acid 60
Hydrobromic acid 10
U.S. Gallons U.S. Gallons U.S. Gallons U.S. Gallons
Tank 1 Tank 2 Tank 3 Pipes
Max. Capacity 2500 15 000 37 500 100
Total Quantity 2000 12 000 30 000 100

Container system diagram showing total quantity on-site (U.S. gallons)

Substances found within the inhalation mixture in the Regulations (page 22)

Item Column 1 CAS Registry Number Column 2 Name of Substance Column 3 Concentration (% mass/mass) Column 4 Minimum Quantity (tonnes) Column 5 Hazard Category (Short Form)
7 7647-01-0 Hydrochloric acid 30 6.8 I
8 7664-39-3 Hydrofluoric acid 50 0.45 I
15 10035-10-6 Hydrobromic acid 10 1.13 I

Maximum capacity of the largest container system

Maximum capacity calculations

1st container system (tank 1 + tank 2 + 1 pipe + ½ pipe): 2 500 + 15 000 + 1 pipe (100) + ½ pipe (100) = 17 650 U.S. Gallons

2nd container system (tank 3 + ½ pipe): 30 000 + ½ pipe (100) = 30 050 U.S. Gallons

The largest container system has 30 050 U.S. Gallons. Convert this value to tonnes.

The maximum capacity of the single largest container system is 143.15 tonnes.

Each individual E2 substance will need to be calculated for the total quantity on-site.

Hydrochloric acid

Hydrofluoric acid

Hydrobromic acid

E2 Substance % Tonnes (on-site)
Hydrochloric acid 30 57.68
Hydrofluoric acid 60 123.97
Hydrobromic acid 10 28.91

Schedules to fill out

E2 Substance Meets Container System Site vs E2 (tonnes) Meets Total Quantity On-site vs E2 (tonnes) Schedules to fill out
Hydrochloric acid 143.15 ≥ 6.80 Yes 57.68 ≥ 6.80 Yes 2, 3, 4, 5
Hydrofluoric acid 143.15 ≥ 0.45 Yes 123.97 ≥ 0.45 Yes 2, 3, 4, 5
Hydrobromic acid 143.15 ≥ 1.13 Yes 28.91 ≥ 1.13 Yes 2, 3, 4, 5

APPENDIX 4

Additional Guidance on Certain Exclusions

Substance exclusions

2(2)(a)

The exclusion reads as follows:

A substance that is identified in column 5 of Part 1 of Schedule 1 as combustible or likely to explode and

The first part of this exclusion targets specifically the substances listed in Part 1 of Schedule 1. More importantly, the substances that can be used for this exclusion needs to have a hazard category of either combustible (C) and/or explosion hazard (E). Thus, only substances categorized as C and/or E that are listed in Part 1 of Schedule 1 are applicable for this exclusion. Also, a mixture involving (C) and/or (E) will be excluded if the flashpoint is greater than 23 °C and the boiling point is greater than 35 °C.

Since natural gas in its gaseous form is not listed under Schedule 1, this exclusion prevents any components of natural gas, such as methane, butane, etc., from being used to capture natural gas, because natural gas in its gaseous form is to be excluded in the Regulations.

2(2)(d)

The exclusion reads as follows:

A substance that is regulated under the Transportation of Dangerous Goods Act, 1992 or the Canada Shipping Act, 2001;

Any chemical that is in transportation, being loaded or offloaded from a means of transportation and regulated under either the Transportation of Dangerous Goods Act, 1992, or the Canada Shipping Act, 2001, is exempted from the Regulations. However, these acts do not apply once the substance is unloaded at site, which is when the Regulations are applicable to the substance.

Quantity exclusions

3(2)(a)

The quantity exclusion reads as follows:

Quantities of the substance that are located at the facility for a period of 72 hours or less, unless the substance is loaded or unloaded at the facility, if, during that period, the person keeps evidence of the date and time at which the quantities of the substance arrived at the facility.

Technical Guidelines for the Environmental Emergency Regulations, 2019

Before attempting to identify if this quantity exemption is valid or not, one must verify if the substance is not excluded in 2(2).

The 3(2)(a) exclusion targets the quantities that are at the facility for up to a maximum of 72 hours. The quantities of the substance are not loaded or unloaded at the site. For this exclusion to be applicable, a record of the date and time must be kept to prove the quantities of the substance were only kept on-site for the 72-hour period, and were not loaded or unloaded during this time.

3(2)(d)

The quantity exclusion reads as follows:

Quantities of the substance set out in item 17 of part 1 of Schedule 1 that are in a container system that has a maximum capacity of less than 10 t and is located at least 360 m from all points along the boundary of the facility;

See flow chart below.

APPENDIX 5

Checklist to Prepare an Environmental Emergency Plan

Subsections 4(2), 4(3) and 5(1)

Checklist to Prepare an E2 plan Checklist to Prepare an E2 plan Checklist to Prepare an E2 plan
Subsection or paragraph of the Regulations Ask Yourself
4(2)(a) Description of properties and characteristics of the substance and the maximum expected quantity of the substance at the facility
Is the information on the properties and the characteristics of the substances complete (e.g. colour, vapour pressure, boiling point, solubility, explosive, flammability, toxicity)?
Are there safety data sheets (SDSs) for the substances?
Are all SDS sections completed?
Are they up to date? (max. 3 years old)
4(2)(b) Description of activities (commercial, manufacturing, processing or other) involving the substance that takes place at the facility
Is the type of activity involving each particular E2 substance at the facility well described?
4(2)(c) Description of the facility and of the area surrounding the facility that may be affected by an environmental emergency referred to in paragraph (d)
Is there a map, detailed plan or complete description of the installation (facility) and its surroundings?
Does the surrounding area include any sensitive receptors, including hospitals, schools, residential, commercial or industrial buildings, and any highways, public transit infrastructure, parks, forests, wildlife habitats, water sources or water bodies?
Are they up to date?
Are the following elements clearly indicated on the facility plan?
Location of the dangerous substances
Location of personal protective equipment
Fire extinguishers
Emergency exits
Is there a plan or procedure to segregate incompatible substances?

Are the sensitive areas (hospitals; schools;

residential, commercial or industrial buildings;

highways; public railways; bus stations; specific

flora; etc.) clearly identified?

Is all the information up to date?

4(2)(d)

Identification of any environmental emergency that could

reasonably be expected to occur at the facility and that

would likely cause harm to the environment or constitute a

danger to human life or health, including the

environmental emergency referred to in paragraph (e)

and, if applicable, that referred to in paragraph (f)

Have you identified all environmental emergencies

that can reasonably be expected to occur at the

place and that would likely cause harm to the

environment or constitute a danger to human life or

health, including worst-case and alternative

scenarios?

Has a history of internal accidents been compiled

and kept up to date?

Has a history of external accidents in similar

facilities been compiled and kept up to date?

Which analytical method was used to identify

plausible scenarios (

What if

,

HAZOP, fault-tree

,

etc.)?

Did a multidisciplinary team participate in

identifying and evaluating risks? If so, who

participated (operators, chemists, engineers, etc.)?

Did the consequence analysis use appropriate

endpoints to calculate affected zones?

Is there a change management process?

Is there an accident investigation procedure?

Is there a procedure for investigating near-misses?

Your worst-case scenario

Is a worst-case scenario presented for each

substance?

Does the worst-case scenario involve the release

of the maximum quantity of the substance that

could be contained,

or not

, in the container system

or container that has the largest maximum

capacity?

Is it really the worst-case scenario?

Which software was used to calculate impact

distances (RMP Comp, ALOHA, PHAST, other)? (if

applicable)

Who did the modelling? Does the person have

sufficient knowledge to perform it? (if applicable)

Penalizing weather conditions?

Duration of leak?

Your alternative scenarios

Is an alternative scenario presented for each toxic

substance?

Who did the analysis?

Which software was used? Is this the best

software? (if applicable)

Who did the modelling? Does the person have

sufficient knowledge to perform modelling? (if

applicable)

Have passive and active mitigation measures been

determined? If yes, which ones were used?

Are outside hazards and possible domino effects

identified?

Is the predicted duration of the leak realistic?

4(2)(e)

Identification of the harm to the environment or danger to

human life or health that would likely result from an

environmental emergency-that is, a

worst-case

scenario

Have you identified all the harm and danger from

the worst-case scenario involving all regulated

substances on-site?

4(2)(f)

Identification of the harm to the environment or danger to human life or health that would likely result from the environmental emergency-that is, an alternative scenario that would have the longest impact distance outside the boundary of the facility

4(2)(g)

Description of the measures to be taken to prevent and

prepare for the environmental emergencies identified

under paragraph (d) and the measures that will be taken

to respond to and recover from such emergencies if they

were to occur

Mitigation measures

Safety preventive barriers (examples)

Safety protective barriers (examples)

Preparation (training, exercises)

Preparation and notification measures

Response (internal procedure)

Restoration or recovery

4(2)(h)

List of the position titles of the persons who will make

decisions and take a leadership role in the event of an

environmental emergency and a description of their roles

and responsibilities

Is there a chart or a table?

4(2)(i)

List of the environmental emergency training that has been or will be provided to prepare personnel at the facility who will respond in the event that an environmental emergency identified under paragraph (d) occurs

4(2)(j)

List of the emergency response equipment that is

necessary for the measures described in paragraph (g)

and the equipment's location

Is the location of the equipment indicated?

Does the regular and preventive maintenance

program respect the manufacturers'

recommendations?

Are the personnel qualified to do the calibration?

4(2)(k)

Description of the measures that will be taken by a

responsible person or by a responsible person and local

authorities, acting jointly, to communicate with the

members of the public who may be adversely affected by

the environmental emergency referred to in paragraph (f)

to inform them,

before

the environmental emergency

occurs

Who did the public communication: the facility or a

third party?

When?

Did you involve the local authorities (e.g.,

firefighters, police, city) in planning the measures to

be taken?

What scenario was used to identify the affected

public in the impact zone?

If an alternative scenario, was it the one that would

have the longest impact distance outside the

boundary of the facility?

Does the facility participate in a local emergency

preparedness or response committee or any public

safety committees and group that include

municipal, industry and government

representatives and citizens?

What are the measures to be taken to inform the

public before the environmental emergency occurs

(e.g., participation in a joint coordinating committee,

information session, posters, information bulletin)?

How effective are they?

How frequently have they been done?

By whom?

Is the public aware of this and have they provided

feedback?

Is there a reference to where more information and

clarifications can be obtained?

(k)(i)

The possibility that the environmental emergency could

occur

Information on the types of industries and all E2

substances on-site that can lead to an

environmental emergency?

Information on all the types of hazard from E2

substances on-site?

Information on all possible accidents scenarios on-

site that may have an adverse effect on the public

outside the facility?

Information on the prevention measures that have

been taken to reduce the risk of these accidents?

(k)(ii)

The potential effects of the environmental emergency on

the environment and on human life or health, taking into

account the factors referred to in paragraphs (a) to (c)

Information on the potential effects from all types of

hazard on-site on human life or health (loss of life,

permanent or temporary disability, minor injuries,

etc.) of the public outside the facility?

Information on the potential effects from all types of

hazard on-site on the environment (reversible or

irreversible environmental damage, fire, toxic water

contamination, etc.) outside the facility?

(k)(iii)

The measures that will be taken by the responsible

person to protect the environment and human life or

health, and the means by which the responsible person

will communicate with them, in the event that the

environmental emergency occurs

How effective are they?

4(2)(l)

The measures that will be taken … to communicate with

the members of the public …

during

and

after

an

emergency, to provide them with information and

guidance concerning the actions that could be taken by

the responsible person acting alone or jointly with local

authorities, to reduce the potential harm to the

environment and danger to human life or health, including

an explanation of how those actions help to reduce the

harm or danger

What are the measures to be taken

during

the

environmental emergency to communicate with the

members of the public who may be adversely

affected (e.g., siren, emails, automatic calls, radio

news)? Have they been accurately described in the

plan?

What are the actions that could be taken by them to

reduce the potential harm to the environment and

danger to human life or health?

Was there an explanation of how those actions will

help to reduce the harm or danger?

What are the measures to be taken AFTER the

environmental emergency to communicate with the

members of the public (e.g. press conference,

news release, public meeting, evaluation

presentations, social media)? Have they been

accurately described in the plan?

4(2)(m)

The position title of the individual who will communicate

with the members of the public referred to in paragraphs

(k) and (l)

Is there a list of position titles of individual(s) who

will communicate with the members of the public

provided in the E2 plan?

Was the list updated as necessary?

4(2)(n)

The consultations that a responsible person had with local

authorities, if any, with respect to the measures referred to

in paragraphs (k) and (l)

Did a responsible person consult with local

authorities with respect to risk communication to

the public?

Were those consultations satisfactory for both

consulting parties or were there differences of

opinion?

Was there an agreement between the facility and

local authorities on who will do the communication

to the affected public and how it will be done?

4(2)(o)

A plan of the facility showing the location of any

substances in relation to the physical features of the

facility

Does the facility plan show all the installations on-

site and the exact location of any E2 substances in

relation to the physical features of the facility?

Does the facility plan show distances between all

E2 substances and other physical features of the

facility, including property borders?

APPENDIX 6

Suggested Endpoints for the Regulations

1.0 Glossary

ADAM: Accident Damage Analysis Module - software developed in Europe for estimating impact distances for explosions, inhalation toxics and heat radiation impact distances.

AEGL-2 (1 hour): Acute Exposure Guideline Levels - the airborne concentration of a substance above which it is predicted that the general population, including susceptible individuals, could experience irreversible or other serious, long-lasting adverse health effects or an impaired ability to escape.

ERPG-2 (1 hour): Emergency Response Planning Guidelines -the maximum concentration in air below which it is believed nearly all individuals could be exposed for up to one hour without experiencing or developing irreversible or other serious health effects or symptoms that could impair their ability to take protective action.

TEEL-2 (1 hour): Temporary Emergency Exposure Limits - the airborne concentration (expressed as ppm or mg/m3) of a substance above which it is predicted that the general population, including susceptible individuals, when exposed for more than one hour, could experience irreversible or other serious, long-lasting adverse health effects or an impaired ability to escape.

IDLH (30 minutes): Immediately Dangerous to Life and Health - the maximum airborne concentration from which one could escape within 30 minutes without any escapeimpairing symptoms or any irreversible health effects.

2.0 Introduction

This section deals with suggested endpoints for inhalation, heat radiation and overpressure (explosion) effects that could be used within an E2 plan. The summarized endpoints are listed below:

Specific endpoints to model or analyze the impact from substances identified as aquatically toxic have not been included. Any modelling or analysis conducted to determine the environmental emergencies that could cause harm should focus on the release and its potential pathways to a water body. The assessment and remediation of impacted water bodies may also be subject to requirements under the Fisheries Act .

2.1 Overpressure (explosion)

A vapour cloud explosion could yield a blast wave overpressure of 20.68 kPa (3.0 psi) at a distance of 100 metres from the blast site and could have potentially lethal effects in the community beyond the fence line. Lower overpressure levels could also potentially lead

to serious or fatal injuries from indirect effects such as injury from flying glass or other debris in some cases. However, for lower pressures, the likelihood of a fatality is lower because there would be less damage to buildings and flying objects would have less force. Typically, an E2 plan would model or analyze an endpoint of 6.89 kPa (1 psi) . The table below describes estimated damages caused by overpressure.

Table 1: Overpressure Effects

Pressure Pressure Effects on Structure Effects on People
Psi kPa
0.3 2.07 • Safe distance • Damage limited to ceilings of houses • 10% window breakage Thresholds of effects delineating the area of indirect effects by window breakage on people
1.0 6.9 • Partial demolition of houses rendering them uninhabitable • 90% of windows broken • Threshold of minor structural damage Thresholds of irreversible effects delineating the 'significant hazards to human life area'
2.0 13.8 • Partial collapse of house ceilings and walls; possible damage to large hydrocarbon tanks Threshold of lethal effects delineating the 'severe hazards to human life area'
3.0 20.7 • Steel structures of buildings are damaged and torn from their foundations • 'Significant damage' threshold for glass domino effect threshold in which the effects must be analyzed Significant effects threshold delineating the 'very severe hazards to human life area'
4.4 30 • Threshold of very severe damage to structures -
7.0 48.2 • Loaded transportation containers are overturned -

CRAIM, Risk Management Guide for Major Industrial Accidents, Intended for Municipalities and Industry, p. 59, 2007.

2.2 Heat radiation

The flame from a fire can expose one to different levels of heat radiation. Typically, an E2 plan would model or analyze an endpoint of 5 kW/m 2 . There is a suggested equation to estimate the lethality base for humans exposed to heat radiation. The probit (Pr) equation comes from the software referred to as ADAM and is based on animal data.

t = seconds

After calculating Pr, one can then enter this code into Microsoft Excel to estimate the

percent human lethality = (NORMSDIST(Pr-5))*100.

This equation has been used to generate tables that may be of use for understanding exposure times and percent lethality in humans.

Table 2: Constant Time (sec) vs Increasing Heat Radiation and its Estimated Human Lethality

Time (seconds) Concentration (kW/m 2 ) %Lethality
4 5 0
4 10 0
4 15 0
4 20 0
4 25 0
4 30 0.02
4 35 0.15
4 40 0.6
4 45 1.75
4 50 4.02
4 55 7.74
4 60 13.01
4 65 19.7
4 70 27.44
4 75 35.79
4 80 44.28
4 85 52.52

Table 3: Constant Heat Radiation (kW/m2) vs Increasing Time (sec) and its Estimated Human Lethality

Concentration (kW/m2) Time (seconds) %Lethality
5 10 0
5 20 0
5 30 0
5 40 0.01
5 50 0.08
Concentration (kW/m2) Time (seconds) %Lethality
5 60 0.37
5 70 1.13
5 80 2.63
5 90 5.08
5 100 8.58
5 110 13.07
5 120 18.39
5 130 24.34
5 140 30.65
5 150 37.1
5 160 43.49
5 170 49.65

The table below describes the effects of heat radiation upon structures and humans.

Table 4: Effects of Heat Radiation

Radiation (kW/m 2 ) Effects on Structure Effects on People
1.2 - Received from the sun at noon in summer 2
1.6 - Will not cause discomfort even after a long exposure period 1
2 - Minimum to cause pain after 1 minute 2
3 - Irreversible effects threshold delineating the 'significant hazards to human life area' 1
4 - Sufficient to cause pain to employees unable to take cover within 20 seconds. However, skin blistering is possible (2nd degree burns) 1 0% mortality 1
Less than 5 - Will cause pain in 15-20 seconds after injury after 30-second exposure 2
5 Significant destruction of glass threshold 1 Second degree burns after 20 seconds 1 Lethal effects threshold delineating the 'severe hazards to human life area' 1
Greater than 6 - Pain within approximately 10 seconds; only rapid escape is possible 2
Radiation (kW/m 2 ) Effects on Structure Effects on People
8 Domino effects threshold corresponding to the severe damage to structures threshold 1 Lethal effects hazard delineating the 'very severe hazards to human life area' 1
9.5 - Pain threshold reached after 8 seconds 1 Second degree burns after 20 seconds 1
12.5 Minimal energy required to ignite wood in the presence of an open flame and melt plastic tubing 1 *Thin steel with insulation on the side away from the fire may reach thermal stress level high enough to cause structural failure 2 Significant chance of fatality for medium duration exposure 2
25 Spontaneous ignition of wood after long exposure 2 Unprotected steel will reach thermal stress temperatures that can cause failure 2 Likely fatality for extended exposure and significant chance of fatality for instantaneous exposure 2
35 Cellulosic material will pilot ignite within one minute's exposure 2 Significant chance of fatality for people exposed instantaneously 2

2.3 Inhalation toxics

When an emergency occurs involving the release of toxic substances, there are some Public Exposure Guidelines that establish endpoints effect that will help industry predict how members of the general public would be affected. We suggest using one of the four most common endpoint values for modelling or calculating impact distances for E2 substances that are toxic by inhalation in this specific order : AEGL-2 4 (60-minute), ERPG-2 (60-minute), TEEL-2 (60-minute) and 1/10 of IDLH (30-minute). AEGL-2 is recommended to be used as a first choice endpoint since this concentration is designed to protect sensitive individuals such as old, sick, or very young people. The table below has been assembled from the Web as a convenient reference for inhalation toxic endpoints. The values indicated as (F) are final for AEGL, but other values may be subject to change over time.

Table 5: Potential endpoints for inhalation hazard substances included in the

4 AEGL values are developed for different exposure durations (10 min, 30 min, 60 min, 4 hours and 8 hours). ECCC recommends to choose the AEGL value with the exposure duration that is equal to or above the substance release time suggested in the scenario identified in the E2 plan. For example, if your scenario has a release time of 40 minutes then you have to choose AEGL-2 60 min. For a release time of 90 minutes, you will have to choose AEGL-2 4 hours.

Regulations

Item CAS # E2 Substance Name AEGL-02 a ERPG-02 b TEEL-2 c IDLH d (1/10)
1 50-00-0 formaldehyde, solution 14 (I) 10 14 20 (2)
2 57-14-7 1,1-dimethylhydrazine 3.0 (F) None 3 15 (1.5)
3 60-34-4 methylhydrazine 0.90 (F) None 0.9 20 (10)
4 64-19-7 acetic acid None 35 35 50 (5)
5 67-66-3 chloroform 64 (F) 50 64 500 (50)
6 74-83-9 methyl bromide 210 (F) 50 210 250 (25)
7 74-87-3 methyl chloride 910 (F) 1000 910 2000 (200)
8 74-88-4 methyl iodide 82 (P) 50 50 100 (10)
9 74-90-8 hydrogen cyanide 7.1 (F) 10 7.1 50 (5)
10 74-90-8 hydrocyanic acid 7.1 (F) None 7.1 None
11 74-93-1 methyl mercaptan 23 (F) 25 23 150 (15)
12 75-09-2 dichloromethane 560 (I) 750 560 2300 (230)
13 75-15-0 carbon disulphide 160 (F) 50 160 500 (50)
14 75-21-8 ethylene oxide 45 (F) 50 45 800 (80)
15 75-44-5 phosgene 0.30 (F) 0.5 0.3 2 (0.2)
16 75-55-8 propyleneimine 12 (F) None 12 100 (10)
17 75-56-9 methyloxirane 290 (F) 250 290 400 (40)
18 75-74-1 tetramethyl lead None None 4 mg/m 3 40 mg (lead)/m 3 (4)
19 75-77-4 trimethylchlorosilane 22 (F) 20 22 None
20 75-78-5 dimethyldichlorosilane 11 (F) 10 11 None
21 75-79-6 methyltrichlorosilane 7.3 (F) 3 7.3 None
22 76-06-2 trichloronitromethane 0.15 (I) 0.15 0.15 2 (0.2)
23 78-00-2 tetraethyl lead None None 4 mg/m 3 40 mg (lead)/m 3 (4)
24 78-82-0 isobutyronitrile 2.0 (F) 30 2 None
25 79-21-0 Peracetic acid 1.6 mg/m 3 (F) None 1.6 mg/m 3 None
26 79-22-1 methyl chloroformate 2.2 (F) 2 2.2 None
27 91-08-7 toluene-2,6-diisocyanate 0.083 (F) 0.15 0.083 None
28 106-89-8 oxirane (chloromethyl)- 24 (F) 20 24 75 (7.5)
29 107-02-8 acrolein 0.10 (F) 0.15 0.1 2 (0.2)
30 107-05-1 allyl chloride 54 (I) 40 54 250 (25)
31 107-06-2 1,2-dichloroethane None 200 200 50 (5)
Item CAS # E2 Substance Name AEGL-02 a ERPG-02 b TEEL-2 c IDLH d (1/10)
32 107-07-3 2-chloroethanol 1.2 (F) None 1.2 7 (0.7)
33 107-11-9 allylamine 3.3 (F) None 3.3 None
34 107-12-0 propionitrile 3.0 (F) None 3 None
35 107-13-1 acrylonitrile 1.7 (F) 35 1.7 85 (8.5)
36 107-15-3 ethylenediamine 9.7 (F) None 9.7 1000 (100)
37 107-18-6 allyl alcohol 1.7 (F) None 1.7 20 (2)
38 107-30-2 chloromethyl methyl ether 0.47 (F) 1 0.47 None
39 108-05-4 vinyl acetate 36 (F) 75 36 None
40 108-23-6 isopropyl chloroformate 3.3 (F) 5 3.3 None
41 108-91-8 cyclohexylamine 8.6 (F) None 8.6 None
42 108-95-2 phenol 23 (F) 50 23 250 (25)
43 109-61-5 propyl chloroformate 3.0 (F) None 3.7 None
44 110-00-9 furan 6.8 (F) None 6.8 None
45 110-89-4 piperidine 33 (F) None 33 None
46 123-73-9 trans -crotonaldehyde 4.4 (F) None 4.4 None
47 123-91-1 1,4-dioxane 320 (I) None 320 500 (50)
48 126-98-7 methylacrylonitrile 1.0 (F) None 1 4 (0.4)
49 151-56-4 ethyleneimine 4.6 (F) None 4.6 100 (10)
50 302-01-2 hydrazine 13 (F) 5 13 50 (5)
51 353-42-4 boron trifluoride dimethyl etherate None None 29 None
52 463-51-4 ketene 0.063 (F) None 0.063 5 (0.5)
53 506-68-3 cyanogen bromide None None 44 None
54 506-77-4 cyanogen chloride None 0.05 0.05 None
55 509-14-8 tetranitromethane 0.52 (F) None 0.52 4 (0.4)
56 542-88-1 bis(chloromethyl) ether 0.044 (F) 0.1 0.044 None
57 556-64-9 methyl thiocyanate None None 28 None
58 584-84-9 toluene-2,4-diisocyanate 0.083 (F) 0.15 0.083 2.5 (0.25)
59 594-42-3 perchloromethyl mercaptan 0.3 (F) None 0.3 10 (1)
60 624-83-9 methyl isocyanate 0.067 (F) 0.25 0.067 3 (3)
61 630-08-0 carbon monoxide 83 (F) 350 83 1200 (120)
62 814-68-6 acryloyl chloride None None 0.24 None
63 1336-21-6 ammonium hydroxide None None 330 None
64 2551-62-4 sulphur hexafluoride None None 33000 None
65 4170-30-3 crotonaldehyde 4.4 (F) 5 4.4 50 (5)

Technical Guidelines for the

Environmental Emergency Regulations, 2019

Item CAS # E2 Substance Name AEGL-02 a ERPG-02 b TEEL-2 c IDLH d (1/10)
66 7439-97-6 mercury 1.7 mg/m 3 (I) 0.25 (vapour) 1.7 10 mg (Hg)/ m 3 (1)
67 7446-09-5 sulphur dioxide 0.75 (F) 3 0.75 100 (10)
68 7446-11-9 sulphur trioxide 8.7 mg/m 3 (I) 10 mg/m 3 8.7 None
69 7550-45-0 titanium tetrachloride 1.0 (I) 20 mg/m 3 1 None
70 7616-94-6 perchloryl fluoride 4.0 (F) None 4 100 (10)
71 7637-07-2 boron trifluoride 29 mg/m 3 (F) 30 mg/m 3 29 25 (2.5)
72 7647-01-0 hydrogen chloride, anhydrous 22 (F) 20 22 50 (5)
73 7647-01-0 hydrochloric acid None None 22 None
74 7664-39-3 hydrogen fluoride, anhydrous 24 (F) 20 24 30 (3)
75 7664-39-3 hydrofluoric acid None None 24 None
76 7664-41-7 ammonia, anhydrous 160 (F) 150 160 300 (30)
77 7664-41-7 ammonia solution None None 160 None
78 7697-37-2 Nitric acid 24 (F) 10 24 25 (2.5)
79 7719-09-7 thionyl chloride 2.4 (I) 2 2.4 None
80 7719-12-2 phosphorus trichloride 2.0 (F) 3 2 25 (2.5)
81 7723-14-0 phosphorus 11 mg/m 3 (P) None 3 5 mg/m 3 (0.5)
82 7726-95-6 Bromine 0.24 (F) 0.5 0.24 3 (0.3)
83 7782-41-4 Fluorine 5.0 (F) 5 0.17 25 (2.5)
84 7782-50-5 chlorine 2.0 (F) 3 2 10 (1)
85 7783-06-4 hydrogen sulphide 27 (F) 30 27 100 (10)
86 7783-07-5 hydrogen selenide 0.11 (F) 0.2 0.11 1 (0.1)
87 7783-60-0 sulphur tetrafluoride None None 0.1 None
88 7784-34-1 arsenous trichloride None None 10 None
89 7784-42-1 arsine 0.17 (F) 0.5 0.17 3 (0.3)
90 7790-94-5 Chlorosulfuric acid 4.4 mg/m 3 (I) 10 mg/m 3 4.4 mg/m 3 None
91 7803-51-2 phosphine 2.0 (F) 0.5 2 50 (5)
92 7803-52-3 stibine 1.5 (I) 0.5 1.5 5 (0.5)
93 8014-95-7 sulphuric acid, fuming 8.7 mg/m 3 (I) 10 mg/m 3 8.7 mg/m 3 None
Item CAS # E2 Substance Name AEGL-02 a ERPG-02 b TEEL-2 c IDLH d (1/10)
94 10025-87-3 phosphorus oxychloride None None 0.48 None
95 10035-10-6 hydrogen bromide 40 (F) None 40 30 (0.3)
96 10035-10-6 hydrobromic acid None None 40 None
97 10049-04-4 chlorine dioxide 1.1 (F) 0.5 1.1 5 (5)
98 10102-43-9 nitric oxide None None 12 100 (10)
99 10102-44-0 nitrogen dioxide 12 (F) 15 12 20 (2)
100 10294-34-5 boron trichloride 29 mg/m 3 (F) None 71 None
101 13463-39-3 nickel carbonyl 0.036 (F) None 0.036 2 (0.2)
102 13463-40-6 iron pentacarbonyl 0.060 (F) None 0.06 0.4 (0.04)
103 19287-45-7 diborane 1.0 (F) 1 1 15 (1.5)
104 20816-12-0 osmium tetroxide 0.0084 (I) None 0.0084 1 mg (Os)/m 3 (0.1)
105 26471-62-5 toluene diisocyanate None None 0.083 None

REFERENCES

AIHA, 2011. American Industrial Hygienist Association. Emergency Response Planning Guidelines (ERPG). U.S. Department of Energy. Available at: https://www.aiha.org/get-involved/aiha-guideline-foundation/erpgs

CRAIM, 2002. Risk Management Guide for Major Industrial Accidents. Conseil pour la réduction des accidents industriels majeurs (CRAIM). Montréal, Quebec.

CRAIM, 2017. Conseil pour la réduction des accidents industriels Majeurs (CRAIM)/Major Industrial Accidents Reduction Council (MIARC). Risk Management Guide for Major Technological Accidents, 7th Edition, 2017, Montréal, Québec. www.craim.ca

Environment Canada, 1995. Toxic Substances Management Policy. Persistence and Bioaccumulation Criteria. Website accessed in October 2011: http://www.ec.gc.ca/toxiques-toxics/default.asp?lang=En&n=2A55771E-1

Environment Canada, 2000. Persistence and Bioaccumulation Regulations (SOR/2000107). Website accessed in October 2011:

http://www.ec.gc.ca/lcpe-cepa/eng/regulations/detailReg.cfm?intReg=35

IARC, 1999. IARC Monographs Database on Carcinogenic Risks to Humans. International Agency for Research on Cancer, World Health Organization. Website accessed in December 2002: http://monographs.iarc.fr/

J.P. Lacoursière Inc., 2002. Rationale for the Development of a List of Regulated Substances under CEPA Section 200 and their Threshold Quantities . Prepared for Environment Canada, National Program Directorate, Environmental Emergencies Branch, Ottawa. Project No. P00092.

https://www.canada.ca/en/environment-climate-change/services/canadianenvironmental-protection-act-registry/publications/rationale-list-regulatedsubstances.html

NFPA, 2002. Fire Protection Guide to Hazardous Materials, 13th Edition. Editors: Amy B. Spencer, G.R. Colonna, National Fire Protection Association, One Batterymarch Park, Quincy, MA, ISBN: 0-87765-473-5, Lists 325 & 49, 2002.

NIOSH, 1994. Documentation for Immediately Dangerous to Life or Health Concentrations (IDLH). National Institute for Occupational Safety and Health. Center for Disease Control and Prevention.

http://www.cdc.gov/niosh/idlh/intridl4.html

OECD, 2001. Guidance Document on the Use of the Harmonised System for the

Classification of Chemicals which are Hazardous for the Aquatic Environment, No. 27. In: Harmonised Integrated Hazard Classification System for Human Health and Environmental Effects of Chemical Substances . OECD Environment, Health and Safety Publications. Series on Testing and Assessment Number 33, pp. 127-247. http://www.oecd.org/document/24/0,3746,en_2649_34377_47858904_1_1_1_1,00.html

U.S. EPA, 1986. Guidelines for Carcinogen Risk Assessment. Federal Register 51(185):33992-34003. Environmental Protection Agency. Available at: https://cfpub.epa.gov/ncea/risk/recordisplay.cfm?deid=54933